Home / Allianz Australia / Determination 899592

Determination 899592

Insurer's handling and partial decline of a storm damage claim, including loss of the business and roof damage

FirmAllianz Australia
Decided2023-07-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

A café owner's storm damage claim was partly accepted for stock and contents, but the insurer declined the roof and loss of business. AFCA required the insurer to settle the stock and contents loss with interest and pay $2,000 for non-financial loss, otherwise upholding the decline.

Stock and contents damage is covered under the policy, but the roof, business loss and consequential losses are outside cover, and the insurer's failure to make a partial settlement warranted non-financial loss compensation.

Issues

Subjects and remedies

broker or intermediarybusiness interruptionfinancial hardshiphome or building damagesmall businesspay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 899592 Financial firm Allianz Australia Insurance Limited Determination | Case number: 899592 Page 2 of 16 Case number: 899592 6 June 2023 1 Determination overview 1.1 Complaint The complainant held a Business Package insurance policy with the financial firm (insurer) and lodged a claim for damage caused by a storm on or around 25 March 2021. The insurer accepted liability for the damaged stock and contents. It declined liability for the roof repair as the policy did not cover damage to the property. The roof damage was the responsibility of the landlord. The landlord failed to repair the roof. The complainant says subsequent weather events increased the loss and the business eventually closed resulting in the total loss of the business asset. The insurer says the loss of the business is not covered by the policy. The insurer is unable to settle the claimable loss due to insufficient information and opportunity to assess the damage as it escalated. The complainant says the claim was mishandled and she may not have lost her business or taken on further debt had she received more support from the insurer. The complainant seeks financial and non-financial loss compensation to the maximum AFCA can award. 1.2 Issues and key findings Is the insurer liable for the loss of stock and contents? Yes. The insurer is liable for the loss of stock and contents and should settle the claim in line with section 2.1 of this determination. Is the insurer liable for loss of the business asset? No. The insurer is not liable for the loss of the business or roof damage under the terms of the policy. Is the complainant entitled to non-financial loss compensation? Yes. The insurer must pay the complainant non-financial loss compensation of $2,000 Why is the outcome fair? This is a fair outcome as the insurer is liable for losses covered under the insurance policy occurring during the period of insurance. It is fair the insurer covers this in line with the policy terms and pays the compensation for non-financial loss. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the in surer must:  settle the claim and complaint in line with section 2.1 of this determination  pay the complainant $2,000 compensation for non-financial loss The insurer is otherwise entitled to rely on the terms and conditions of the policy to deny the balanc e of the complainant’s claim. Determination | Case number: 899592 Page 3 of 16 2 Reasons for determination 2.1 Is the insurer liable for the loss of stock and contents? Yes. The insurer is liable for the loss of stock and contents and should settle the claim in line with this determination. No dispute stock and contents damage in storm It is accepted insurance law that an insured has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of cover under the policy. The com plainant’s policy was arranged through a broker AJG and provided accidental damage cover for material damage to stock and contents, theft, internal and external glass and public liability. The policy did not include business interruption or general property damage to the premises. Relevant sections of the policy wording have been included in section 3.2 of this determination. The Complainant’s broker notified the insurer on 23 April 2021 that the complainant’s property had suffered storm damage on or around 25 March 2022 as follows: Roof leaks caused water damage to our tables and chairs, caused a power outage which saw us loose $12, 000 worth of stock and approx the same amount in machinery.Flooding caused damage to our flooring. We also lose revenue due to flooding and roofleaks. On 16 June 2021 the insurer’s building consultant (QT) assessed the property and supplied a report with the assessment findings. QT found there was substantial corrosion of the main awning roof which is located primarily over the al