Partial denial of storm damage claim, cash settlement amount, mould remediation, temporary accommodation and contents
Text of the determination
Determination
Case number 898824
Financial firm AAI Limited
Determination | Case number: 898824 Page 1 of 9
Case number: 898824 14 July 2023
1 Determination overview
1.1 Complaint
On 26 February 2022, the complainants lodged a claim under their home and contents
insurance policy held with the financial firm (the insurer) for storm damage. The insurer partly
accepted the claim for the internal damage, but denied the claim for the roof.
Repeated make-safe processes and assessments were arranged and the final claim decision
was postponed. The insurer has made offers for internal building repairs and contents, which
the complainants do not accept. They also question the insurer’s claim’s handling and
assessment of their entitlement to temporary accommodation.
1.2 Issues and key findings
Is the insurer’s assessment of its liability relating to the storm damage fair?
Yes. The insurer’s assessment is fair, h owever, it is also fair that:
the insurer be required to increase the cash settlement offer for the storm damage by 20%
arrange for necessary mould remediation works and an associated clearance certificate
cover the complainants for the temporary accommodation in line with this determination.
Is the insurer required to increase its offer for the claimed contents?
No. The insurer is not required to cover the disputed items. This is because the complainants
have not shown it is more likely than not that these items were damaged due to the storm or
associated damage to the insured property.
Are the complaints entitled to compensation?
Yes. The insurer is to pay the complainants $2,500 in non-financial loss (NFL) compensation
in line with the AFCA Rules.
Why is the outcome fair?
The insurer’s assessment of its liability under the claim for storm damage to the building is fair
and consistent with the available information and the policy. However, it is fair that the insurer
increase is liability under the claim to include a contingency payment as well as costs
associated with mould remediation and temporary accommodation. It is also fair the
complainants receive NFL compensation given their poor claim experience.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is required to comply with the provisions of this determination, to meet its
obligations regarding the claim.
Determination | Case number: 898824 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability for storm damage
to the insured building fair?
Yes. The in surer’s assessment of its liability for the internal stormwater damage to the insured
building is reasonable. However, the insurer is to increase its final claim settlement offer by
20% and cover the cost of the necessary mould remediation works.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is
entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Storm ’. Cover under the policy is subject to the conditions,
limitations and exclusions specified in the PDS.
The insurer accepts that a valid claim exists, however, says not all the damage claimed is due
to the storm event.
There is no dispute the stormwater ingress and associated loss or damage is due to
maintenance related issues noted to the roof of the insured building. The insurer identified
these issues, which the complainants arranged to be rectified in or about August 2022.
The complainants say the insurer’s assessment of its liability and associated cash settlement
offer is inadequate and incomplete.
Complainants carry the onus to show insurer’s offer is incomplete/inade quate
The exchanged material indicates the complainants started living at the insured property in
around January 2022. At the time of lodging the claim in February 2022, the complainants
reported stormwater leaking through the ceiling in the entry area, located adjacent to the
master bedroom and the open space living areas. The complainants were unable to provide a
specific date when the stormwater ingress first occurred. The complainants say:
the insurer’s cash settlement offer of $14,522.92 for the building repairs is incomplete
additional damage caused by an escape of liquid event from the shower is the direct result
of an assessment and/or make safe works authorised by the insurer.
The complainants carry the onus to show the cash settlement offer is incomplete and/or
inadequate to repair the stormwater ingress damage.
Insufficient material showing insurer’s assessments and reports are incorrect
The insurer has provided and relies on reports from its appointed building c onsultants’ ‘AM’
and W as well as loss adjusters and restoration consultants ‘N’, ‘J’ and ‘S’. The insurer also
arranged for dual assessments with its internal assessors, W and the complainants.
The final dual assessment report was created on 16 November 2022, being months after the
assessment took place on 15 August 2022. The complainants say due to this delay, the
SOW’s are likely to be inaccurate. The complainants also raise dissatisfaction regarding the
insurer’s assessor’s late arrival and poor awareness of the issues in contention.
Determination | Case number: 898824 Page 3 of 9
However, the complainants have not provided any independent or qualified expert information
in support of their position that the insurer’s assessments and associated claim settlement
offer is inadequate. The insurer has provided several reports and supporting information
including photographs from the various consultants appointed to the claim. I have carefully
reviewed all this information and am satisfied the consultants are suitably qualified to provide
their opinions on the cause and extent of damage.
