Home / QBE / Determination 899270

Determination 899270

Insurer's liability for additional damage from defective repairs after 2015 cyclone claim, and settlement amount

FirmQBE
Decided2023-05-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$11,848
Non-financial loss$1,500
Amount claimed$136,881
SourceAFCA PDF

Summary

The complainant claimed for roof and water damage he attributed to defective repairs after Cyclone Marcia in 2015. AFCA found the insurer partly liable, ordered cash payments, tile replacement, assessment of other damage, a new claim for 2020 storm damage and $1,500 for non-financial loss.

Repairs authorised by the insurer were incomplete and defective so it must cover resulting damage, but the box gutter was private work and some damage may relate to the 2020 storm.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 899270 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 899270 Page 1 of 10 Case number: 899270 18 May 2023 1 Determination overview 1.1 Complaint In 2015 the complainant lodged a claim on his home and contents policy held with the financial firm (insurer) after the property was damaged by Cyclone Marcia. The claim was partially cash settled although most of the repairs were authorised by the insurer. In 2016, the complainant noted further damage relating to the event and outstanding repairs. The insurer accepted the additional damage and authorised repairs to the patio. The complainant privately arranged for the insurer ’ s builder to replace a box gutter. On 16 January 2020, following a severe storm the property sustained further water damage. The complainant believes the damage was caused by incomplete and defective workmanship relating to the 2015 event. The insurer has offered a cash settlement of $5,400 for the barge capping and damage to the rumpus room and patio. The complainant says the insurer should be liable for the further repairs including roof replacement and seeks $136,880.81. 1.2 Issues and key findings Is the insurer liable for additional damage from the 2015 claim? Yes. The repairs following the 2015 claim were incomplete and defective and the complainant’s property sustained further damage. The insurer must:  replace the 30 broken and chipped roof tiles identified by ARF  pay $6,448.33 for the damage to the lounge room, hallway and ensuite  arrange quotes to repair the damage to the master bedroom, bedroom three and the colorbond sheeting. The insurer can then cash settle the repair cost based on the quotations plus a 10% contingency. Is the settlement for the barge capping, patio and rumpus room fair? Yes. The offer to pay $5,400 for the ceiling and painting damage to the rumpus room, patio plus the barge capping is fair in the circumstances. Is the insurer liable for damage caused in the January 2020 storm? Not all the damage was caused by the 2015 cyclone or faulty workmanship. It is fair that the insurer opens a new claim to assess whether the additional damage was due to the January 2020 storm. Is the complainant entitled to compensation for non-financial loss? Yes. The delay in addressing the workmanship issues has caused an unusual degree of stress and inconvenience to the complainant. Compensation of $1,500 is fair. Determination | Case number: 899270 Page 2 of 10 Why is the outcome fair? The outcome is fair as there is evidence of incomplete and faulty repairs causing additional damage to the complainant’s property . Other damage not related to the 2015 event may be related to the January 2020 storm and it is fair the insurer can assess this damage under a new claim. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the insurer must pay the complainant:  $6,448.33 for the internal water damage to the lounge room, hallway and ensuite  $5,400 to repair the barge capping and the ceiling and painting of the rumpus and patio  $1,500 in compensation for non-financial loss The insurer is to arrange with the complainant:  a suitable time for a roofer to replace the 30 chipped and cracked roof tiles  to assess the cost to repair/replace the colorbond sheeting, repair the water damage to the master bedroom and bedroom three. The insurer may then cash settle the claim for the damage based on the quote obtained plus a 10% contingency fee.  to open a new claim to assess whether there was additional damage arising from the January 2020 storm as set out in section 2.3 of this determination. Determination | Case number: 899270 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer liable for additional damage from the 2015 claim? Yes. On balance, the repairs following the 2015 claim were incomplete and defective and the complainant’s property sustained some further damage. The insurer must:  replace the 30 broken and chipped roof tiles identified by ARF  pay $6,448.33 for the damage to the lounge room, hallway and ensuite  pay the cost to rectify the colorbond sheeting. Circumstances of claim The complainant holds a Home Insurance policy with the financial firm that