Home / Hollard / Determination 898241
Determination 898241
Roof repair claim handling delay and poor communication
Summary
The complainant's storm-damaged home claim was accepted, but the roof repairs were excluded from the scope of works and the insurer delayed resolving its position and closed the claim during the AFCA complaint. AFCA found the insurer liable for the roof repairs and ordered it to issue contracts covering necessary roof repairs and pay $4,400 non-financial loss.
The insurer accepted the claim without providing a reasonable basis for denial, and its unreasonable delay and poor communication caused further damage and stress, so it must meet the roof repair claim.
Issues
- Poor claim handling primary · upheld
“The insurer has failed in its obligations to the complainant and poorly handled the claims process by taking an unreasonable amount of time to resolve the claim”
- Claim denial secondary · not upheld
“The insurer has not provided any reasonable basis for denying the claim or why any relevant exclusion could be relied upon.”
- Complaint handling failure secondary · upheld
“it has also been indifferent to its dispute resolution obligations to both parties”
- Delay secondary · upheld
“this claim is still not finalised some 12 months after the claim was initially submitted”
- Poor communication secondary · upheld
“failing to properly communicate its position in respect of the claim and failing to provide adequate information in support of its position”
Subjects and remedies
pay non financial lossrepair or rectify
Text of the determination
Determination
Case number 898241
Financial firm Hollard Insurance Partners Limited (insurer)
Determination | Case number: 898241 Page 1 of 5
Case number: 898241 21 March 2023
1 Determination overview
1.1 Complaint
The complainant holds a Home and Contents domestic insurance policy with the insurer. In
early 2022, the property was damaged in a storm. The complainant lodged an insurance
claim on 2 March 2022 and, after assessing the property, the insurer accepted the claim on 2
May 2022 and assigned a builder.
When the complainant received a Scope of Works from the builder which did not include roof
repairs, she queried this with the insurer, but did not receive a response. To date, the insurer
is still assessing its liability for the roof repairs and no repairs have been undertaken.
Unfortunately, due to ongoing weather events, the property has sustained additional damage
as a result of the delays in settling the claim and having the works completed.
1.2 Issues and key findings
Is the insurer liable for the roof repairs?
Yes. The complainant lodged a claim which was accepted by the insurer. The insurer has not
provided any reasonable basis for denying the claim or why any relevant exclusion could be
relied upon. It is therefore liable to meet the entirety of the claim, including any subsequent
damage caused by the insurer’s delays.
Is the complainant entitled to non-financial loss?
Yes. The insurer’s unreasonable delays have caused undue stress and inconvenience to the
complainant.
Why is the outcome fair?
The insurer has been disengaged and indifferent to its obligations toward the complainant.
Having represented it would meet the costs of all the claimed repairs and creating the
impression this would be done, I am satisfied it is fair in the circumstances of this complaint it
be required to make good on that representation.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the date the insurer is advised the complainant has accepted this
determination, it must:
issue new contracts and Scope of Works covering all necessary roof repairs and
rectification, as well as the existing scope and
pay $4,400 to the complainant in non-financial loss.
Determination | Case number: 898241 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer liable for the roof repairs?
Yes. The complainant lodged a claim which was accepted by the insurer. The insurer has not
provided any reasonable basis for denying the claim or why any relevant exclusion could be
relied upon. It is therefore liable to meet the entirety of the claim, including any subsequent
damage caused by the insurer’s delays.
The insurer initially accepted the claim
The insurer appointed the builder to assess the damage and after attending the property on
14 March 2022, the builder advised a roofer was required to assess the cause of the damage.
The roofer’s report, dated 14 April 2022, confirmed maintenance related issues had
contributed to the damage and recommended various maintenance repairs be carried out.
Following receipt of this report, the insured sent the complainant a letter, dated 2 May 2022,
which accepted liability for the claim. An authority for repairs to be carried out was sent to the
builder on 1 June 2022.
The complainant had concerns about the Scope of Works
On 15 July 20 22, a copy of the scope of works and builder’s repair contract was sent to the
complainant to sign and return. The complainant noticed the roof repairs were not included,
and tried to contact the builder directly, as she had been instructed to pay the excess and
liaise directly with the builder.
After being unable to contact the builder, on 19 August 2022, the complainant emailed the
builder and relevantly said:
We are waiting for a new contract that includes in the SOW repair for the exterior
roof damage.
I have tried to call this number several times, only to be advised that your mobile
is switched off.
