Home / QBE / Determination 899270
Determination 899270
Insurer's liability for additional damage from defective repairs after 2015 cyclone claim, and settlement amount
Summary
The complainant claimed for roof and water damage he attributed to defective repairs after Cyclone Marcia in 2015. AFCA found the insurer partly liable, ordered cash payments, tile replacement, assessment of other damage, a new claim for 2020 storm damage and $1,500 for non-financial loss.
Repairs authorised by the insurer were incomplete and defective so it must cover resulting damage, but the box gutter was private work and some damage may relate to the 2020 storm.
Issues
- Repairs or contractors primary · upheld“repairs following the 2015 claim were incomplete and defective and the complainant's property sustained some further damage”
- Claim amount dispute secondary · not upheld“The offer to pay $5,400 for the ceiling and painting damage to the rumpus room, patio plus the barge capping is fair”
- Claim denial secondary · not upheld“it is fair for the insurer to decline the cost to rectify the box gutter”
- Poor claim handling secondary · upheld“unusual degree of inconvenience caused by the insurer's handling of the claim”
- Delay secondary · upheld“The insurer had available to it in early 2020 a report from AB supporting the claim... should have acted at that time”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify
Related
Text of the determination
Determination
Case number 899270
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 899270 Page 1 of 10
Case number: 899270 18 May 2023
1 Determination overview
1.1 Complaint
In 2015 the complainant lodged a claim on his home and contents policy held with the
financial firm (insurer) after the property was damaged by Cyclone Marcia. The claim was
partially cash settled although most of the repairs were authorised by the insurer.
In 2016, the complainant noted further damage relating to the event and outstanding repairs.
The insurer accepted the additional damage and authorised repairs to the patio. The
complainant privately arranged for the insurer ’ s builder to replace a box gutter.
On 16 January 2020, following a severe storm the property sustained further water damage.
The complainant believes the damage was caused by incomplete and defective workmanship
relating to the 2015 event.
The insurer has offered a cash settlement of $5,400 for the barge capping and damage to the
rumpus room and patio. The complainant says the insurer should be liable for the further
repairs including roof replacement and seeks $136,880.81.
1.2 Issues and key findings
Is the insurer liable for additional damage from the 2015 claim?
Yes. The repairs following the 2015 claim were incomplete and defective and the
complainant’s property sustained further damage. The insurer must:
replace the 30 broken and chipped roof tiles identified by ARF
pay $6,448.33 for the damage to the lounge room, hallway and ensuite
arrange quotes to repair the damage to the master bedroom, bedroom three and the
colorbond sheeting. The insurer can then cash settle the repair cost based on the
quotations plus a 10% contingency.
Is the settlement for the barge capping, patio and rumpus room fair?
Yes. The offer to pay $5,400 for the ceiling and painting damage to the rumpus room, patio
plus the barge capping is fair in the circumstances.
Is the insurer liable for damage caused in the January 2020 storm?
Not all the damage was caused by the 2015 cyclone or faulty workmanship. It is fair that the
insurer opens a new claim to assess whether the additional damage was due to the January
2020 storm.
Is the complainant entitled to compensation for non-financial loss?
Yes. The delay in addressing the workmanship issues has caused an unusual degree of
stress and inconvenience to the complainant. Compensation of $1,500 is fair.
Determination | Case number: 899270 Page 2 of 10
Why is the outcome fair?
The outcome is fair as there is evidence of incomplete and faulty repairs causing additional
damage to the complainant’s property . Other damage not related to the 2015 event may be
related to the January 2020 storm and it is fair the insurer can assess this damage under a
new claim.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 days of the
complainant’s acceptance of this determination the insurer must pay the complainant:
$6,448.33 for the internal water damage to the lounge room, hallway and ensuite
$5,400 to repair the barge capping and the ceiling and painting of the rumpus and patio
$1,500 in compensation for non-financial loss
The insurer is to arrange with the complainant:
a suitable time for a roofer to replace the 30 chipped and cracked roof tiles
to assess the cost to repair/replace the colorbond sheeting, repair the water damage to the
master bedroom and bedroom three. The insurer may then cash settle the claim for the
damage based on the quote obtained plus a 10% contingency fee.
to open a new claim to assess whether there was additional damage arising from the
January 2020 storm as set out in section 2.3 of this determination.