provides cover for a series of listed events including storm. Storm is defined to include a cyclone. On 23 February 2015 the complainant lodged a claim for storm damage to the property following ‘Cyclone Marcia’, which occurred 20 February 2015. The insurer assessed the claim and says that over a period from 23 February 2015 to 6 July 2016 it worked with the complainant to determine what rectification was required to the property. Some of the repairs were completed by the insure r’ s builder, (M). Others were cash settled due to pre-existing damage which meant the insurer could not warrant repairs. In November 2016, the complainant sought cover for a box gutter. The insurer denied the claim for the box gutter but agreed to repair damage identified after removal of a prop installed by the complainant revealed further cyclone related damage. The information exchanged indicates the box gutter had not been damaged by the cyclone. M had recommended it be replaced due to a defective design. The replacement was being managed by private agreement between the complainant and M. M had not completed the agreed works. Following a severe storm on 16 January 2020, the complainant notified the insurer after identifying further water damage due to water leaking from the gutters and through the roof. The complainant says the damage was caused by the incomplete and defective repairs following the 2015 Cyclone. There is no dispute that the property has been damaged. The issue is whether the damage has been caused by an insured event, namely the cyclone in 2015 or the severe storm in January 2020 or whether it is excluded under the terms of the policy. Damage to roof tiles most likely due to repairs following Cyclone in 2015 The insurer had the damage assessed by (AB) on 17 January 2020. AB noted the claim followed a heavy downpour with water seeping onto the flooring and through the roof into the ceiling. The water damage was consistent with multiple water ingress events. Following inspection of the roof above the damaged area, AB attributed the water damage to poor workmanship in the previous roof repairs namely:  framing upgrades should have been addressed  barge flashing not water tight  external/internal fibre cement sheeting not painted  installed box gutter has water ponding Determination | Case number: 899270 Page 4 of 10  installation of roof sheeting is poor  internal damage to the ceiling in rumpus room and patio and damage to installed cork flooring. The insurer also obtained a report on 17 September 2020 from (MBC), a building company. The initial report concluded:  the tiled roof to the main dwelling had no cyclone damage but had pre-existing cracked tiles which had sealant applied over the cracks  the box gutter had been incorrectly installed  sarking had been damaged allowing rainwater into the ceiling. As the ceiling was removed in 2015 by M the damaged sarking should have been repaired  the colorbond roof over the rumpus room and patio has several defects starting with the box gutter. There are no sumps or overflows installed. The box gutter has been overflowing onto the fibre cement sheeting in the rumpus room and the soffits removed from the patio.  all associated work to the colorbond sheeting, box gutter and soffits related to the private work agreed by the complainant with M and not cyclone damage. The complainant provided a roof replacement report from (CBS), a building services company following an inspection of the property on 21 November 2022. The report identifies the date of the event as 19 April 2020 although I accept this is an innocent error. CBS identified water stains and damage in various rooms caused by the roof tiles and damaged sarking. CBS considered the damage was caused by a storm or hail with 60% of the roof sheets or tiles damaged. The complainant also provided a roof report from (ARM), a roof maintenance and restoration company. ARM considered there was hail damage and old impact damage and reported:  approximately 30 broken roof tiles  roof tiles throughout roof have some chips and hail marks to the point where it has removed the top coating  sarking was not repaired when tiles replaced  no damage to solar panels  box gutter needs to be inspected due to leaks. On 23 December 2022 MBC provided a supplementary report based on a desktop assessment following receipt of the reports from CRD and ARM. The report concludes:  MBC agreed there were approximately 30 broken roof tiles and not 40% as stated by CRD. (I note CRD says 60% of roof sheets/tiles damaged)  damage to roof tiles was due to heavy foot traffic and not impact during the cyclone in 2015  most of the cracks are along the bottom edge of the tiles which is consistent with heavy foot traffic  sealant on cracked tiles applied several years ago and looks to be more than 5 years ago and before the cyclone  the weathering of the broken tiles is consistent with the rest of the roof  agrees sarking has multiple rips and tears but says this is due