Home / Suncorp Group / Determination 900277

Determination 900277

Storm claim: mould remediation, pool surrounds, retaining wall, cash settlement, temporary accommodation and electric gate

FirmSuncorp Group
Decided2023-10-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

After storm damage to a home, the insurer declined parts of the claim and delayed mould remediation. AFCA found for the complainant on mould, pool surrounds, cash settlement, temporary accommodation and the gate, upheld the retaining wall exclusion, and awarded $4,000 non-financial loss.

The storm was the proximate cause of the pool damage and the insurer's delays spread the mould, but the policy clearly excludes storm damage to retaining walls.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay non financial lossreassess claimrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 900277 Financial firm AAI Limited Determination | Case number: 900277 Page 2 of 14 Case number: 900277 22 September 2023 1 Determination overview 1.1 Complaint The complainant held a home and Contents policy with the financial firm (insurer) and lodged a claim on 6 March 2022 after a storm damaged the property The insurer assigned several assessors to determine its liability for the contents and building damage. Throughout the assessment process, concerns were raised regarding the spread of mould, the need for temporary accommodation (TA) and delays in the assessment. Currently, the following issues have arisen during the claim assessment: > whether the insurer is liable for damage to the retaining wall and pool area and mould remediation to the attic and subfloor? > whether the insurer is entitled to cash settle the downstairs area and, if so, whether the cash settlement offered is fair and reasonable? > whether she is entitled to further TA cover? > whether the insurer is liable for the electric gate? 1.2 Issues and key findings Is the insurer liable for mould remediation of the attic and subfloor? Yes. It is fair the insurer remediates the mould in the attic and subfloor area. The insurer should be allowed to assess if there are points of water ingress contributing to the mould growth. Any repairs should be completed by the complainant prior to the mould remediation. Is the insurer liable for the damage to the pool surrounds? Yes. The insurer is liable for the damage to the concrete slab and pavers surrounding the pool as the proximate cause of the damage was the storm. Is the insurer liable for damage to the retaining wall? No. The terms of the policy are clear. Damage to a retaining wall caused by storm is excluded. Is the insurer entitled to cash settle the downstairs area? Yes. I t is fair for the insurer to cash settle the repairs to the downstairs area . Given the differences in assessment between the Complainant and insurer reports, the panel determines that two independent reports be obtained by the insurer. The insurer is to pay the higher assessed quote plus an uplift of 20% to cover contingencies. Is the complainant entitled to further temporary accommodation (TA)? Yes. Due to the delays in mould remediation and assessment of damage it is fair for the insurer to cover the reasonable temporary accommodation costs until the home is habitable. Determination | Case number: 900277 Page 3 of 14 Is the complainant entitled to compensation for non-financial loss? Yes. The insurers claims handling has caused an unusual degree of inconvenience and stress for the complainant. It is fair the complainant be paid compensation of $4,000 for non- financial loss. Is the insurer responsible for the electrical gate repairs? Yes. The complainant signed a repairs competition certificate supplied by the insurer’s trade . The insurer is required to determine whether the repairs were conducted correctly. If not, then the insurer is required to rectify the repairs. Why is the outcome fair? The outcome is fair as it considers the various submissions of the parties to achieve a fair outcome under the terms of the policy and the circumstances of the claim. 1.3 Determination This determination is in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the insurer is to: > appoint a loss adjuster to assess whether there is water seepage contributing to the mould in the attic and subfloor. Subject to completion of any necessary repairs the insurer is to complete the mould remediation as required > appoint two independent builders as set out in section 2.4 of this determination to prepare a scope of works (SOW) and repair quote based on the agreed repairs including the pool surrounds. The insurer is to then offer to settle the repairs based on the higher quotation received plus a 20% uplift to cover contingencies. > appoint a contractor to assess its repairs to the electrical gate and if necessary complete any required repair. > pay the complainants ongoing TA until the home is habitable > pay the complainant $4,000 compensation for non-financial loss pursuant to AFCA Rule D3.3. The insurer is otherwise entitled to deny liability for the damage to the retaining wall and the pre-existing damage. Determination | Case number: 900277 Page 4 of 14 2 Reasons for determination 2.1 Is the insurer liable for mould remediation of the attic and subfloor? Yes. It is fair the insurer remediates the mould in the attic and subfloor area. The insurer should be allowed to assess if there are points of water ingress contributing to the mould growth. Any repairs should be completed by the complainant prior to the mould remediation. Claim for mould initially declined There is no dispute that the complaint’s property was damaged in a storm in March 2022. T The insurer initially appointed STM to assess and report on the mould. STM conducted several assessments throughout June 2022 which detail: > extensive mould (including mould) present at the property