fresco dining area. There were also several areas of concern over the main kitchen which water damaged. QT could not determine any precise point of entry created by the storm. There were several other issues noted such as the roof flashing, and silicone sealant around various electrical conduits. The insurer accepted liability for the damaged stock and contents but refused liability for the repair of the roof as it was not covered under the terms of the policy. The panel is satisfied the insurer was entitled to decline cover for the damage to the roof of the property and has correctly directed the complainant to address this with the landlord. The panel is also satisfied the insurer had no option to make safe the roof, or to repair it and seek recovery from the landlord. Landlord responsible for roof repairs The complainant did not own the roof, and the lease agreement did not assign liability for its repair and maintenance to the complainant. The insurance policy did not cover accidental damage to general property The lease required the landlord to maintain the property in a good state of condition and serviceable repair of the roof, the ceiling, external walls and structural defects. The landlord was responsible for the roof repairs. Determination | Case number: 899592 Page 4 of 16 The building lease agreement was from 1 February 2018 until 31 January 22 with extension options. The complainant was locked out of the premises on 2 February 2022 by the landlord and the business closed. NCAT proceeding were commenced by the complainant on 9 February 2022 against the landlord although the outcome of those proceedings has not been disclosed. Delay in settlement due to failure to repair roof On 6 August 2021 the insurers loss adjuster AN notified the complainant of QT’s findings and advised: “ the water is clearly entering the internal building due to the poor condition of the roof (See attached Photos) which we understand belongs to your Landlord. This issue clearly needs to be resolved by the Landlord before you consider repairing and/or replacing the resultant damage to your property. We suggest that you commence discussions with your Landlord in order to resolve this URGENT matter”. On 7 September 2021 the complainant notified MB that she would enlist a lawyer to start discussions with the landlord. No details of discussions with the landlord have been exchanged. On 27 January 2022 the complainants broker AJG confirmed with the complainant that as the roof is a part of the landlord’s property, it is their responsibility to repair the roof. The insurer would not get involved as the property is under the landlord’s ownership. AJG advised the insurer had agreed to settle the claim for: - Repair the plasterboard ceiling in preparation for painting. - Prepare and paint the plasterboard ceiling and cornice. (3.6m x 1.9m) - Supply and install wall tiles similar in colour, size and finish to existing. (1.0m²) - Main Electrical Switchboard Kitchen. The Insured advised that they will attend to this repair. - Refrigerator Pizza bar Refrigerator water damaged and required replacement. Purchased a second hand refrigerator for $1,000.00 cash. - Milkshake Maker X 1 Cafe Kiosk One (1) milkshake maker water damaged. - Blender X 2 Cafe Kiosk Two (2) blenders water damaged. - Hand Dryers X 2 Men's & Women's WC Two (2) hand dryers damaged by water ingress - Insured's Electrician to replace. - Main Exhaust Kitchen Insured advised not fully operational - Insured's Electrician to repair. - Security Alarm and Cameras various Insured's Electrician to repair. - Dining Tables X 16 Outside Insured claimed the tables have bowed following the storm event. AJG advised it could request the insurer to cash settle the loss, although without the roof being repaired, it is highly likely damage will happen again. Delay in repairing roof most likely led to further loss It appears from the information exchanged that the landlord did not complete any repairs to the roof. The complainant had organised work to ensure the business could continue to operate with various repairers which became ineffective as time went on. The initial inspection report by the complainant’s electrician (VG) from 27 October 2021 largely concurs about the extent of damaged items as QT’s earlier report. VG’s report from the 15 December 2021 assessment showed the damaged items had increased substantially, Determination | Case number: 899592 Page 5 of 16 and VG’s final report advises the ongoing nature of the loss, and temporary measures implemented. The panel is satisfied that it is likely the complainant suffered further losses to stock and contents due to the landlord ’s failure to repair the roof. T he panel is satisfied the insurer made the correct decision to accept any further evidence of