to long terms deterioration. The complainant says the insurer’s trades may have had difficulty in sourcing the replacement tiles, noting the tax invoice for the work states the tile is rare, and the trades sealed some tiles as an alternative. MBC has not commented on this. The MBC says the sealant predates the cyclone event in 2015. I accept MBC may be able to determine whether sealant has been recently applied or has some age. I am not satisfied Determination | Case number: 899270 Page 5 of 10 however that it can conclusively determine the specific age of the sealant. The initial MBC report is dated 2020 and the cyclone occurred in 2015, the reporting does not exclude the possibility the cracks were caused and sealed during the work carried out to the roof following the 2015 claim. Fair for the insurer to replace the damaged tiles The insurer says it has no images of the roof from the 2015 repairs or photographs confirming the condition of the roof. There is also no roof report documenting the work required and damage identified. Sealant was also found on the holes in the sarking and the loss adjuster considered the insurer’s trades had done this as a ‘good will’ gesture. This lends weight that M sealed the cracked tiles on the roof. It is agreed there were trades on the roof during the 2015 claim. The sealant applied was some years old at the assessment of 2020. No report from M as to the work performed on the roof is available. I consider it fair in these circumstances to accept that the tile damage occurred either during the cyclone or because of the foot traffic. The complainant has provided a quote in the amount of $136,880.81 to carry out repairs to his home. The majority of these costs relate to a total roof replacement. The ARM report provided by the complainant states the tiles cannot be sourced and a reroof may be required. The insurer provided no evidence to show the cost of repairing the roof or evidence that it would be unable to carry out repairs. Based on the available information I am satisfied the insurer must meet its liability to replace the 30 chipped and damaged tiles in accordance with the terms of the policy. Insurer liable for water damage in the loungeroom It is not in dispute that the M carried out work to the loungeroom ceiling. Based upon the evidence supplied, new damage has now been caused to the loungeroom ceiling. The lounge room ceiling was replaced during the 2015 claim. The reporting indicates there is internal water damage to the lounge room which has entered via the broken tiles and damaged sarking. MBC reports the damaged sarking has allowed water to ingress into the ceiling and there is moisture related staining directly beneath the damage to the sarking. This staining is consistent with the same staining observed during the 2015 claim. The MBC reports and correspondence from the insurer’s loss adjuster agree the complainant should have been advised of the damaged sarking prior to repair of the internal ceilings in the lounge room. The loss adjuster also speculates the silicone applied to the sarking was likely a gesture of ‘ good will ’. I am satisfied the experts agree the sarking should have been addressed at the time of the repairs. The insurer provided correspondence from 2020 and says it made the complainant aware of damaged sarking at this time. The internal water damage predates the insurer providing the complainant with the MBC report. I am satisfied the broken roof tiles and damaged sarking has allowed water to ingress into the complainant’s lounge room ceiling. I am satisfied the damage to the ceiling has been caused Determination | Case number: 899270 Page 6 of 10 by the defective repairs following the 2015 cyclone. It is fair that the insurer accept liability for the internal water damage to the loungeroom. Insurer can cash settle claim for water damage to loungeroom The policy specifically excludes loss or damage due to gradual deterioration, depreciation and wear and tear. There is no evidence the sarking was damaged by the cyclone, foot traffic, or the January 2020 storm event. I accept that the damage to the sarking was most likely due to wear and tear and gradual deterioration. Th e repair of the sarking is the complainant’s responsibility and a maintenance issue. It is appropriate that these maintenance repairs be completed before the water damage is repaired. As the condition of the sarking impacts the insurer ’s ability to warrant repairs to the ceiling, I consider it fair for the insurer to cash settle the complainant for the damage to the loungeroom ceiling. AB provided a scope of works but it does not include costs for repairs to the loungeroom ceiling. CRD provided a quote that includes the loungeroom, hallway and ensuite. While initial concerns were raised regarding the complainant’s quote , I am satisfied CRD’s quote relates to the insured property. It is fair to use this quote as the basis of any cash settlement. I have assessed the cash settlement at $3,326.23. This is based on CRD quote of $2,300.39 for material and labour, 19.5% builder’s margin ($448.57), 10%GST ($274.89) and a 10% contingency ($302.38). The insurer is liable for internal damage to hallway, ensuite and bedrooms Based upon the invoices provided, the internal damage to the ceilings in the hallway, ensuite and bedrooms was not present at the time of the repairs in 2015. No work was authorised or carried out to these areas. The MBC report confirms the staining in the hallway, master bedroom, ensuite and bedroom 3 has been caused by the damaged roof tiles and sarking allowing water ingress. The photos and reporting confirm the staining in these areas is minor. Based on the available information, I am satisfied it is fair for the insurer to accept liability for the repair to these areas. I am satisfied the internal staining to the ceilings in the hallway, ensuite and bedrooms was most likely caused by the damaged tiles and deteriorated sarking. As the insurer cannot warrant the repairs to the ceilings until the maintenance is completed it is fair that the insurer cash settle the claim. The only relevant quotation is from CRD. Based on that quotation I determine the insurer pay the complainant:  hallway $1,976.92 being CRD materials and labour $1,367.22, 19.5% builders margin ($266.60), 10% GST ($163.38) and 10% contingency ($179.72)  ensuite $1,145.18 being CRD materials and labour $792, 19.5% builders margin ($154.44), 10% GST ($94.64) and 10% contingency ($104.10). No quotes have been provided for the internal damage to the bedrooms from either party. Accordingly, it is fair that within 14 days of the complainant ’ s acceptance of this determination the insurer arrange with the complainant a suitable time to assess this damage. The insurer can then cash settle the damage based on the quote obtained plus a 10% contingency fee. Determination | Case number: 899270 Page 7 of 10 The insurer is to accept the cost to rectify the colorbond roof sheeting The AB and MBC reports confirm issues with the colorbond sheeting above the front patio and the rumpus room. The MBC report confirms the sheeting has been secured to the existing timber purlins at 1.000m spacings and the fasteners do not have high wind washers and are non-compliant. The insurer has stated it cash settled the patio repairs. This relates to the rear patio and not the subject area which is located at the front of the property. The insurer accepts the issues with the barge capping which is on the colorbond section of roof above the patio and rumpus. It says it accepted this due to the lack of information regarding the repairs carried out by its trades at the time. The loss adjuster says the colorbond sheeting was not part of the insured work as no sheeting was invoiced. The complainant says he understood the colorbond roof formed part of the works and he did not authorise any private work to this area. It is agreed the roof has been recently replaced. The tax invoice and loss adjuster reports show asbestos was found in the patio sheeting and required removal. It is unclear whether this sheeting relates to the internal linings or the roof sheeting. There is no cost specified on the tax invoice for either. The insurer agrees there is a lack of information regarding the work carried out. It has accepted some issues relating to the patio roof and there was work carried out to the patio sheeting. I consider it fair for the insurer to accept the cost of repairing the damage to the colorbond roof sheeting identified by MBC. As the incomplete box gutter runs along behind the colorbond roof I am satisfied it is fair and reasonable for the insurer to assess the cost to rectify the colorbond sheeting and provide a 10% uplift for a cash settlement. Insurer not liable for cost to rectify the box gutter There is no dispute the complainant privately engaged M to undertake work to the box gutter. The information shows the box gutter did not form part of the accepted repairs from the 2015 claim. The complainant agrees he entered discussions with M to redesign the box gutter due to the possibility it would cause further internal water damage due to its design. The complainant also agreed for M to proceed with the work and he was to pay for this work. The complainant says M did not install the gutter to the agreed design and complete the work. The box gutter never formed part of the authorised repairs by the insurer. The damage to the box gutter appears to be due to the incomplete work that had been agreed between the complainant and M. I am satisfied it is fair for the insurer to decline the cost to rectify the box gutter. 