Home / Suncorp Group / Determination 898276

Determination 898276

Method and amount of settlement for defective roof repairs under lifetime repair guarantee, and non-financial loss for claim delay

FirmSuncorp Group
Decided2023-07-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$24,035
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

A hailstorm roof repair by the insurer's builder was defective and leaks continued; the insurer wanted the complainant to first do maintenance and offered a cash settlement of about $17,719. AFCA found maintenance was needed, set cash settlement at $24,035 and awarded $2,000 for non-financial loss.

The insurer's discretion to cash settle must be exercised fairly; given exclusion-related maintenance issues cash settlement was appropriate, with the amount adjusted for contingencies and architect supervision, and poor claim management warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 898276 Financial firm AAI Limited Determination | Case number: 898276 Page 2 of 8 Case number: 898276 23 June 2023 1 Determination overview 1.1 Complaint The complainant’s roof was damaged by a hailstorm in November 2014. She made a claim on her home insurance policy with the financial firm (insurer). The insurer accepted the claim and appointed AD builders who repaired the roof. On 15 May 2021 the complainant experienced water leaking through the roof. Inspection by the insurer identified poor workmanship with the previous repairs but also maintenance issues with the chimney brickwork and mortar. The insurer accepted a new claim based on the insurer’s lifetime guarantee of its repair work. Dispute has arisen as to the necessity of the maintenance issues and method of settlement. 1.2 Issues and key findings Are there rectification issues which require attention prior to the rectification work to stop water ingress? Yes. Deterioration in the brickwork and mortar is a contributing factor to the leaking and requires appropriate maintenance work. Should the claim be resolved by the insurer undertaking rectification work or by a cash settlement? Due to the necessary maintenance issues, a cash settlement is the appropriate way to proceed subject to the amount of the cash settlement being fair and reasonable. Is the cash settlement offered by the insurer fair and reasonable? No. The insurer’s offer should be increased to a cash settlement of $24,035 which is fair and reasonable Is the complainant entitled to compensation for non- financial loss? Yes. Due to the delay and poor management of the claim process it is fair the insurer pays the complainant $2,000 in non-financial loss. Why is the outcome fair? The outcome is fair because the cash settlement is reasonable and allows the complainant to have control of the rectification process. 1.3 Determination This determination is substantially in favour of the complainant. Within 21 days of acceptance of this Determination the insurer is to:  pay $24,035 by way of a cash settlement to the complainant.  pay $2,000 compensation for non-financial loss to the complainant. Determination | Case number: 898276 Page 3 of 8 2 Reasons for determination 2.1 Are there maintenance issues which require attention prior to the rectification work to stop water ingress? Deterioration in the brickwork and mortar is a maintenance issue which is required to achieve rectification of the defective work. Complainant relies on insurer’s home repair guarantee The 2014 insurance policy issued by the insurer covered damage caused by the event of storm. The present claim is based on the home repair guarantee contained in that policy (see 3.2 below). The insurer has ultimately accepted its initial repairs were defective. However, the insurer says that whilst it accepts responsibility to repair defective roof flashing it is not responsible for the maintenance of deteriorated bricks and mortar. The insurer says these are not within the terms of its guarantee. Further the insurer relies on an exclusion in the 2014 policy for gradual weathering of bricks and mortar (see 3.2). In this regard the insurer must establish the exclusion on the balance of probabilities. The complainant denies that the weathering is the cause of the leak. The complainant’s home is a heritage property well over 100 years old. There is no dispute that rainwater is still leaking into the home and that the point of ingress is where the chimney emerges through the metal roofing. The complainant has lived in the home for 35 years and says there was no leaking from the chimney until the 2014 hailstorm and the roof repairs conducted at that time. Expert reports are conflicting There have been a multitude of building and plumbing reports obtained by the insurer on the insured property since the May 2021 water ingress. There are too many to summarise in this Determination. The complainant estimates her roof and chimney were inspected by more than 30 contractors in the period up until August 2022. The insurer initially appointed builder H who found in a June 2021 report that water ingress had caused substantial damage in the bathroom ceiling and that this was consistent with storm damage from recent rain. A roof plumber M provided a report of 10 June 2021 which found poor workmanship with the installation of the flashing after the 2014 claim but also said there was a maintenance issue as the complainant was required to reseal the flashings every 3 years. The insurer appointed AD to assess the quality of the 2014 repairs, despite the fact that AD had undertaken those repairs. AD provided a report of 20 August 2021 that found the issue was gradual deterioration of the chimney flue stack and not its own prior repair work. The complainant provided a report from an architect dated 21 September 2021 which found the flashing had not been bedded into the brickwork and further commented that reliance on sealant is not good building practice. H provided further reports in October and November 2021. The insurer acknowledges H’s reports are inconsistent. On 27 October 2021 H stated the complainant needed to undertake maintenance to the chimney brickwork and mortar. On 7 November 2021 H concluded there was poor workmanship by the previous repairer. Determination | Case number: 898276 Page 4 of 8 By contr ast the complainant’s architect has provided a series of clear and authoritative reports on the cause of the leaking and how it is best resolved. The architect on 3 November 2021 advised that specific pre- fabricated flashing was required. Insurer’s a ttempt at rectification failed In December 2021 a dual assessment was conducted with the assessor and roofer TR who attended as a representative on behalf of AD. On 7 January 2022 TR reported that the main cause of water ingress was the natural age and deterioration of the mortar joins in the chimney stack. TR further said the flashing was in sound condition and would not cause water ingress if the mortar was not deteriorated. On 13 