Without persuasive information to the contrary, I accept the insurer is entitled to rely on the
information from its appointed consultants. It would be unfair to disregard the findings of the
adequately qualified experts and therefore , I accept the insurer’s SOW and associated cost of
repairs in the amount of $14,522.92 are consistent with its policy obligations. However, it is
fair that the insurer be required to increase this cash settlement offer by a 20% contingency
payment.
Accordingly, the insurer is to increase its final claim settlement offer for the internal building
damage by 20% to $17,427.92. This is to allow for contingencies, the transfer of risk
associated with arranging the repairs to the complainants and a loss of the policy’s lifetime
repair guarantee.
Insufficient material to show insurer caused a second event and/or damage
During an assessment by W on 7 June 2022, a secondary leak or escape of liquid (EOL) was
discovered in the shower plumbing, behind the cupboard area that presented with extensive
black mould in the separate living/dining room area.
On the exchanged material, the EOL event resulted in damage to the cork/lino floor covering
and underlay in the laundry and living/dining area as well as damage to the cupboard and
adjacent wall. W’s report shows the complainants were asked to turn the shower on and
direct the water towards the shower taps, which showed water running down the wall cavity.
The complainants assert the EOL event is a result of the insurer ’s trades walking/standing on
the shower base with nails in their boots. The complainants say the trades made a hole in the
shower base next to the drain. Also, the complainants say they tricked W and never sprayed
the shower wall, whi ch proves W’s finding on the EOL is misleading and incorrect.
I acknowledge the complainants’ statements, however, they have not provided any
compelling information to support their position. The allegation that the insurer’s trades
damaged their property is a serious assertion and requires persuasive supporting information,
which has not been provided. I am not of the view the complainants’ reference to trying to
trick W assists their position. There is no evidence to support this occurred or that it
prej udiced W’s investigations. Further, it would be contrary to the complainants’ obligations to
assist and facilitate the insurer’s investigations as well as to act with the utmost good faith.
I am not satisfied the complainants have established, on balance, the insurer or its trades
damaged the insured building. Any concerns regarding the assessment of the EOL event and
associated claim are independent of this complaint, which is limited to the claim lodged for
loss or damage caused by the storm event in February 2022. Any issues or concerns relating
to the EOL claim would need to be considered under a separate and new complaint.
Fair for the insurer to cover the necessary mould remediation works
The complainants have indicated that final restoration works (including mould remediation)
has not been completed.
Determination | Case number: 898824 Page 4 of 9
In response, the insurer acknowledges that during the dual-assessment on 16 August 2022
that the complainants had raised concerns regarding mould development. However, the
insurer believes it is not liable for the mould remediation given the re-appearance of mould is
due to the complainants’ failure to arrange necessary maintenance works to the roof, of which
they were made aware of from as early as 11 March 2022.
The insurer says since March 2022, it has gone above its policy obligations in arranging
several rounds of make safe works and mould remediation. I acknowledge the insurer ’s
investigations did identify maintenance related issues with the roof from as early as March
2022. However, it is a lso clear that the complainants disputed the outcomes of the insurer’s
assessments and the insurer’s consideration of its liability was not finalised in March 2022.
Rather, it was not until 23 November 2022 that a final claim settlement decision was made by
the insurer. Further, it was not until 14 June 2022 that the insurer formally put the
complainants on notice regarding their obligation to arrange the necessary maintenance
works to the roof. The claim file notes show the insurer discouraged the complainants from
arranging the maintenance given the dispute regarding the roof ’s assessment and that this
may compromise any further need to re-assess the roof.
I note mould remediation works were left incomplete by consultants ‘J’, as noted in its report
dated 12 July 2022 saying the claim had been cancelled. There is an absence of any
persuasive information to show the insurer completed/finalised the recommended mould
remediation works from July 2022 or that the complainant was provided with a completion
certificate in this regard.
I am satisfied the available information shows a failure on the part of the insurer to
communicate the complainants’ obligations in a clear manner and poor communication for
months has caused or contributed to the mould infestation within the home. Further, that the
insurer’s trades did not adequately complete the required mould remediations works when
contracted to do so.