Determination | Case number: 899270 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer liable for additional damage from the 2015
claim?
Yes. On balance, the repairs following the 2015 claim were incomplete and defective and the
complainant’s property sustained some further damage. The insurer must:
replace the 30 broken and chipped roof tiles identified by ARF
pay $6,448.33 for the damage to the lounge room, hallway and ensuite
pay the cost to rectify the colorbond sheeting.
Circumstances of claim
The complainant holds a Home Insurance policy with the financial firm that provides cover for
a series of listed events including storm. Storm is defined to include a cyclone.
On 23 February 2015 the complainant lodged a claim for storm damage to the property
following ‘Cyclone Marcia’, which occurred 20 February 2015.
The insurer assessed the claim and says that over a period from 23 February 2015 to 6 July
2016 it worked with the complainant to determine what rectification was required to the
property. Some of the repairs were completed by the insure r’ s builder, (M). Others were cash
settled due to pre-existing damage which meant the insurer could not warrant repairs.
In November 2016, the complainant sought cover for a box gutter. The insurer denied the
claim for the box gutter but agreed to repair damage identified after removal of a prop
installed by the complainant revealed further cyclone related damage.
The information exchanged indicates the box gutter had not been damaged by the cyclone. M
had recommended it be replaced due to a defective design. The replacement was being
managed by private agreement between the complainant and M. M had not completed the
agreed works.
Following a severe storm on 16 January 2020, the complainant notified the insurer after
identifying further water damage due to water leaking from the gutters and through the roof.
The complainant says the damage was caused by the incomplete and defective repairs
following the 2015 Cyclone.
There is no dispute that the property has been damaged. The issue is whether the damage
has been caused by an insured event, namely the cyclone in 2015 or the severe storm in
January 2020 or whether it is excluded under the terms of the policy.
Damage to roof tiles most likely due to repairs following Cyclone in 2015
The insurer had the damage assessed by (AB) on 17 January 2020. AB noted the claim
followed a heavy downpour with water seeping onto the flooring and through the roof into the
ceiling. The water damage was consistent with multiple water ingress events.
Following inspection of the roof above the damaged area, AB attributed the water damage to
poor workmanship in the previous roof repairs namely:
framing upgrades should have been addressed
barge flashing not water tight
external/internal fibre cement sheeting not painted
installed box gutter has water ponding
Determination | Case number: 899270 Page 4 of 10
installation of roof sheeting is poor
internal damage to the ceiling in rumpus room and patio and damage to installed cork
flooring.
The insurer also obtained a report on 17 September 2020 from (MBC), a building company.
The initial report concluded:
the tiled roof to the main dwelling had no cyclone damage but had pre-existing cracked
tiles which had sealant applied over the cracks
the box gutter had been incorrectly installed
sarking had been damaged allowing rainwater into the ceiling. As the ceiling was removed
in 2015 by M the damaged sarking should have been repaired
the colorbond roof over the rumpus room and patio has several defects starting with the
box gutter. There are no sumps or overflows installed. The box gutter has been
overflowing onto the fibre cement sheeting in the rumpus room and the soffits removed
from the patio.
all associated work to the colorbond sheeting, box gutter and soffits related to the private
work agreed by the complainant with M and not cyclone damage.
The complainant provided a roof replacement report from (CBS), a building services company
following an inspection of the property on 21 November 2022. The report identifies the date of
the event as 19 April 2020 although I accept this is an innocent error. CBS identified water
stains and damage in various rooms caused by the roof tiles and damaged sarking. CBS
considered the damage was caused by a storm or hail with 60% of the roof sheets or tiles
damaged.
The complainant also provided a roof report from (ARM), a roof maintenance and restoration
company. ARM considered there was hail damage and old impact damage and reported:
approximately 30 broken roof tiles
roof tiles throughout roof have some chips and hail marks to the point where it has
removed the top coating
sarking was not repaired when tiles replaced
no damage to solar panels
box gutter needs to be inspected due to leaks.
On 23 December 2022 MBC provided a supplementary report based on a desktop
assessment following receipt of the reports from CRD and ARM. The report concludes:
MBC agreed there were approximately 30 broken roof tiles and not 40% as stated by CRD.