ongoing damage for consideration while the complainant negotiated the roof repair with the landlord. Policy says landlord acts or omissions do not breach complainant obligations The policy includes a general term where if the landlord’s action or omission would cause the complainant to breach a condition of the policy, it shall not affect the complainant’s entitlement to cover. The panel is satisfied this extends to the claim procedure where the complainant’s ability to meet the requirements has been interfered with by the landlord’s acts or omissions. Accordingly, the complainant is not liable for the landlord’s failure to repair the roof. Further, the landlord and its solicitor choosing to avoid further engagement with the insurer is also not something which can affect the complainant’s entitlement to cover. Insurer must settle the accepted loss and any repair invoices for water damage The insurer offered to cover the costs incurred including damage to:  the kitchen plasterboard ceiling and cornice (3.6m x 1.9m)  wall tiles similar in colour, size and finish to existing in the kitchen (1.0m²)  main electrical switchboard  pizza bar refrigerator  milkshake makers  two blenders  two hand dryers  main kitchen exhaust  security alarm and cameras  16 dining tables. Further, the insurer is to accept any of the additional damaged items outlined in VG’s letter of 9 February 2023 and settle the cost of their replacement as well upon receiving proof the complainant owned these items separate to the lease agreement. Original purchase receipts, re-prints from the original suppliers, and bank records may be used to substantiate this. The insurer is to settle these losses in line with the quotes provided by the complainant, and source and settle quotes for any items which the complainant hasn’t provided a quote for. The complainant must assist the insurer with any details it needs to locate a suitable replacement item. The insurer must also cover the cost of the stock the complainant ordered to replace lost stock due to the electrical failures and accept and pay the complainant’s repair invoices which were paid for water damage repair work. The insurer is to make the settlement payments within 14 days of this determination where it has the information necessary to settle a portion of the claim, or within 14 days of receiving the necessary information otherwise. Further, the insurer must pay the complainant interest on the settlement value in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) calculated from 26 August 2022 (being the date of its final decision letter) until the settlement is paid. Determination | Case number: 899592 Page 6 of 16 Insurer liable to meet repair costs of leased items Some damaged items reverted to the landlord’s care and control when the lease was terminated. The complainant says she had purchased all items used in the business, but these were retained by the landlord when she was locked out of the building for non-payment of rent. The panel notes the lease agreement included schedules of items which were used in the café. The information supplied has not shown what items the complainant purchased separate to those leased from the landlord. If any of the damaged items were leased, then the insurer’s liability for those damaged leased items is limited to the complainant’s cos ts paid to repair/ replace those items subject to provision of relevant invoices. 2.2 Is the insurer liable for loss of the business asset? No. The insurer is not liable for the loss of the business or roof damage under the terms of the policy. Remaining loss is not claimable under the insurance policy The panel has considered the complainant’s argument the insurer should settle her for the total loss of her business asset, business loans, legal costs and items remaining in the business premises following the termination of the tenancy. These are not items which fall within any cover the policy offers. The panel empathises with the complainant as it is clear the loss of the business has greatly impacted her. However, the panel cannot agree this would be a fair outcome. The timeline of events indicates information was requested relevant to the decision and asked for the complainant to seek her entitlement to have the landlord repair the roof leaks. The ongoing loss suffered by the complainant is not something the insurer had the power to help her avoid, as replacing equipment while the roof was still leaking would not prevent further equipment failure. It would only delay it at best. Further, there is no evidence an electrician acting for the insurer could have achieved a better temporary repair than the one the complainant organised with her preferred tradesman. The widespread electrical problems in the building show there is a substantial