on first attendance in early June 2022 > over three visits, the mould was remediated, and attempts are sectioning off badly impacted areas were made, but it never contained the mould spread > dehumidifiers were requested, but never installed. STM outlined that it was not required on their attendance on 30 June 2022, however no testing was conducted to support this position. The appointed engineer CRD reported on 16 June 2022 that mould remediation was required as soon as possible. Further, CRD recommended: > structural drying to the subfloor for a duration of minimum 12 months with constant supervision and inspection on regular basis until the clay soil turns dry > isolation of the lower ground area and structural drying for a period of two months with constant supervision after the removal of microbial growth to proceed with rectification works to the property. The claim was declined on 5 July 2022. The complainant contested this, leading to further assessment and eventually an overturn of the decline by the insurer’s internal dispute resolution (IDR) team. The insurer accepted liability for damage to the lower ground floor area and for mould remediation throughout the property but excluded liability for the attic and subfloor. Further extensive mould testing was required to scope the required remediation, which occurred on 19 August 2022. The report, from MCPC, outlines: > high levels of humidity (exceeding 70% In all areas) > high spore counts in all areas, active hyphal structures indicate ongoing mould growth > HEPA and dehumidifiers are required to address the mould issue > all water ingress issues require rectification prior to remediation beginning and all impacted contents be removed from site. Delays in accepting claim resulted in spread of mould On 31 August, the complainant contacted the insurer to outline her concerns regarding the scope of the mould remediation. Determination | Case number: 900277 Page 5 of 14 Her builder EBC conducted an assessment on 22 August 2022 outlining the further mould that requires remediation. The report provides extensive photos to show the mould present at the property. It highlights mould in areas not previously assessed by the insurer ’s trades. The insurer appointed an assessor IA to review the claim. IA reported on 29 September 2022 that: > ceiling/attic area not to be considered within mould remediation/PVC check due to it not being a living area > complainant to provide proof that area was mould free prior to event to allow for consideration > ceiling cavities are prone to mould and previous water damage from previous event not repaired. > MCPC were appointed to undertake a further mould inspection on 6 December 2022. MCPC noted: > spore concentration indoors still considered high and very high > wood rot was present in the bottom level with visible mould > water damaged/impacted areas of property appear to be the result of multiple water ingress events from multiple sources > samples collected from subfloor and ceiling spaces reflect the same spores within the property > attic and subfloor spaces were classed as ‘non - living areas’. The IA reported on 4 January 2023 that there was no additional scope for mould remediation/repairs due to the complainant not actioning any of the required drainage maintenance work to rectify the water ingress seepage issues. The insurer argues the attic and subfloor were not habitable areas and therefore it is not liable. The panel disagrees. Liability for mould remediation is not limited to habitable space. The policy does not limit liability in such a way but rather the insurer is liable for damage to the property arising from the insured event. The panel notes: > that m ould remediation was not completed per STM’s own recommendation > the claim was incorrectly declined resulting in further delays leading to further mould spread > the claim has been further delayed due to back and forth discussion between the complainant and the insurer regarding the scope of works for the mould remediation > the mould spores in the ceiling and subfloor areas are reflective of those throughout the areas impacted by the insured event. The panel accepts that the mould has most likely spread from the downstairs area into the upstairs area. This is not disputed by either party. The panel accepts that most likely the mould had spread due to the delays in the insurers assessment of liability. Based on this, it is fair and reasonable for the insurer to extend its mould remediation scope to include the attic and the subfloor. Roof report to be obtained before mould remediation A dual assessment of the damage occurred on 5 June 2023. Following the assessment, the insurer requested a roof assessment be conducted to confirm whether there were other factors contributing to the exacerbation of mould in the upstairs area. Determination | Case number: 900277 Page 6 of 14 The insurer says it will conduct the upstairs mould remediation again, however, it needs to assess the attic space to ensure that there are no further points of water ingress facilitating the mould growth. The panel agrees it is reasonable for the insurer to conduct a further roof assessment to determine whether there is a contributing secondary factor to the mould growth. If there are secondary water ingress points that are not the result of the insured event, then it is fair and reasonable for the complainant to address these issues prior to the mould remediation taking place. Insurer liable to include attic and subfloor in mould remediation In summary, the panel is of the view that it is fair and reasonable for: > the insurer to conduct a further roof assessment to determine whether there are secondary water ingress points contributing to the mould growth > the complainant to complete any necessary roof repairs unrelated to the March 2022 event prior to the mould remediation > the insurer is to conduct further mould assessment after completion of any necessary repairs and include in any mould remediation, the attic and subfloor areas. 