(I note CRD says 60% of roof sheets/tiles damaged)
damage to roof tiles was due to heavy foot traffic and not impact during the cyclone in
2015
most of the cracks are along the bottom edge of the tiles which is consistent with heavy
foot traffic
sealant on cracked tiles applied several years ago and looks to be more than 5 years ago
and before the cyclone
the weathering of the broken tiles is consistent with the rest of the roof
agrees sarking has multiple rips and tears but says this is due to long terms deterioration.
The complainant says the insurer’s trades may have had difficulty in sourcing the
replacement tiles, noting the tax invoice for the work states the tile is rare, and the trades
sealed some tiles as an alternative. MBC has not commented on this.
The MBC says the sealant predates the cyclone event in 2015. I accept MBC may be able to
determine whether sealant has been recently applied or has some age. I am not satisfied
Determination | Case number: 899270 Page 5 of 10
however that it can conclusively determine the specific age of the sealant. The initial MBC
report is dated 2020 and the cyclone occurred in 2015, the reporting does not exclude the
possibility the cracks were caused and sealed during the work carried out to the roof following
the 2015 claim.
Fair for the insurer to replace the damaged tiles
The insurer says it has no images of the roof from the 2015 repairs or photographs confirming
the condition of the roof. There is also no roof report documenting the work required and
damage identified.
Sealant was also found on the holes in the sarking and the loss adjuster considered the
insurer’s trades had done this as a ‘good will’ gesture. This lends weight that M sealed the
cracked tiles on the roof.
It is agreed there were trades on the roof during the 2015 claim. The sealant applied was
some years old at the assessment of 2020. No report from M as to the work performed on the
roof is available.
I consider it fair in these circumstances to accept that the tile damage occurred either during
the cyclone or because of the foot traffic.
The complainant has provided a quote in the amount of $136,880.81 to carry out repairs to
his home. The majority of these costs relate to a total roof replacement. The ARM report
provided by the complainant states the tiles cannot be sourced and a reroof may be required.
The insurer provided no evidence to show the cost of repairing the roof or evidence that it
would be unable to carry out repairs. Based on the available information I am satisfied the
insurer must meet its liability to replace the 30 chipped and damaged tiles in accordance with
the terms of the policy.
Insurer liable for water damage in the loungeroom
It is not in dispute that the M carried out work to the loungeroom ceiling. Based upon the
evidence supplied, new damage has now been caused to the loungeroom ceiling.
The lounge room ceiling was replaced during the 2015 claim. The reporting indicates there is
internal water damage to the lounge room which has entered via the broken tiles and
damaged sarking.
MBC reports the damaged sarking has allowed water to ingress into the ceiling and there is
moisture related staining directly beneath the damage to the sarking. This staining is
consistent with the same staining observed during the 2015 claim.
The MBC reports and correspondence from the insurer’s loss adjuster agree the complainant
should have been advised of the damaged sarking prior to repair of the internal ceilings in the
lounge room. The loss adjuster also speculates the silicone applied to the sarking was likely a
gesture of ‘ good will ’. I am satisfied the experts agree the sarking should have been
addressed at the time of the repairs.
The insurer provided correspondence from 2020 and says it made the complainant aware of
damaged sarking at this time. The internal water damage predates the insurer providing the
complainant with the MBC report.
I am satisfied the broken roof tiles and damaged sarking has allowed water to ingress into the
complainant’s lounge room ceiling. I am satisfied the damage to the ceiling has been caused
Determination | Case number: 899270 Page 6 of 10
by the defective repairs following the 2015 cyclone. It is fair that the insurer accept liability for
the internal water damage to the loungeroom.
Insurer can cash settle claim for water damage to loungeroom
The policy specifically excludes loss or damage due to gradual deterioration, depreciation and
wear and tear. There is no evidence the sarking was damaged by the cyclone, foot traffic, or
the January 2020 storm event.
I accept that the damage to the sarking was most likely due to wear and tear and gradual
deterioration. Th e repair of the sarking is the complainant’s responsibility and a maintenance
issue. It is appropriate that these maintenance repairs be completed before the water damage
is repaired.
As the condition of the sarking impacts the insurer ’s ability to warrant repairs to the ceiling, I
consider it fair for the insurer to cash settle the complainant for the damage to the
loungeroom ceiling.
AB provided a scope of works but it does not include costs for repairs to the loungeroom
ceiling. CRD provided a quote that includes the loungeroom, hallway and ensuite. While initial
concerns were raised regarding the complainant’s quote , I am satisfied CRD’s quote relates
to the insured property. It is fair to use this quote as the basis of any cash settlement.