problem which likely required a substantial repair. The panel sees no error in the insurer saying the roof repair had to come first as not doing this would very likely expose the new repair work to the same problem which led to the damage initially. Further, the complainant’s situati on has also been impacted by the effects of the COVID-19 pandemic affecting her trading as noted in the exchanged correspondence. On balance, the panel is satisfied the complainant’s business loss stems from the cumulative effect of the pandemic, a severe weather event, and a landlord ’s response to the roof leak . These have combined to create exceedingly difficult conditions for the business. None of these things were within the insurer’s control. Determination | Case number: 899592 Page 7 of 16 2.3 Is the complainant due non-financial loss compensation? An award of non-financial loss is warranted Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of physical inconvenience, time taken to resolve the matter, or unreasonable interference with their peace of mind because the insurer mishandled the claim. We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim. Complainant entitled to compensation for non-financial loss. The panel is satisfied an award of non-financial loss compensation is warranted in these circumstances. However, it is not satisfied the award should be substantial. The available evidence shows most of the delay stems from the disputed roof repair. While it is accepted the insurer could have organised its own assessment of the damaged electrical items, it was not able to effectively settle the damage prior to the roof repair. Once this changed, the complainant’s loss did not extend to the items no longer in her possession, meaning the insurer can only settle this if provided with the evidence noted above. The panel is satisfied the insurer had information necessary to make a partial settlement of the claim and had not done so. The insurer was aware of the complainant’s difficult financial circumstances and has not acted to minimise this as best it can. Accordingly, the panel is satisfied an award of $2,000 non-financial loss is warranted. The insurer is to pay this to the complainant within 14 days of her accepting this determination. 2.4 Why is the outcome fair? This is a fair outcome as the insurer is liable to the complainant for losses it has agreed to cover under the insurance policy during the period of insurance. Where the complainant has a loss which is claimable, it is fair the insurer covers this in line with the policy terms. Determination | Case number: 899592 Page 8 of 16 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Policy information summary General definitions Contents means all contents at the Situation… When you are the tenant at the Situation, Contents shall also mean: Determination | Case number: 899592 Page 9 of 16 a. property owner’s fixtures and fittings, window blinds, floor coverings and Glass for which You are liable under the terms of a lease or similar agreement; and b. property comprising alterations and/or additions to the Situation by the landlord for Your use in the Business where the cost of reinstatement is Your responsibility in the event of loss or Damage. … Property Insured means all tangible property both real and personal shown as insured on the Schedule in respect of each Section and not otherwise excluded which belongs to You, or for which You are legally responsible, or have assumed responsibility to insure prior to the occurrence of any Damage. General exclusions 2. Consequential Loss Except as specifically provided otherwise, the Policy does not cover: i. Consequential Loss of any kind … Claims procedure and conditions 1. Claims procedure a. As soon as you become aware of anything happening which may result in a claim under the Policy You must, at Your own expense (unless the expense is covered under “2. Claims preparation expenses below”): … ii. advise us as soon as possible, telling Us how the Damage, Injury or Sickness (as defined in Personal Accident and Sickness section), or liability occurred; iii. take all reasonable action to recover lost or stolen property and minimise the claim; iv. as far as possible preserve any products, appliances, plant or other items which might prove necessary or useful as evidence until We have had an opportunity for inspection; … viii. at all times give Us all the information and assistance We reasonably require. … General terms and condition 1. Actions of parties other than You The acts of omissions of: … b. the owner of, or another tenant in, the Building; which breaches any provision of the policy will not affect Your entitlement to cover provided that:  the act or omission was committed without Your prior knowledge or complicity, and  You