2.2 Is the insurer liable for damage to the retaining wall? No. The terms of the policy are clear. Damage to a retaining wall caused by storm is excluded Policy excludes damage to retaining wall caused by storm Under the insured event storm, the policy excludes loss or damage to: Retaining walls, sea walls, revetments, garden borders and free standing outdoor walls Retaining wall damaged by storm The parties do not dispute the retaining wall was damaged during the storm. The insurers engineer CRD reported: > foundation of the slab has collapsed > retaining wall was constructed of dry-stacked rock boulders and backfilled with clayey soil > the external of the wall foundation were observed to be covered by stainless steel hexagonal wiring > damage to the retaining wall is attributed to hydrostatic pressure behind the wall > water from the pool overflowed during the event, draining between the pool shell and concrete paving into the soil substrate > excessive water flowing into the substrate resulted in the failure of the retaining wall due to inadequate design and construction The panel notes that CRD has stated the wall was not designed correctly. No evidence has been submitted to support this position, nor has the insurer relied on this exclusion. The complainant has submitted a report from NLC dated 23 March 2023 that identified: > the temporary make-safe installed by CRD was not completed per its specifications in its own report Determination | Case number: 900277 Page 7 of 14 > further damage has occurred due to the installation of the current make-safe works > damage was less likely to worsen had the original specifications of CRD been completed in its make-safe. This report does not dispute that the cause of damage to the retaining wall in first instance was storm. The policy specifically excludes damage to retaining walls from storm. In the circumstances, the panel is satisfied that the insurer can rely on the terms of the policy to decline the claim for damage to the retaining wall. Further, the panel is satisfied that the insurer is not required to accept any further liability due to its make-safe installation. 2.3 Is the insurer liable for the damage to the pool surrounds? Yes. The insurer is liable for the damage to the concrete slab and pavers surrounding the pool as the proximate cause of the damage was the storm. The insurer says it is not liable for damage to the pool surrounds The insurer says damage to the pool area is the result of a landslip arising from the storm event. T he policy specifically excludes damage to retaining walls under the event ‘storm’ . Further, the policy specifically excludes damage from landslip under storm, except when the landslip occurred within 72 hours of the event and directly because of the storm event. The insurer says the damage to the pavers is not covered as cracking to sealed paths, roads and driveways are not covered unless they are washed away by the storm. Report from CRD identifies storm related damage to pool The insurer engineer CRD reported: > concrete slab is sinking due to lack of subsoil stability due to the collapse of the retaining wall > multiple uplifted pavers were observed to the swimming pool area and the overall condition of the pavers is average > water from the pool overflowed during the event, draining between the pool shell and concrete paving into the soil substrate > the water flow into the substrate has been occurring over an extended time in small amounts, as evidenced by the condition of gaps and cracks around the pool > the issue was exacerbated by the large volume of water from the event. Insurer liable for damage to pool surrounds The panel notes that the damage to the pavers is not described as cracking. The pavers are listed as lifting due to a lack of subsoil stability from the loss of the retaining wall. Damage has not occurred to the soil. Damage has occurred to the retaining wall, which has resulted in a breakdown of the soils compaction. The panel accepts that the damage to the retaining wall is not covered under storm. That does not overrule the fact that the damage arose from the storm. The proximate cause of the damage to the pool area was the storm (via damage from movement of the retaining wall), which is an insured event. The damage to the concrete slab and the pavers has occurred due to the failure of the retaining wall, which is accepted to have occurred because of the insured event storm. Determination | Case number: 900277 Page 8 of 14 The panel is satisfied that in the circumstances the insurer is liable for damage to the concrete slab and pavers. The cost to complete the repairs should be included in the SOW relied on to cash settle the claim. 2.4 Is the insurer entitled to cash settle the downstairs area? Yes. I t is fair for the insurer to cash set tle the repairs to the downstairs area . Given the differences in assessment between the Complainant and insurer reports, the panel determines that two independent reports be obtained by the insurer. The insurer is to pay the higher assessed quote plus an uplift of 20% to cover contingencies. No evidence insurer was negligent The complainant believes the insurer was negligent in its assessment of her 2020 storm claim and subsequently did not discover the seepage issue, leading to the long-term wood rot damage that has resulted in the downstairs repairs unwarrantable. The panel accepts there is evidence of long term wood rot that is not storm related. The panel has reviewed the information submitted by both parties regarding the 2020 claim, and notes: the complainant submitted information showing water penetration downstairs and an