Accordingly, it is fair that the insurer be required to cover the complainants for the outstanding
and necessary mould remediation works as well as provision of a completion certificate for
these works.
The insurer is to cover additional temporary accommodation costs
The complainants are seeking additional temporary accommodation benefits under their
policy because the property remains unliveable due to the presence of mould. On the
exchanged information, the insurer issued payments totalling $38,200 towards temporary
accommodation, which it says meets the maximum policy benefit (up to 10% of the building
sum insured amount of $382,000)
Despite this, the insurer’s IDR letter issued on 5 August 2022 indicated the limitation may be
reviewed due to the delays experienced. However, in its final claim decision letter issued on
23 November 2022, the insurer says the property was deemed unliveable due to mould
development from continuous water ingress, which it says is due to the complainants’ failure
to arrange the required maintenance works to the roof.
The complainants have indicated the roof maintenance works have since been completed.
On review of the available information, I accept once the complainants were placed on formal
notice (14 June 2022) and provided with a copy of W’s roof report (1 July 2022) , they
attended to the required roof maintenance. I am not satisfied it would be fair to hold the
complainants solely responsible for the delay in arranging the maintenance works because of:
Determination | Case number: 898824 Page 5 of 9
the insurer’s poor communication in this respect
the insurer’s indication not to complete the roof works whilst the issue remained in dispute
the insurer’s delay in providing the formal notice to arrange the maintenance works.
Given this, I am of the view it would be unfair to allow the insurer to take into consideration
temporary accommodation provided to the complainants between February 2022 to June
2022 , in its assessment of the complainants’ policy entitlement. It is reasonable to accept that
had the insurer been clear in its communications regarding the complainants’ obligation to
arrange the roof maintenance works as a priority, they would have arranged these works as
shown by their actions after the formal notice in June 2022.
Accordingly, subject to being provided reasonably compelling information by the complainants
in support of their claim for temporary accommodation expenses, the insurer is to cover the
complainants for these expenses up to the policy limit (not taking into consideration
temporary accommodation payments made for the February 2022 to June 2022 period).
In the instance the complainants are cash settled for out of pocket expenses incurred towards
temporary accommodation for the February 2022 to June 2022 period, the insurer is to pay
interest on the reimbursement. Interest is to be applied in line with section 57 of the Insurance
Contracts Act 1984 from the date the complainants made the payments to the date on which
the insurer issues the reimbursement.
2.2 Is the insurer required to increase its offer for contents?
No. The complainants have not shown an entitlement to cover for the contents items in
dispute.
Complainants seek additional cover for contents
Between 3 August 2022 and 16 September 2022, the insurer issued a total of $22,294.61 for
damaged contents under the claim. These payments include settlement of $7,346.61 for
carpet replacement in the open space living/dining and master bedroom areas.
The complainants say there are various other contents damaged because of the storm and/or
mould, which the insurer has declined. The list of the disputed contents has been provided
under section 3.2 of this determination.
The insurer says there is no evidence that these disputed contents items were damaged. The
insurer says the disputed contents are the type of items that are generally not affected by
mould and in the absence of any expert report commenting on the cause of damage, the
policy does not respond.
Insufficient material to show disputed contents were damaged
It is accepted insurance law that the complainants carry the onus to show it is more likely than
not the loss or damage claimed falls within the terms of the policy. The complainants have not
provided any substantive information to show the disputed contents items were damaged by
the storm, mould or failures on the part of the insurer or its appointed trades.
The complaints say this is because they disposed of the items without taking photographs or
arranging assessments based on the advice from the insurer’s assessor. As a res ult, they say
they are now in a position where they are unable to prove their loss.
Determination | Case number: 898824 Page 6 of 9
I have carefully reviewed the available information including the initial make safe report
i ssued by the insurer’s builder AM dated 27 February 2022. There is no mention of damaged
contents or of any discussion or advice provided to the complainants regarding contents.
For completeness, I have also carefully reviewed the available case file notes and found two
relevant records of conversations regarding the disposal of contents. I am satisfied this
information shows on 11 March 2022, the insurer told the complainants:
- adv to take photos of contents
[…]
On 13 April 2022:
IO [complainant] asked about contents portion, wanted to know if she just sent a
list of items thrown out
[insurer] asked if photos were taken
IO adv no as she had not had any contact with anyone so didn't know
adv to send through and we would review and advise
There is no record to suggest the complainants were told to simply dispose of the contents
items they say were to be the subject of the claim. Rather, on balance, I accept the
complainants were told as early as 11 March 2022, that they would need to take photos of the
damaged contents items. Without persuasive information to the contrary, I am not satisfied
the complainants have shown they were provided with incorrect advice by the assessor or
otherwise.