I have assessed the cash settlement at $3,326.23. This is based on CRD quote of $2,300.39
for material and labour, 19.5% builder’s margin ($448.57), 10%GST ($274.89) and a 10%
contingency ($302.38).
The insurer is liable for internal damage to hallway, ensuite and bedrooms
Based upon the invoices provided, the internal damage to the ceilings in the hallway, ensuite
and bedrooms was not present at the time of the repairs in 2015. No work was authorised or
carried out to these areas.
The MBC report confirms the staining in the hallway, master bedroom, ensuite and bedroom
3 has been caused by the damaged roof tiles and sarking allowing water ingress. The photos
and reporting confirm the staining in these areas is minor.
Based on the available information, I am satisfied it is fair for the insurer to accept liability for
the repair to these areas. I am satisfied the internal staining to the ceilings in the hallway,
ensuite and bedrooms was most likely caused by the damaged tiles and deteriorated sarking.
As the insurer cannot warrant the repairs to the ceilings until the maintenance is completed it
is fair that the insurer cash settle the claim. The only relevant quotation is from CRD. Based
on that quotation I determine the insurer pay the complainant:
hallway $1,976.92 being CRD materials and labour $1,367.22, 19.5% builders margin
($266.60), 10% GST ($163.38) and 10% contingency ($179.72)
ensuite $1,145.18 being CRD materials and labour $792, 19.5% builders margin
($154.44), 10% GST ($94.64) and 10% contingency ($104.10).
No quotes have been provided for the internal damage to the bedrooms from either party.
Accordingly, it is fair that within 14 days of the complainant ’ s acceptance of this determination
the insurer arrange with the complainant a suitable time to assess this damage. The insurer
can then cash settle the damage based on the quote obtained plus a 10% contingency fee.
Determination | Case number: 899270 Page 7 of 10
The insurer is to accept the cost to rectify the colorbond roof sheeting
The AB and MBC reports confirm issues with the colorbond sheeting above the front patio
and the rumpus room.
The MBC report confirms the sheeting has been secured to the existing timber purlins at
1.000m spacings and the fasteners do not have high wind washers and are non-compliant.
The insurer has stated it cash settled the patio repairs. This relates to the rear patio and not
the subject area which is located at the front of the property.
The insurer accepts the issues with the barge capping which is on the colorbond section of
roof above the patio and rumpus. It says it accepted this due to the lack of information
regarding the repairs carried out by its trades at the time.
The loss adjuster says the colorbond sheeting was not part of the insured work as no
sheeting was invoiced. The complainant says he understood the colorbond roof formed part
of the works and he did not authorise any private work to this area. It is agreed the roof has
been recently replaced.
The tax invoice and loss adjuster reports show asbestos was found in the patio sheeting and
required removal. It is unclear whether this sheeting relates to the internal linings or the roof
sheeting. There is no cost specified on the tax invoice for either.
The insurer agrees there is a lack of information regarding the work carried out. It has
accepted some issues relating to the patio roof and there was work carried out to the patio
sheeting. I consider it fair for the insurer to accept the cost of repairing the damage to the
colorbond roof sheeting identified by MBC.
As the incomplete box gutter runs along behind the colorbond roof I am satisfied it is fair and
reasonable for the insurer to assess the cost to rectify the colorbond sheeting and provide a
10% uplift for a cash settlement.
Insurer not liable for cost to rectify the box gutter
There is no dispute the complainant privately engaged M to undertake work to the box gutter.
The information shows the box gutter did not form part of the accepted repairs from the 2015
claim. The complainant agrees he entered discussions with M to redesign the box gutter due
to the possibility it would cause further internal water damage due to its design. The
complainant also agreed for M to proceed with the work and he was to pay for this work.
The complainant says M did not install the gutter to the agreed design and complete the work.
The box gutter never formed part of the authorised repairs by the insurer. The damage to the
box gutter appears to be due to the incomplete work that had been agreed between the
complainant and M.
I am satisfied it is fair for the insurer to decline the cost to rectify the box gutter.
2.2 Is the settlement for the barge capping, patio and rumpus
room fair?
Yes. The offer to pay $5,400 for the ceiling and painting damage to the rumpus room, patio
plus the barge capping is fair in the circumstances.