January 2022 the insurer’s assessor conceded the flashings did not return into the brickwork sufficiently. A scope of works was prepared for AD to carry out repairs. The complainant was provided with temporary accommodation. Unfortunately, despite AD’ s repair work, the leaks re-occurred in February 2022. New scope of works prepared On 24 June 2022 the insurer obtained a forensic building report from S. This report confirmed poor installation of the flashings around the chimney and whirly bird. In July 2022 the complainant’s architect provided drawings to the insurer as to how the flashing should be installed. In November 2022 the insurer instructed builder AM to provide a report and scope of works for repairs. AM advised that maintenance work was required by the complainant to fix the porous grout and deteriorated mortar of the chimney bricks. On 14 December 2022 AM stated that the maintenance work would need to be undertaken prior to further rectification works. On13 January 2023 t he complainant’s archi tect provided contrary advice that the mortar should be repointed after the new flashings are installed. In March 2023 the insurer confirmed that that it remains willing to undertake the rectification work and to follow the architect’s drawings but that the complainant must first carry out maintenance to the deteriorated bricks and mortar. The complainant on her architect’s advice remains unwilling to do this. The complainant’s preference to date has been that the insurer do the necessary rectification. The insurer has proposed options to the complainant to enable the rectification work to be done under warranty including removing the chimney and or constructing a metal box over the chimney. These are not acceptable to the complainant and would likely require planning approval. Deterioration in the brickwork and mortar is a maintenance issue It is difficult to reconcile the different opinions expressed. I am unable to be confident as to the independence of some of the expert reports provided by the insurer. I do accept that AM has reasonable grounds to be concerned at warranting its work, when dealing with a more than a hundred-year old structure which has clearly weathered substantially. The complainant maintains the flashing is the problem but accepts that the mortar requires repointing. There is no suggestion the brickwork and mortar became porous due to a listed insured event or due to the faulty repairs in 2014. The nature of the damage indicates it is likely that leaking was occurring for some before being detected in May 2021. On balance I accept that the deterioration in the brickwork and mortar is a contributing factor to the leaking and requires appropriate maintenance work. That work is the responsibility of the complainant. Furthermore, deteriorated brick work and mortar fall under the express exclusion relied on by the insurer. Determination | Case number: 898276 Page 5 of 8 2.2 Should the claim be resolved by the insurer undertaking the rectification work or by cash settlement? Cash settlement is the most appropriate method of resolution The insurance policy gives the insurer the option as to whether it carries out repairs or whether it pays what it would cost to build or repair an insured home (PDS page 69). The insurer’s discretion to cash settle must be exercised reasonably and fairly. To date the complainant has rejected cash settlement. However, in a recent conversation the complainant has expressed the view it may be preferable to undertake the work herself and avoid ongoing issues with the insurer, even though she will no longer have the benefit of the insurer’s guarantee. In light of my findings as to the maintenance issues, this is the appropriate way to proceed subject to the amount of the cash settlement being fair and reasonable. 2.3 Is the cash settlement offered by the insurer fair and reasonable? No. The insurer’s offer should be increased to a cash settlement of $24,035 which is fair and reasonable Cash settlement of $24,035 is fair and reasonable On 7 November 2022 AM provided an estimate of costings for its scope of works in the sum of $17,719.20. This is an estimate not a quote. The insurer has offered to cash settle based on this amount. The estimate includes review of the drawings prepared by the Plaintiff’s architect and consulting with the insured. The insurer offered the complainant the opportunity to obtain her own quotes but so far as I am aware this has not occurred. There has been no comment on the adequacy of AM’s estimate and it appears to be reasonable. I propose to include a 30% uplift on AM’s estimate due to contingencies and the increase in building costs. This comes to $23,035 . As AM is in part relying on the Complainant’s architect I consider it reasonable to include an amount of $1,000 for supervision by the architect bringing the total cash settlement to $24,035. 2.4 Is the complainant entitled to compensation for non- financial loss? Yes. Due to the delay and poor management of the claim process it is fair the insurer pays the complainant $2,000 in non-financial loss. Compensation for non-financial loss is warranted AFCA Rules may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The reoccurrence of leaking from the 2018 claim was in May 2021. On 23 August 2021 the insurer advised the complainant the rectification claim would not be accepted. On 30 September 2021 the insurer agreed to repair the flashing and waive the excess. In December 2021 the insurer paid the complainant an amount of $1,500 due to its delays. The December 2021 repairs did not follow the architect’s advice and were unsuccessful. After 2 years and numerous expert reports the leaking is still occurring. On 12 August 2022 the insurer Determination | Case number: 898276 Page 6 of 8 apologised to the complainant and offered a further $1,000 compensation but which I understand was not accepted. The complainant has suffered substantial anxiety and inconvenience. She recounts the numerous tradesmen who regularly attended without an adequate ladder. The insurer’s management of the repair process in particular of a heritage property was found wanting. Based on this, I consider it is fair in all the circumstances the insurer pays the complainant $2,000 non-financial loss. This is on top of the $1,500 already paid. 2.5 Why is the outcome fair? The outcome is fair because the cash settlement is reasonable and allows the complainant to have control of the rectification process. Determination | Case number: 898276 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 898276 Page 8 of 8 3.2 Relevant Policy Terms General exclusions Page 62 of PDS You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to: ‒ tiles and their adhesive or grouting breaking down; ‒ weathering of roof tiles or roof ridge capping; ‒ gradual weathering and breakdown of bricks, mortar or concrete . Lifetime guarantee on home repairs

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.