Home / IAG / Determination 900738
Determination 900738
Storm damage claim: replacement of asbestos roof declined
Summary
Homeowners claimed storm damage to an asbestos roof and poor claim handling. AFCA found no evidence the storm damaged the roof, so its replacement is not covered, but ordered payment of accepted internal water damage and $1,000 non-financial loss.
The roof damage was consistent with gradual deterioration and wear and tear, which the policy excludes, and the storm did not directly damage the roof.
Issues
- Claim denial primary · not upheld“No persuasive evidence the storm caused any specific damage to the roof; damage consistent with wear, tear and gradual deterioration.”
- Delay secondary · upheld“I accept the delay in receiving this decision likely upset the complainants; insurer accepted it could have handled the complaint better.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Related
Text of the determination
Determination
Case number 900738
Financial firm Insurance Australia Limited
Determination | Case number: 900738 Page 2 of 7
Case number: 900738 28 March 2023
1 Determination overview
1.1 Complaint
The complainants hold a home buildings and contents insurance policy underwritten by the
financial firm (insurer). They lodged a claim for storm damage to the home, which they say
occurred on or about 25 February 2022. This involved water coming in through the roof of the
property and causing internal damage to the home.
The insurer accepted the claim for the resultant damage but says it is not liable to replace the
asbestos roof of the home. It says water entered due to the deteriorated state of the roof and
there is nothing to show it was specifically damaged by the storm.
The complainants disagree and seek indemnity for the replacement of the asbestos roof and
compensation for what they say is the insurer’s poor handling of the matter .
1.2 Issues and key findings
Is the insurer liable to cover any damage to the roof?
No. There is no persuasive evidence the storm caused any specific damage to the roof. To
the extent there is damage present, this is consistent with gradual deterioration, wear and
tear, which the policy excludes.
Is a further award of compensation appropriate?
No. The insurer offered to pay compensation for non-financial loss of $1,000. On balance, this
is a fair and appropriate offer and no additional amount is required to be paid.
Why is the outcome fair?
The exchanged material does not show the storm caused any specific damage to the
asbestos roof. It would not be fair in these circumstances to require the insurer to replace it.
The insurer accepted it could have handled the complaint better, it offered non-financial loss
compensation of $1,000. This is a fair outcome in the circumstances.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to cover the replacement of the roof. If it has not already done so,
it should pay $6,188.07 for the internal damage to the home, less any applicable policy
deductions. The insurer is also to pay compensation for non-financial loss of $1,000.
There is no need to pay any interest.
Determination | Case number: 900738 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer liable to cover any damage to the roof?
No. There is no persuasive evidence the storm caused any specific damage to the roof. To
the extent there is damage present, this is consistent with gradual deterioration, wear and
tear, which the policy excludes.
Complainants say there were no issues with the home prior to the storm
The complainants say they have lived in the home for about 15 years and never previously
had an issue with water ingress. The first time this happened was on the day of the loss.
They say they regularly maintained the roof and had contractors look at it in 2017 and 2021
and undertook the recommended maintenance. The complainants consider the asbestos roof
was damaged by the storm event and that the insurer should be liable to replace it.
Policy covers storm damage subject to terms and conditions
The insurer’s policy is made up of the Certificate of Insurance (COI) and the Product
Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the
complainants.
The policy covers damage caused by one of the listed events. It does not provide cover for all
damage. Amongst the listed events is cover for loss or damage caused by a storm. A ‘storm’
is defined in the PDS as:
rain, thunderstorm, hail, snow
violent wind, cyclone, tornado.
The policy also has terms and exclusions which apply in certain situations.
Insurer’s experts say water came into the roof area from lifted roof sheets
The insurer arranged for roofing plumber PS to review the damage. PS considers the
verandah leak was due to wind driven rain lifting the sheets and permitting water entry. It
confirmed there was water ingress damage to the home. PS found ‘visible gaps from the
ridge capping to the asbestos roof sheets’. It also noted there were ‘multiple deteriorated and
aged screws’ and broken barge capping.
PS was ‘unable to determine’ if the damage was from a singular event. It recommended a
roof contractor be retained to repair the ridge capping, screws and lifted roof sheets.
The insurer also had builder BB review the damage. BB largely concurred with PS’s view . BB
considered the walk-in robe was damaged by water entry through the gaps in the ridge
capping to the roof sheets. It also suggested the complainants should install more drainage
and remove some of the wall cladding so they can seal the area between the concrete wall
and the roof.
Photos of the roof show it is aged and worn, with lifted capping and damage present. There is
no persuasive evidence of any specific storm damage.
Determination | Case number: 900738 Page 4 of 7
Restorer LX considered rainwater got into the wall cavity ‘maybe from the balcony’ to cause
damage in the main bedroom and the common area. Bedroom two was reportedly damaged
by rain coming in from above the window and running down the wall into the carpet.
Complainants arranged for own expert to inspect the roof
The complainants disagree with the insurer’s findings. They refer to reports they obtained to
show the damage must have been caused by the storm.