I am not satisfied the complainants have provided sufficient information to show that the
contents items in dispute were damaged and if so, they were damaged by the storm event or
associated mould. Accordingly, I accept it is fair that the insurer be permitted to decline cover
for these disputed items.
Insufficient information showing the insurer’s file notes are misleading
The complainants say t he insurer’s claim file notes contain incorrect information. The
complainants, as an example, refer to a conversation with the insurer on 20 July 2022. During
this conversation, the complainants say the insurer read the case file note from the previous
day (19 July 2022 log at 3:51pm) which stated:
offer to cash settle CONTENTS was refused’ by the customer
The complainants say they never spoke to anyone at this time, proven by the fact the insurer
said they tried contacting them without success. The complainants say this shows that it is
possible the insurer records inaccurate versions of conversations in its system.
The insurer was requested to provide a copy of their claim file notes along with audio
recordings for calls on 19 July 2022 and 20 July 2022. The insurer provided the telephone call
Determination | Case number: 898824 Page 7 of 9
recordings and the claim file notes which have been considered. I am not satisfied these
recordings support the complainants’ position. I note the complainants were provided with
copies of these call recordings for comment, however, they have elected not to provide a
response to this information.
I am not satisfied it has been shown that the insurer’s claim file notes are incorrect and/or that
there is adequate persuasive information to support the very serious assertion that the insurer
has attempted to mislead the complainants or AFCA.
2.3 Are the complaints entitled to compensation?
The complainants are seeking compensation
The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
The complainants are seeking compensation for stress and inconvenience arising from the
insurer’s overall management of the claim.
Insurer to pay $2,500 in NFL compensation
I acknowledge the complainants ’ dissatisfaction with the level of service received under the
claim. This includes having to repeatedly leave their home with a young baby due to mould
re-appearing on several occasions following inadequate make safe works by the insurer’s
trades. I also note the challenges faced by the complainants in finding suitable temporary
accommodation at short notice.
Considering the extent of the delays and the impact this has had on the complainants, I am
satisfied the insurer should compensate the complainants for non-financial loss. I accept the
insurer’s overall management of the claim, including its communications, were poor. This has
resulted in unreasonable delays in arranging necessary works and the repeated re-
appearance of mould within the complainants’ home.
I accept these delays, being out of their home with a baby and the uncertainty surrounding
the repairs to be accepted under the claim will have caused the complainants to experience
undue levels of stress, anxiety, delays and physical inconvenience.
Therefore, I am satisfied it is fair that the insurer be required to pay the complainants $2,500
in NFL compensation in line with the AFCA Rules. This is to be paid within 14 days of the
insurer receiving notice of the complainants’ acceptance of this determination.
Other compensation sought by the complainants
The complainants have also sought reimbursement of the insurance premiums paid over the
life of the claim. I am not satisfied the insurer is required to reimburse the premium payments
as it has continued to provide insurance cover during this time and is covering the
complainants for the extent of loss or damage established to be covered under the policy.
Further, the insurer is entitled to these payments in line with the terms of the contract which
both parties are bound by and agreed to when entering into the contract,
I note the complainants have also sought reimbursement and/or cover for additional costs
such as medication, food spoilage, increased electric costs due to the insurer running drying
Determination | Case number: 898824 Page 8 of 9
equipment within their home. However, despite requests, the complainants have not provided
evidence in support of these claims. Without reasonably compelling supporting information, I
am not able to consider or come to an informed view in this regard.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Disputed content items
Content item description Amount claimed $
Lamp
6 plug surge prot ector with
ethernet ports
285
129
Determination | Case number: 898824 Page 9 of 9
Microsoft office soft ware 99
PC 2,698
PC Virus protection
PC memory 2TB storage
Ryobi Drill
Ryobi Sander
Ryobi Leaf blower
Ryobi charger
Ryobi battery
Ryobi battery and charger
Multiple CD (50 and DVD (70)
78
68
109
90
109
79
139
149
1,500
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.