invoice for the rectification issued the insurer reviewed this information, accepted the invoice and images submitted by the complainant and cash settled. Insurers can accept information presented to them by its insured parties and settle its liability based solely on that information, without any contractual requirements to assess further. This is not unreasonable. The panel considers that it would not be fair to penalise the insurer for accepting the information presented by the complainant and settling its liability in line with the complainant’s requests. Insurer’s builder not prepared to warrant repairs to downstairs area The complainant says the insurer should complete the repairs, rather than cash settle its liability for the downstairs area. The complainant says the amount offered by the insurer does not reflect the actual costs required to rectify the damage from the storm event. The insurer says it is unable to warrant the repairs to the downstairs area for the following reasons: the seepage/drainage/waterproofing issue has not been rectified by the complainant there is non-compliant electrical wiring through the concrete slab in the downstairs area that requires rectification there is long term wood rot in the downstairs area which is a result of the seepage issue over an extended period, rather than from the one-off storm event preventing warrantable works the product disclosure statement (PDS) allows for the insurer to cash settle where their trades are unable to warrant the works as a means of meeting its liability. The complainant is currently in the process of rectifying the maintenance and water seepage issues and believes this should allow the insurer to complete repairs to the downstairs area. The work required by the complainant is extensive. Determination | Case number: 900277 Page 9 of 14 Fair in circumstances that insurer cash settles claim. The policy provides that that when settling a building claim the insurer will first engage a builder from the supplier network to prepare a SOW and quote for the repairs. It will then arrange for the SOW and quote to be assessed. The insurer will then either engage the builder to complete the repairs or if the insured chooses not to accept the offer, cash settle for the assessed amount. If a member of the supplier network is unable to complete the repairs, then the insurer is to ask to complainant to engage a builder to provide a SOW and quote. This will then be assessed, and the insurer will cash settle for the adjusted amount While the complainant wants the insurer to complete the repairs, the insurers builder RCC will not warrant the repairs. The complainant says her experience is that the insurer’s professionals do not act independently and act with bias when assessing the claim. The complainant would prefer the builder to be selected from a list provided by her. The complainant and the insurer have submitted up to date SOW for the downstairs repairs on 5 July 2023 and 16 June 2023 respectively. The complainant has provided SOW and quotes from AH for the downstairs repairs and the repairs to the pool surrounds and retaining wall. As determined the retaining wall damage is excluded under the terms of the policy. The complainant has also provided a report from consultant EBC following inspection of the property on 17 May 2023. EBC considered: > the widespread propagation of mould had resulted to irreparable damages within the property. > In its current state, the dwelling is uninhabitable due to the safety risks concerning the mould growth. > The skirting and flooring need to be removed and replaced to allow for the replacement process to be properly conducted. > All areas must be correctly cleaned of mould. The kitchen has multiple affected areas where cleaning would be impossible. Complete renovation is necessary for the area to be habitable. The insurer submitted an assessment by BC outlining its breakdown of the complainant’s scope from AH and its assessment of which costs are fair and reasonable. BC noted: > changes to the proposed repairs to the down stairs area were needed, > amendments required to the insurers quote from RCC > complainant’s SOW not fair and reasonable as many items quoted are excessive > swimming pool is a non-event > mould has spread upstairs. While the BC report outlines several observations, the submitted scope of work from RCC of $106,256.01 is a significant difference from the proposed scope from AH, at $495,469.64. The panel notes the scope of work submitted by RCC totalling $106,256.33 does not include: > scope for the required mould remediation downstairs > repair of the swimming pool surrounds Determination | Case number: 900277 Page 10 of 14 > contingency for the transfer of risk and responsibility and the loss of the lifetime guarantee. The scope from RCC is not actionable. RCC says the repairs cannot be conducted without rectification of the complainant’s maintenance items. The panel accepts there are maintenance issues that require repair prior to repair of the storm related damage. The complainant has commenced the maintenance and water seepage repairs. As the complainant has lost trust in the insurer’s builders and as the builder is not prepared to warrant repairs then in the interest of finality, the panel considers it fair for the insurer to cash settle the downstairs portion of the claimed damage. Cash settlement requires further assessment Given the large discrepancies between the two scopes of work, and the largely unsubstantiated statements in the BC report leading to the revised RCC scope of works, the panel considers further assessment is required. In the circumstances, the panel is satisfied that further investigations must be undertaken to enable a fair and reasonable cash settlement. If the complainant accepts this determination the panel determines that