Home / Suncorp Group / Determination 898534
Determination 898534
Scope of works and cash settlement for water leak damage, including whether cracking and movement throughout the home was caused by the leak
Summary
Complainants disputed the insurer's scope of works and $108,500.56 cash settlement offer for leak-related damage to their home. AFCA found the leak was the proximate cause of all the cracking and ordered a new expert scope of works, cash settlement based on quotes plus 15% contingency, temporary accommodation, and reimbursement of M's report costs up to $5,000.
Applying proximate cause, the panel preferred the complainants' engineer's evidence that the leak caused heave and the more severe cracking throughout the home, making the insurer liable for all of it.
Issues
- Claim amount dispute primary · upheld
“Panel accepts the insurer is liable for all the movement and cracking damage being claimed by the complainants; settlement offer to be increased.”
- Claim denial secondary · upheld
“Insurer did not accept all the movement and cracking damage was caused by the leak; panel found proximate cause is the leaking pipe.”
- Inadequate claim investigation secondary · upheld
“FM's reasons for concluding otherwise are not persuasive; M's points on trees were not addressed by FM.”
Subjects and remedies
home or building damagepay claimpay compensationreassess claim
Text of the determination
Determination
Case number 898534
Financial firm AAI Limited
Determination | Case number: 898534 Page 1 of 6
Case number: 898534 7 July 2023
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
They lodged a claim on 25 June 2020 after a leaking pipe was identified which caused
damage to the home.
The insurer partially accepted the claim. However, it determined that a drying period was
required prior to the completion of any repairs. Once this concluded, the insurer engaged its
engineer to provide a scope of works for the claim related repairs.
The complainants dispute the insurer’s scope of works. They do not believe it adequately
addresses all the damage sustained. Since the matter has been with AFCA, the insurer has
made a cash settlement offer of $108,500.56 to resolve the dispute. This included 16 weeks
of temporary accommodation.
The complainants rejected this offer and are seeking all damaged areas to be included in the
scope of works.
1.2 Issues and key findings
Is the insurer required to increase its settlement offer?
Yes. This is because the panel accepts the information shows all the movement and cracking
damage was caused by the leaking pipe.
1.3 Determination
This determination is substantially in favour of the complainants.
The insurer should settle the claim as set out in section 2.1.
Determination | Case number: 898534 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer required to increase its settlement offer?
Insurer says settlement offer adequately addresses claim related damage
The insurer initially made the complainants an offer of $52,353.90 based on the areas its
engineer (FM) accepted were claim related. This amount is based on CR’s quote. Following
the complainants raising missing items, further adjustments were made. Such adjustments
included the upper bathroom and other areas.
The insurer has now provided the following breakdown of its cash settlement offer:
Item Amount
Previously provided SOW $59,284.83
Additional works SOW $3,795.00
15% contingency on SOWs $9,461.97
Upper bathroom SOW $29,558.76
Temporary accommodation $6,400.00
Total $108,500.56
The complainants maintain the insurer ’s scope of works (SOW) is inadequate to rectify all the
claim related damage. They say all the movement and cracking damage in the home was
caused by the leak and should be covered.
The complainants also advised the insurer they preferred a cash settlement as they wish to
complete the works privately. The insurer has agreed to this.
Insurer’s engineer says not all the damage was caused by the leak
The insurer does not agree all the movement and cracking damage was caused by the leak.
In this regard, the insurer relies on FM’s evidence.
FM says the damage to the home caused by the leak is localised to the eastern corner of the
home. FM included photos to show previous cracking repairs around the home to support its
position and to substantiate the home was subject to movement in the past. The
complainants confirmed the home has experienced movement in the past and that this was
repaired. However, the cracking after the event was much more severe than previous cracks.
FM ’s report says that due to the age of the home (built approximately between 1860 and
1884) its footings would not meet current building codes. FM says due to this the home is
more susceptible to seasonal movement and cracking as supported by the photos within
its report.
It is FM’s opinion that damage obse rved in other areas of the house is unrelated to the leak
event and has been caused by on-going long-term variations in the moisture content of the
reactive foundation soils at the subject site due to a combination of the following factors:
Seasonal changes in soil moisture content, and
Tree root drying of foundation soils caused by nearby trees and vegetation.
Determination | Case number: 898534 Page 3 of 6
Complainants ’ experts challenge insurer ’ s position
The complainants provided two separate reports from independent engineers to support their
claim for the additional cracking around the home.
The first report was provided on 12 July 2022 by engineer BS. BS says the visible cracking
damage was the result of major foundation movement due to change in moisture conditions in
the soil and clay shrinkage caused by the stormwater drainage leak. BS says the house is
constructed on a singular footing system and that if a portion of the house is experiencing
movement, then the whole house will experience problems as seen at the complainants ’
property. It also says concrete foundation shrinkage cracks were identified and that these
cracks are allowing the water to seep through the foundation walls.