Determination | Case number: 899270 Page 8 of 10
The insurer to settle claim for water damage to rumpus room and patio
The insurer has accepted liability for the unfinished ceiling and painting to the rumpus and
patio and to fix the barge capping.
AB reported on 17 January 2020 that there was internal water damage to the rumpus room
and patio ceiling linings and to the installed cork flooring in the rumpus room.
AB considered the damage likely to have occurred due to the poor workmanship in the
installation of the roofing. In March 2021 the insurer offered to settle the claim for the cost for
ceiling and painting only of the rumpus and patio plus a 20% margin and GST and include
fixing of the barge capping for $4,500.
The insurer recently increased this offer to $5,400 for the ceiling and painting damage to the
rumpus room and patio plus the cost of fixing the barge capping. I am satisfied the offer
represents a fair settlement of the damage sustained.
2.3 Is the insurer liable for any additional damage caused in the
January 2020 storm?
The available evidence is that not all the damage was not caused by the 2015 cyclone or
faulty workmanship. It is fair that the insurer opens a new claim to assess whether the
additional damage was due to the January 2020 storm.
Insurer to assess whether any additional damage was caused by January 2020
storm
Water began to enter the ceilings of the rumpus room and patio and damaging the cork
flooring in January 2020.
When reported to the insurer on 16 January 2020 a claim to assess the damage. The
complainant believed the damage was caused by the incomplete repairs and unaddressed
damage from the 2015 claim.
On receipt of the AB report which indicated there were incomplete works or rectification
issues relating to the 2015 cyclone, the insurer closed the new claim and assessed the
damage under the 2015 claim. Subsequent reports indicate multiple events may have
contributed to the damage.
The complainant initially advised he was unsure if all the work pursuant to the CBS quote he
provided is related to the 2015 cyclone. The CBS causation report indicates the complainant
advised the damage was caused by the cyclone in 2015 and a hail event in 2020. The ARM
report also confirms a hail event in 2020.
The MBC and AB reports suggest water has leaked from the box gutter into the ceiling linings
of the rumpus room and the front patio. The box gutter work was commenced in 2016 after
the internal work was completed relating to the 2015 claim.
While the insurer has accepted the internal water damage to the rumpus room and patio
ceiling, the AB report also refers to damage to the installed cork flooring in the rumpus room.
This was not accepted as related to the 2015 cyclone.
The solar panels did not form part of the insured works under the 2015 claim. There is no
evidence damage to the solar panels has been raised prior to this complaint. The solar panel
report from CG in 2022 indicates hail impact.
Determination | Case number: 899270 Page 9 of 10
The ARM report indicates further damage to the top coat of the tiles caused by hail. This has
not been assessed by the insurer.
Considering the information provided, I am satisfied it is fair that the insurer opens a new
claim to determine whether the additional damage to the installed cork flooring in the rumpus
room, the solar panels and the top coat of the roof tiles was caused by the January 2020
storm.
2.4 Is the complainant entitled to compensation for non-
financial loss?
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We
will only award this type of compensation if you suffer an unusual degree of stress,
inconvenience, or delay because the insurer mishandled your claim.
We recognise that making a claim can be stressful and time-consuming, even if the insurer
handles the claim correctly. We will not award compensation for the ordinary degree of
inconvenience that comes with making a claim.
Complainant has suffered an unusual degree of inconvenience
The General Insurance Code of Practice relevant in 2015 claim requires insurers to accept
responsibility for repairs and workmanship directly authorised by the insurer. It is fair it
accepts the cost of rectifying damage relating to repairs authorised and the conduct of its
trades.
It is clear not all authorised work in from the October 2015 incident was completed. There
were significant delays in the assessment process although not all the delays were caused by
the insurer or its appointed experts. The insurer had available to it in early 2020 a report from
AB supporting the complainant’s claim. In my view it should have acted at that time to resolve
the issues and avoid delays.
I am satisfied the complainant has suffered an unusual degree of inconvenienced caused by
the insurer’s h andling of the claim. Accordingly, the complainant is entitled to $1,500 in
compensation.
2.5 Why is the outcome fair?
The outcome is fair as there is evidence of incomplete and faulty repairs causing additional
damage to the complainant’s property. Other dama ge not related to the 2015 event may be
related to the January 2020 storm and it is fair the insurer can assess this damage under a
new claim.
Determination | Case number: 899270 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.