within 14 days of the complainant’s acceptance of this determination: > the insurer is to nominate two building consultants, not previously involved in the claim and the complainant can nominate two building consultants. > the complainant can select one of the insurers consultants and the insurer one of the complainants building consultants > the insurer is to then appoint the two selected consultants to prepare a SOW for the claim related repairs, including repairs to the pool surrounds. > the insurer is to provide the appointed consultants with a copy of this determination, the scope of works prepared by AH and RCC and quotes the parties have submitted to AFCA. The consultants are then to prepare actionable retail quotes based on current prices. The consultants are also to provide an estimate of the period in which the property will be uninhabitable during the claim related repairs. W ithin 14 days of receiving the building consultants’ scopes of work/quotes, the insurer is to provide a copy of them to the complainant and offer to pay the higher of the quoted amount plus a 20% contingency uplift, subject to application of the $1,125,500 building sum insured The panel considers this outcome fair and reasonable and provides the parties an opportunity to determine a fair cash settlement in line with the actual costs to repair the accepted damage. Should the parties be unable to agree on the final SOW or cash settlement then a further complaint may be lodged with AFCA. 2.5 Is the complainant entitled to further temporary accommodation (TA)? Yes. Due to the delays in mould remediation and assessment of damage it is fair for the insurer to cover the reasonable temporary accommodation costs until the home is habitable. Determination | Case number: 900277 Page 11 of 14 Further TA is required due to insurer’s errors Based on the available information, both the complainant and the insurer have contributed to the delays experienced during the claims process. The complainant says as the need for TA has only occurred due to the insurer ’s lack of action resulting in mould spreading from downstairs into the upstairs region of the property. The insurer, in turn, has outlined that the spread of the mould would have been far less significant if the complainant had allowed them to conduct mould remediation immediately, rather than contesting the scope of work for the mould remediation and withdrawing her consent for work to begin. The claim was submitted on 6 March 2022. The insurer was able to quickly attend and conduct the initial assessment by RPF on 17 March 2022. RPF submitted its report and recommendation which outlined a need for a mould make safe and an engineer’s report. This information was reviewed on 1 April 2022 and then communicated to the complainant. The complainant says she was unable to provide access to the property during April due to family commitments. The insurer accepted this and, organised to have an engineer attend on 13 May 2022. The complainant states she did not hear anything from the insurer during April regarding the mould make-safe. The complainant organised her own make-safe, which involved some surface cleaning and cleaning of her couches downstairs. The engineer, CRD, attended on 13 May 2022. The insurer did not receive the report from CRD until 16 June 2022, which outlined the now urgent need for a mould make-safe. The panel recognises that the complainant delayed access to the property during April 2022. However, it is unclear why the mould make-safe was not organised until late June. The insurer was aware of the need for the make-safe from 1 April 2022. Had the mould make-safe been conducted when the insurer was alerted, the mould may not have spread so significantly through the property. In June 2022, STM attended the property three times on 16, 20 and 30 June 2022. Despite instruction, STM failed to install dehumidifiers on 30 June 2022 as planned with the insurer. STM advised that moisture readings were taken, and all met dry standard, so dehumidifiers were not required. The panel notes this is in direct contradiction to the notes in the report from STM on 30 June 2022 which outlined that the flooring required removal due to mould infestation and the need for drying. Had the insurer correctly assessed its liability from the onset of the claim and addressed the mould remediation in a timely manner as advised by its trades, the property may have remained habitable. The claim was declined on 4 July 2022 based on the seepage exclusion. The panel acknowledges this was overturned on 23 August 2022 and TA, emergency funds and further assessments booked. Notwithstanding this, further delays followed that allowed mould spread throughout the property due to the insurers incorrect assessment of its liability. The additional information submitted by the complainant, has resulted in the insurer: > increasing the scope of its work for the downstairs repairs significantly, > recognising the original mould remediation did not remove the mould from the property, > acknowledging that the mould was present in areas untested by the insurers trades. Determination | Case number: 900277 Page 12 of 14 The panel accepts that from this point onwards the insurer has taken steps to address the issues raised by the complainant and has tried to work with the complainant to resolve the complaint. However, the delays and errors have led to a loss of faith by the complainant in the insurers ability to correctly complete the mould remediation and accurately cash settle its liability. The panel accepts some delays were caused by the complainant contesting the proposed scope of work for the mould remediation upstairs, withdrawing their consent to begin the upstairs mould remediation and challenging the insurers decision to cash settle the downstairs repairs and remediation rather