The insurer says BS’s report included the following inaccuracies:
The damage was from a supply pipe leak, not a stormwater drainage leak
The home was constructed on a number of systems and not a singular footing
The second engineering report was from M. M ’s report was dated January 2023 and
highlighted the following:
The home was built sometime between 1860 and 1884 and the complainants have lived in
the property for about 23 years.
The complainants advised there was very little cracking evident in the building for at least
20 years prior to the water leak event, and that the start of the cracking and movement
coincided with the water leak event.
M says the home is structurally stiff, and any movement at one side of the home will be
transferred to other areas, albeit less severely further away from the leak.
M says it is highly probable damage to the outer walls and rooms toward the north, west
and south of the building are also due to soil heave which has occurred under the eastern
end of the house.
It can be seen from this report that the damage to the house is extensive throughout. It is
more severe on the eastern side, lessening further away from the area of impact of the
leak. However, there is significant damage throughout the house, extending to the western
side and front porch/balcony.
The suggestion by FM that some of the damage was caused by tree effects is not valid, as
there are no significantly large trees of the type that cause drying of the soils near to the
house. All large trees are in excess of 10m from the house.
The area around the house is well paved, and generally steeply sloping, hence the ground
is well protected from drying or wetting. Hence the damage to the house is due to the
water leak event which occurred in 2020.
BS’s evidence is not persuasive
BS appears to have incorrectly identified the footing of the home as being singular. The
available information indicates otherwise. It is clear BS relied on this factor in concluding all
the damage was related to the leak.
The leak was from a supply pipe. This would likely be leaking a substantial amount of water. It
was also leaking downhill into the property. There is no dispute this has caused heave at one
part of the property which has influenced its foundations to a fair degree.
The panel accepts the home has been subject to previous movement in the past. However,
the complainants have provided evidence to show the cracking was relatively minor. This
includes evidence from their builder. It is not comparable to the cracking now evident, which
seems more extensive and significant.
Determination | Case number: 898534 Page 4 of 6
FM’s first report did accept a leak event could cause building movement related damage
remote from the leak. However, this would be less severe and extent in nature. Whilst FM
observed this phenomena in its report, it did not accept the leak was the cause given
evidence of previous repairs and cracking.
M noted that trees are unlikely to have caused settlement given one appeared to die in 2014
and the other one was about 13m away from the property. FM was not asked to comment on
these factors.
Proximate cause is the leak
Given all this, the panel notes the following.
There are likely two factors causing the movement and cracking damage further away from
the leak. This would be the pre-existing movement and the leak. This is because there is no
dispute these areas have had some level of cracking damage in the past but it is now more
significant.
The issue is therefore determining the proximate cause of this disputed damage. Proximate
cause is the dominant, efficient or operative cause of the loss. It is not required to be last in
time or the sole cause. It is a question of fact that depends on the circumstances of each
case. It requires a common sense evaluation of the evidence.
After careful consideration of all the exchanged information, the panel is persuaded the
proximate cause is the leaking pipe. Whilst the pre-existing movement has been a
contributory factor, the panel does not accept it is also the proximate cause.
In this regard, the panel is persuaded by M’s report due to the following factors.
Both M and FM agree that heave in one area can cause damage to areas further away, albeit
not as severe. That is what is happening here.
FM’s reasons for con cluding otherwise are not persuasive. M has provided some salient
points identifying why the trees were unlikely to have played a dominant role in the damage.
This has not been addressed by FM. Further, the panel accepts the complainants have
provided evidence to show the cracking and movement damage further away from the leak
was more severe than previously noted. This was supported by their builder. Their evidence
in this regard is not refuted.
This more severe cracking is likely caused by the leak. This is supported by M. Further, this
type of damage can occur from a leak as noted by M and FM.
Therefore, the panel accepts the insurer is liable for all the movement and cracking damage
being claimed by the complainants.
Claim should be settled in this way
The parties are to engage an independent engineer or building consultant (‘expert’) to inspect
the property and provide a full scope of works for all the required repairs.
The expert should be one agreed to by the parties. This can be done by the insurer providing
a list of three experts that the complainant can choose one from.
The expert’s costs are to be borne by the insurer.
Determination | Case number: 898534 Page 5 of 6
Once this expert has been engaged and has completed the scope of works, each party can
obtain at least one, and no more than two, quotes based on that scope of works. Those
quotes should also include an estimated repair time.
If only one quote is obtained, then the insurer is to cash settle the claim based on that quote
plus a 15% contingency. If more than one quote is obtained, then the insurer is to cash settle
the claim based on the average of those quotations with a 15% contingency.
The contingency is to address the fact the risks of the works are passing to the complainants
and the likely possibility that there may be variations required during the works.
For temporary accommodation, the insurer is to cash settle this based on the average
estimated repair time provided in the quotes. The panel notes it does not appear disputed that
$400 per week is a fair rate. Therefore, the insurer can use this rate when cash settling the
temporary accommodation benefit.
The panel also considers it fair the complainants be reimbursed for M’s reports under Rule
D.5. This is becaus e M’s evidence was necessary and assisted them. The insurer should
reimburse M’s costs subject to invoices being provided in support and the amount not
exceeding $5,000.
Determination | Case number: 898534 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.