notify Us of the happening or existence of the act or omission as soon as You become aware if it, and Determination | Case number: 899592 Page 10 of 16  You pay any reasonable extra Premium which We require. … Material Damage Section Except as otherwise specified, We will pay up to the applicable Sum Insured or sub limit … for Property Insured that is accidentally Damaged at the Situation during the Period of Insurance. … 3.3 Expert information summary Record Key points Insurer’s build ing consultant ( QT ) Report 7 July 2021  main awning roof leaking around the al fresco area of the property  no storm created openings located  leak in the main awning is due to substantial rust and rust holes  roof is beyond serviceable life and responsibility for its repair falls to the landlord  insured advised timber deck refinished in February 2020 but damaged by the recent storm in March 2021  close inspection of the timber deck has not revealed cupping or bowing of the boards or any resultant damage to the structure  scratches and scuff marks were observed consistent with wear and tear rather than storm damage  list of damaged items noted beyond the building. Complainant’s electrician ( VG ) Report 9 February 2023  inspections occurred on 27 October 2021 and 15 December 2021  list of electrical items damaged by water noted at each inspection and has increased  items noted to have visual corrosion, failed insulation and resistance tests  temporary measures undertaken only due to building repairs being incomplet e. 3.4 Timeline of events summary Date Action 25 March 2021 Approximate d at e of the storm , complainant organises water damage repair to gas stove , three door fridge, and main bar fridge. 27 March 2021 Complainant contacted her insurance broker about her claim options. 28 March 2021 Complainant located damage to the lounge backing on the wall and pizza over stopped working. Determination | Case number: 899592 Page 11 of 16 29 March 2021 Complainant found switchboard tripping multiple times during the day. 31 March 2021 Complainant emailed her insurance broker to follow up policy cover. 1 April 2021 Complainant noticed crackling noise with the café speakers. 2 April 2021 Complainant discovered oven not fully working. 5 April 2021 Complainant discovered salad bar power also tripping. 17 April 2021 Complainant noticed fridges running high temps. Organised repairers to come out. 19 April 2021 Complainant discovered one of the small appliances entirely not working. Contacted the insurance broke r and lodged a claim as costs were escalating. 21 April 2021 Complainant advised by staff the power still tripping. 23 April 2021 Complainant organises trades to quote ceiling, flooring, and followed up electrician. Complainant ’s broker contacts the insurer to lodge the claim. 24 April 2021 Complainant advised by staff the dishwasher now tripping the circuit. 26 April 2021 Complainant advised by staff power was off overnight. 27 April 2021 Complainant advised broker the costs were escalating as more losses were occurring. 28 April 2021 Insurer assigns AN to handle the claim. 5 May 2021 Complainant rec eives a text message advising inspection occurring at 10:30am on 6 May. Complainant call to AN. 6 May 2021 Complainant text message to insurer’s assessor to reschedule the assessment as she is ill. Assessor requests a call to 10 May to book a new time. 17 May 2021 Insurer’s assessor texts complainant to confirm when they can inspect the property. 18 May 2021 Complainant call to AN as Comp only just back at work following illness. 19 May 2021 Insurer’s assessor texts complainant to organise a call on 24 May. 25 May 2021 Complainant missed a call from the ins urer’s assessor. Called AN back and arranged appointment for 28 May 2021 . Staff advised complainant pizza fridge and range hood now tripping the power circuit. Determination | Case number: 899592 Page 12 of 16 26 May 2021 Complainant requests her electrician to come out and fix range hood power point. 28 May 2021 Insurer’s first roofer (DM) and AN attend the property to inspect the damage. Advise a builder’s inspection is needed. 30 May 2021 AN supplies first report to the insurer . 1 June 2021 Complainant advised by staff TV has stopped working. Contacted electrician to replace TV and install hand dryers. 9 June 2021 Complainant’s insurance broker follows up the assessment with both parties. 11 June 2021 QT contacts the complainant to organis e an inspection time. 12 June 2021 Complainant’s insurance broker advises complainant about the recent updat e from the insurer. 13 June 2021 Complainant advised by staff the milkshake maker and phone not working. 14 June 2021 Complainant advised by staff of another power failure. Oven now turning on and off, and salad bar running high temp. 15 June 2021 Complainant contacts electrician about installing replacement TV she has purchased. 