On 27 October 2022, the builder emailed the complainant and advised:
I have reviewed the file and advise that there are no roof works relating to the
claimed event nor any repairs that would be paid by your insurance company and
therefore no pre-existing roofing maintenance issues can be added to the quote
and all necessary roof repairs will be at your own expense.
The insurer says the claim has been closed
The insurer initially informed the complainant and AFCA it sent the claim acceptance letter
and is awaiting payment of the $1,000 excess and return of contracts from the complainant. It
says accepting the claim has resolved the complaint.
However, the builder advised the insurer on 23 November 2022 it was awaiting the
completion of maintenance by the complainant prior to proceeding with rectification works.
Determination | Case number: 898241 Page 3 of 5
The insurer now says it relied on an incorrect roof report (for a different property) when
accepting the claim and is in the process of making an updated liability determination based
on the correct report. Its claim notes indicate it has been in possession of the correct report
since 2 August 2022.
No further information has been provided to AFCA by the insurer since 7 December 2022,
however the complainant received a text message on 23 February 2023 advising:
Insurance Claim Update: We have not received a response for your claim
[number] and it is now closed. Please contact [insurer] Insurance team on
[number] between 8am – 6pm if we can assist you further.
No further details have been provided.
The insurer has not established its position
Despite requests from AFCA, the insurer has not provided any evidence to show:
the damage to the complainant’s roof was not covered by the policy or
it informed the complainant of the need to conduct maintenance prior to works
commencing.
Accordingly, I find the insurer has failed in its obligations to the complainant and poorly
handled the claims process by:
taking an unreasonable amount of time to resolve the claim
failing to properly communicate its position in respect of the claim and
failing to provide adequate information in support of its position.
The insurer’s delay has more likely than not caused additional dam age
Further, had the insurer properly reviewed the roofer’s report in April 2022 and before the 2
May 2022 acceptance, it would have identified it had the wrong report. Had it done so, and
rectified this error in the following 24 hours, I am satisfied the insurer should have been in a
position to have all the relevant information available to it by 2 May 2022.
Had it done so, and had it communicated its position appropriately, the complainant would
have been aware of what was required of her and taken steps to mitigate the situation.
This opportunity was denied to her:
initially, when the error should have been identified
on 2 May 2022 when the insurer represented it would accept the claim in full
after the insurer obtained the correct report on 2 August 2022, but took no further action
on 23 November 2022 when despite being informed by the builder it was waiting on the
complainant to conduct works, the insurer again failed to appropriately advise the
complainant
on 23 February 2023, when the insurer, without any further notice or information, closed
the claim while the AFCA complaint was still open, despite advising the outcome of any
updated review would be provided.
Given the above, I am satisfied it is fair in all the circumstances for the insurer to be required
to meet the claim, inclusive of works required to rectify the damage to the roof.
Determination | Case number: 898241 Page 4 of 5
2.2 Is the complainant entitled to non-financial loss?
Yes. The insurer’s unreasonable delays have caused undue stress and inconvenience to the
complainant.
The complainant is entitled to non-financial loss
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectation of enj oyment or peace of mind.
In assessing whether to award compensation, AFCA expects the complainant to be
moderately robust, bear the normal degree of inconvenience experienced when a problem
occurs, and take reasonable steps to minimise the inconvenience suffered.
However, despite the text from the insurer to the contrary, this claim is still not finalised some
12 months after the claim was initially submitted and the basis of the insurer’s position
remains unclear. This is an extraordinary amount of time for a claim which, initially, should
have been straightforward to process.
Coupled with the insurer’s indifference to its obligations to act in good faith toward the
complainant and to provide reasonable assistance to AFCA, it has also been indifferent to its
dispute resolution obligations to both parties. This has culminated in its dismissive text
message of 23 February 2023.
I am satisfied this has resulted in the complainant incurring significant stress and
inconvenience. For these reasons, it is fair in all the circumstances to award the complainant
the requested amount of $4,400 non-financial loss.
2.3 Why is the outcome fair?
The insurer has been disengaged and indifferent to its obligations toward the complainant.
Having represented it would meet the costs of all the claimed repairs and creating the
impression this would be done, I am satisfied it is fair in the circumstances of this complaint it
be required to make good on that representation.
The outcome is fair
The insurer has not engaged properly with the AFCA process, or indeed its own internal
dispute resolution obligations. It is fair it pays compensation to the complainant.
Determination | Case number: 898241 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.