than conducting the repairs itself. Given the extreme levels of stress, medical issues and miscommunication experienced by the complainant, the panel finds it understandable for the complainant to have experienced a loss of faith in the insurer’s ability to address her concerns. In the circumstances, the panel is of the view that it is fair that the insurer continues to pay the complainants TA costs (and any outstanding TA cost) until the house becomes habitable. The panel understands the complainant is currently staying in short term accommodation. The insurer should continue to pay for this accommodation until suitable longer-term accommodation can be arranged. It is fair for the insurer to assist the complainant in obtaining such accommodation. Subject to suitable longer-term accommodation being available, should the parties agree, the insurer can cash settle the TA based on the estimated time to complete repairs as assessed by the appointed building consultants. 2.6 Is the complainant entitled to compensation for non- financial loss? Yes. The insurers claims handling has caused an unusual degree of inconvenience and stress for the complainant. It is fair the complainant be paid compensation of $4,000 for non- financial loss. AFCA can award compensation for non-financial loss Under AFCA rule D3.3 AFCA can award up to $5,400 as compensation for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve a situation. Complainant has suffered an unusual degree of physical inconvenience As has been highlighted in this determination, after the claim was lodged in March 2022 the insurer declined the claim on 4 July 2022 based on the seepage exclusion. This was despite reports from STM. The claim decision was not overturned until 23 August 2022. There were then further delays that allowed mould spread throughout the property due to the insurers incorrect assessment of its liability. The panel recognises that some delays are related to by the complainant contesting the proposed scope of work for the mould remediation upstairs, withdrawing consent to begin the upstairs mould remediation and challenging the insurers decision to cash settle the downstairs repairs and remediation rather than conducting the repairs itself. The complainant’s conduct was not unreasonable. Determination | Case number: 900277 Page 13 of 14 The panel is of the view that the c omplainant has (des pite various personal hurdles) largely been driving this claim forward. While the insurer has taken steps to address the issues raised by the complainant and resolve the complaint, the delays and errors have led to the complainant los ing of faith in the in surers ability to correctly complete the mould remediation and accurately cash settle its liability. In the panels view the complainant has suffered an unusual degree of physical inconvenience and time take to resolve the situation. This has resulted in c onsiderable stress. In the circumstances the panel considers an award of $4,000 compensation for non - financial loss fair and reasonable. 2.7 Is the insurer liable for the electrical gate? The insurer is required to assess its repair of the electrical gate The insurer has outlined that a make-safe was conducted and the issue reported as resolved, however, the complainant is of the view the issue is still on-going. The insurer has outlined that based on the make-safe reports submitted by RCC, the damage is due to corrosion. The complainant has outlined that this view is incorrect, and that they are of the view that the make-safe completed by the insurer’s trades was in fact a repair, which they support with the signed repair completion certificate, and that the damage to the electrical system was due to storm. The panel has reviewed the information submitted by both parties. It is clear that: > t he insurer’s trades conducted a repair to the main gate of the property, > the damage to the gate is due to corrosion of the wires, > the issue affecting the gate is ongoing. No information has been submitted to support the claim that corrosion present within the gate wiring, was due to the one-off storm event. Should the complainant present information to support this, the insurer is required to consider and determine how that information impacts its liability per the terms and conditions of the policy. However, the insurer is obligated to assess the quality of the repairs conducted to the complaints main gate. If the repairs were below the expected standard, then the insurer is required to conduct the repair to the appropriate standard. 2.8 Why is the outcome fair? The outcome is fair as it considers the various submissions of the parties to achieve a fair outcome under the terms of the policy and the circumstances of the claim. It is fair that the insurer be liable for the mould remediation including remediation of the attic and subfloor consistent with the reports provided. It is also fair that the insurer continues to meet the temporary accommodation costs until the property is habitable. It is otherwise fair, and consistent with the terms of the policy, given the maintenance issue with the property and breakdown in relationship between the parties that the cost of repairs be cash settled. Determination | Case number: 900277 Page 14 of 14 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: > the legal principles > applicable industry codes or guidance > good industry practice > previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised numerous of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: > an ombudsman > a member with significant experience in consumer and small business advocacy > a member with extensive insurance experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: > available documents > the recollections of the parties > all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.