16 June 2021 QT assesses the damage. 18 June 2021 Complainant looking in to work arounds for wobbly tables. 22 June 2021 Complainant contacts electrician about café speakers no longer working. 26 June 2021 VG supplied and installed two hand dryers and a fan. 30 June 2021 Complainant advised by staff the bar fridge not working, and milk spoiled. POS and iPad now also having problems. 2 July 2021 Complainant organised repair of main bar fridge condenser motor diagnosed as fused causing trip at the switchboard. 7 July 2021 QT supplied its report explaining the assessed damage and their view on the cause of it. 9 July 2021 Complainant advised by staff a fridge is not working. 10 July 2021 Complainant advised by staff the ice machine is not making ice. 12 July 2021 Complainant followed up broker to get and update due to increasing costs. Determination | Case number: 899592 Page 13 of 16 20 July 2021 Complainant’s broker advises following up wit h insurer and requesting urgency. 21 July 2021 AN supplied review of the policy versus the QT report. 30 July 2021 Complainant advised by staff the kitchen fridge is off. 6 August 2021 Complainant rec eived an email from AN advising to cont act landlord about the poor roof condition. Advised open air damage will not be covered and requested quot es and electrician report for the kitchen damage. 7 August 2021 Complainant advised by staff the coffee machine and iPad not working. 11 August 2021 Complainant follows up with the broker for a copy of the QT report to assist with contacting the landlord about the roof rep airs. 16 August 2021 Complainant follows up the broker again due to the impact the ongoing loss if having on her. 20 August 2021 Complainant advised by staff the freezer had stopped working. 30 August 2021 AN sends a further follow up to the complainant regarding the roof leaks. 1 September 2021 Complainant emails AN confirming she will get her lawyer to start a discussion once report received. Will also get the electrician report. Confirms will be disputi ng denial of outdoor furniture. 7 September 2021 Complainant contacted electrician again due to ongoing power failures. AN emails her confirming he has written to the insurer to get them to supply a copy of the QT report and to confirm the insurer’s position on the open air contents. 10 September 2021 Complainant contacted electrician to request a report. Initially he is unwell. 12 September 2021 Complainant advised by staff the dough mixer no longer working. 14 September 2021 AN email and QT repo rt send to complainant confirming the damage accepted and rejected. Awaiting damage quotes and roof repair so the claim can be assessed. 20 September 2021 Complainant supplies AN’s response to her solicitor. Landlord’s solicitor is contacted the same day. 1 October 2021 Complainant follows up with electrician again about getting TV installed and speakers fixed. 7 October 2021 Complainant organised repair of faulty CCTV. Determination | Case number: 899592 Page 14 of 16 10 October 2021 AN contacts the complainant to see if she is getting quotes for internal damage. 11 October 2021 Complainant organised repair of sound system and power supply to outdoor televisions. 14 October 2021 Complainant advised by staff another fridge not working. 27 October 2021 VG inspection noted hand dryers, blenders, milk shake makers, and kitchen exhaust fan water damaged . Complainant emails AN advising electrician will provide an updated report and asked if insurer is reconsidering the disputed furniture. 30 October 2021 Complainant advised by staff main bar fridge heating up, resulting in stock loss. Downlights not wor king. 6 November 2021 Complainant advised by staff the dishwasher blew up and damaged power points. Bar fridge running high temperature again. 10 November 2021 VG replaces power point and dishwasher plug. 12 November 2021 Complainant advised by staff of issues with the blinds. AN emails complainant looking for an update on the roof repair. Reiterates the outdoor furniture denial. Complainant responds still waiting on electrician and landlord. 15 November 2021 Blind techni cian repaired blinds but suggests they need to be replaced. 19 November 2021 AN called c om plainant, leading complainant to call AN back . 11 - minute discussion about the constant repairs and the repairs becoming ineffective. Still waiting on report from the electrician. Raised issue of outdoor cover denial. AN agreed best course of action was to have the electrician come out again and he woul d speak to the insurer once it was done. Complainant called electrician to get report. 22 November 2021 Complainant advised by staff fridge has stopped working again. Requested electrician assess urgently. 