2.2 Is the settlement for the barge capping, patio and rumpus room fair? Yes. The offer to pay $5,400 for the ceiling and painting damage to the rumpus room, patio plus the barge capping is fair in the circumstances. Determination | Case number: 899270 Page 8 of 10 The insurer to settle claim for water damage to rumpus room and patio The insurer has accepted liability for the unfinished ceiling and painting to the rumpus and patio and to fix the barge capping. AB reported on 17 January 2020 that there was internal water damage to the rumpus room and patio ceiling linings and to the installed cork flooring in the rumpus room. AB considered the damage likely to have occurred due to the poor workmanship in the installation of the roofing. In March 2021 the insurer offered to settle the claim for the cost for ceiling and painting only of the rumpus and patio plus a 20% margin and GST and include fixing of the barge capping for $4,500. The insurer recently increased this offer to $5,400 for the ceiling and painting damage to the rumpus room and patio plus the cost of fixing the barge capping. I am satisfied the offer represents a fair settlement of the damage sustained. 2.3 Is the insurer liable for any additional damage caused in the January 2020 storm? The available evidence is that not all the damage was not caused by the 2015 cyclone or faulty workmanship. It is fair that the insurer opens a new claim to assess whether the additional damage was due to the January 2020 storm. Insurer to assess whether any additional damage was caused by January 2020 storm Water began to enter the ceilings of the rumpus room and patio and damaging the cork flooring in January 2020. When reported to the insurer on 16 January 2020 a claim to assess the damage. The complainant believed the damage was caused by the incomplete repairs and unaddressed damage from the 2015 claim. On receipt of the AB report which indicated there were incomplete works or rectification issues relating to the 2015 cyclone, the insurer closed the new claim and assessed the damage under the 2015 claim. Subsequent reports indicate multiple events may have contributed to the damage. The complainant initially advised he was unsure if all the work pursuant to the CBS quote he provided is related to the 2015 cyclone. The CBS causation report indicates the complainant advised the damage was caused by the cyclone in 2015 and a hail event in 2020. The ARM report also confirms a hail event in 2020. The MBC and AB reports suggest water has leaked from the box gutter into the ceiling linings of the rumpus room and the front patio. The box gutter work was commenced in 2016 after the internal work was completed relating to the 2015 claim. While the insurer has accepted the internal water damage to the rumpus room and patio ceiling, the AB report also refers to damage to the installed cork flooring in the rumpus room. This was not accepted as related to the 2015 cyclone. The solar panels did not form part of the insured works under the 2015 claim. There is no evidence damage to the solar panels has been raised prior to this complaint. The solar panel report from CG in 2022 indicates hail impact. Determination | Case number: 899270 Page 9 of 10 The ARM report indicates further damage to the top coat of the tiles caused by hail. This has not been assessed by the insurer. Considering the information provided, I am satisfied it is fair that the insurer opens a new claim to determine whether the additional damage to the installed cork flooring in the rumpus room, the solar panels and the top coat of the roof tiles was caused by the January 2020 storm. 2.4 Is the complainant entitled to compensation for non- financial loss? Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We will only award this type of compensation if you suffer an unusual degree of stress, inconvenience, or delay because the insurer mishandled your claim. We recognise that making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim. Complainant has suffered an unusual degree of inconvenience The General Insurance Code of Practice relevant in 2015 claim requires insurers to accept responsibility for repairs and workmanship directly authorised by the insurer. It is fair it accepts the cost of rectifying damage relating to repairs authorised and the conduct of its trades. It is clear not all authorised work in from the October 2015 incident was completed. There were significant delays in the assessment process although not all the delays were caused by the insurer or its appointed experts. The insurer had available to it in early 2020 a report from AB supporting the complainant’s claim. In my view it should have acted at that time to resolve the issues and avoid delays. I am satisfied the complainant has suffered an unusual degree of inconvenienced caused by the insurer’s h andling of the claim. Accordingly, the complainant is entitled to $1,500 in compensation. 2.5 Why is the outcome fair? The outcome is fair as there is evidence of incomplete and faulty repairs causing additional damage to the complainant’s property. Other dama ge not related to the 2015 event may be related to the January 2020 storm and it is fair the insurer can assess this damage under a new claim. Determination | Case number: 899270 Page 10 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.