Builder MH described the asbestos roof as being in ‘quite good condition’, noting a small
piece missing from barge capping that was ‘superficial’. MH suggested it was possible the
house ‘over the years’ developed small gaps between the roof sheets. It says this permitted
movement and water ingress due to the ‘extreme volume of rain and wind’ in February 2022.
MH quoted $40,025 to replace the roof.
The complainants say PS did not identify which roof sheets lifted to permit water ingress. I
acknowledge there may be some uncertainty about this, although MH (which agreed water
got through the roof sheets) did not specify individual roof sheets either.
Whether it was through separation over time or through wind driven rain (or a combination of
both), PS and MH agree water got into the ceiling area through the roof sheets. Neither
identified any specific damage which was caused to the roof by the rain or storm.
The complainants provided details of prior maintenance reviews of the roof:
roofer AH inspected possible storm damage in late 2017. It found the roof was 40+ years
old and there were no ‘immediate’ repairs required
roofer ZR found in 2021 there was water coming out from the gable ends. This may have
been due to someone walking on the roof or it ‘being hit by a heavy object’. ZR noted
some areas of old damage show evidence of silicone repair.
No persuasive evidence the storm damaged the roof at all
The insurer accepts the home sustained storm damage from water intrusion. It says the cost
to repair this damage amounts to $6,188.07. The complainants do not dispute this figure. The
insurer agreed to cover the damage caused by water entry.
Based on the exchanged material, I accept there is some deterioration present to the
complainants’ roof. It is possible water entered through these areas. It is also possible there
was some water ingress above the window, as suggested by LX. However, I consider most of
the damage was caused by wind driven rain getting under the roof sheets.
I am satisfied there is no apparent evidence of storm damage to the roof. I accept the
observed damage, on balance, was consistent with wear, tear and gradual deterioration.
Insurer is not required to cover the replacement of the roof
As there is no direct evidence the storm damaged the roof itself, I am satisfied the insurer is
not liable to replace it.
The complainants say there are no lifted roof sheets on the roof. I acknowledge there was
likely no permanent damage to the roof from the storm. This does not mean the storm could
not or did not temporarily raise some roof sheets and permit water ingress. It is the most likely
cause of the damage proposed by PS and MH. There is no other obvious point of rainwater
ingress.
Determination | Case number: 900738 Page 5 of 7
Given this, I accept the insurer is not liable to replace the roof. There is no persuasive
evidence it sustained any damage from this event. If the roof needs to be replaced, this is due
to the deterioration caused to it over time, not the storm. The insurer’s policy says it does not
cover loss or damage arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
The only damage visible on the roof is consistent with the above description. I am satisfied if
the complainants need to replace the roof it is due to the above reasons, not the storm. The
roof’s replacement is an expense the complainants are liable for, n ot the insurer.
Section 46 of the Insurance Contracts Act 1984 does not assist complainants
The complainants raised section 46 of the Insurance Contracts Act 1984 (the Act), believing
they should be covered for the replacement of the roof.
They refer to MH’s view that ‘the ridge was built with a very small slip piece of super six
[roofing] under the caps’ . The complainants say if this is a defect with the construction of the
roof, and if it permitted water to ingress, they should be entitled to protection under section 46
of the Act.
Section 46 details what happens if a claim is made for a loss relating to a defect or
imperfection in a thing. Where the insured was not reasonably aware of the defect, the insurer
cannot rely on an exclusion that refers to the condition of the thing prior to the insurance
contract.
I am satisfied there is no persuasive evidence of a building defect to account for any claimed
damage. This alone means the cited section does not apply.
Further, the insurer has not relied on any policy exclusion relating to a defect. Even if it did,
the courts have said section 46 only has application where the relevant exclusion makes a
reference to a period of time (such as ‘before the contract’) . This was not the case.
Given this, I am satisfied section 46 of the Act does not apply to assist the complainants.
2.2 Is a further award of compensation appropriate?
No. The insurer offered to pay compensation for non-financial loss of $1,000. On balance, this
is a fair and appropriate offer and no additional amount is required to be paid.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Insurer agreed to pay compensation of $1,000 and this is fair
The complainants seek compensation for non-financial loss. They say the insurer:
failed to assess the claim in a timely manner
relied only on reports that supported its position
Determination | Case number: 900738 Page 6 of 7
caused them to incur consequential loss arising from required repairs they believe were
not assessed correctly
failed to assess the claim within a reasonable period.
I acknowledge there was some inconvenience for the complainants and some delays in
relation to the consideration of their claim. This is not unusual. The initial decision was issued
within five months of the claim lodgement, after consideration of evidence from several
experts. I accept the delay in receiving this decision likely upset the complainants.
The insurer offered to pay non-financial loss compensation of $1,000. I am satisfied this was
a fair offer. There is no persuasive evidence to show the insurer should provide an increased
offer. Given this, I am not persuaded the insurer should be required to pay an increased
amount.
Determination | Case number: 900738 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.