24 November 2021 VG inspection of bar fridges results in repair of circuit board and power point. Complainant advis es smaller dishwasher also not working properly. 2 December 2021 Complainant advised by staff blender stopped working again. 15 December 2021 VG inspection shows damage now extends to 25 additional electrical appliances . 16 December 2021 Complainant missed a call from AN, leading c omplainant to call AN back . 8 - minute conversation. AN requested information about whet her the decking is part of the building or party of the Determination | Case number: 899592 Page 15 of 16 complainant’s fit out. Complainant confirmed it was and this part of the settlement has been unreasonably delayed. Advised of the quotes and t he electrician findings. AN requested a letter confirming the findings. Landlord not responding to the roof repair requests. AN requested proof of ownership of the fit out and claimed equipment. 18 December 2021 Complainant advised blender stopped workin g again. 20 December 2021 Complaint advised by staff two fridges not working again. Repairer organised for 22 December. 2 2 December 2021 Fridge repairer unavailable. 26 December 2021 Complainant followed up repairer as main bar fridge and salad bar not working after inspection. Repairer confirms he will do a temporary fix, but fridges must be replaced. 29 December 2021 Complainant supplied lease agreement with the equipment schedule as pr oof of liability for it in the items. 30 December 2021 Complainant organised freezer repair due to burnt out condenser and re - gas. 7 January 2021 Complainant advised by staff a shelf had fallen off the wall during the night. 17 January 2022 Complainant organised freezer repair due to blown compressor. 19 January 2022 Insurer emailed complainant advising it had received information relevant to progressing the claim. Complainant emailed AN requesting acknowledgement of the 29 December 2021 email. 26 January 2022 Complainant advised by staff the bar freezer temp is high and needs a repairer. AN and complainant calling each other to discuss finalising the claim but keep missing each other. 27 January 2022 Complainant call to AN. 10 - minute conversation. AN advises insurer has accepted the outdoor tables. Complainant still fol lowing up electrician’s letter, quotes for ceiling, tiles, and furt her damaged equipment. Has supplied quotes for flooring, fan, exhaust, and some replacement equipment. Fridge repaire r advis es replacement required the same day. Matter now wit h NC AT over landlord refusing to repair the roof. 29 January 2022 Complainant advised by staff the POS system has failed again. 1 February 2022 Complainant advised by staff the freezer repair quote is $2,600, but not worth it as it must be replaced. 3 F ebruary 2022 Complainant call to AN. Explained the electrician findings and the extent of the damage. AN and complainant discussed a settlement offer and complainant explained AN’s view on the likely offer is far Determination | Case number: 899592 Page 16 of 16 too low to resolve the claim. Follow up sent to electrician. Staff advis ed grill not working. 4 February 2022 Complainant advised by staff of problems with the sound system. 7 February 2022 Complainant followed up wit h electrician and freezer repairer. 8 February 2022 AN text messaged their contact details to Comp. 9 February 2022 C omplainant call to AN advising the landlord had locked her out of the premises. 11 February 2022 Broker emailed complainant advising it had followed up the settlement offer with the insurer. 25 February 2022 VG confirms all equipment damaged by water and irreparable. 23 May 2022 Complainant supplied electricians letter to the broker. 25 May 2022 Broker emailed complainant confirming they had passed along the electrician report. 21 June 2022 Complainant emailed follow ups to AN and the broker. AN requested the documents are re - s ent to him and he will come back with an offer. 5 July 2022 Complainant sent follow up to AN. AN stated more time needed to assess. Needs access to the damaged items. Complainant explained the circumstances. Explained no longer has the contents as the business is closed. AN requested the landlord’s contact details to organise an inspection. Complainant says AN should have inspected when the business was still open. 14 July 2022 Complainant emailed AN requesting if they rec eived her email of 5 July 2022. 17 July 2022 AN confirmed to complainant email rec eived, and insurer has since written to complainant’s broker advising assessment requirement must be met. 18 July 2022 Complainant emailed AN advising unable to meet the requirements and explaining the toll the claim process is taking on her. 25 July 2022 Complaint raised wit h AFCA.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.