Home / Hollard / Determination 898190

Determination 898190

Storm damage claim declined for wear and tear, gradual deterioration and lack of maintenance; delay in providing decision

FirmHollard
Decided2023-03-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed$60,000
SourceAFCA PDF

Summary

Complainants claimed about $60,000 for storm damage to balconies and patio; the insurer declined citing wear and tear and lack of maintenance. AFCA upheld the decline but ordered $1,500 non-financial loss compensation for unreasonable delay in giving a decision.

Expert leak tests showed pre-existing waterproofing failure and gutter neglect excluded by the policy, but the insurer unreasonably delayed its decision after completing assessments.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 898190 Financial firm Hollard Insurance Partners Limited Case number: 898190 24 February 2023 1 Determination overview 1.1 Complaint The complainants hold a home building and contents insurance policy (policy) with the financial firm (insurer). On 1 March 2022, a claim was lodged for damage to the insured property, said to be because of a significant weather event on or about 23 February 2022. The insurer has denied the claim. The insurer says the damage is because of a lack of maintenance (gutters), failed waterproofing to the balconies, gradual deterioration and wear and tear. Damage in these circumstances is excluded under the policy. The complainants believe t he insurer’s decision is unreasonable. Further, that delays caused by the insurer have increased the damage to their property leading to additional loss and stress. 1.2 Issues and key findings Is the insurer’s assessment of its liability under the policy fair? Yes. On the balance of probabilities, the damage is due to wear, tear, gradual deterioration and a lack of maintenance. The damage is not consistent with having occurred because of a recent storm event. Damage caused in such circumstances is excluded under the policy. Are the complainants entitled to non-financial loss compensation? Yes. The insurer did unreasonably delay providing the complainants with a claim decision in May 2022, despite have completed its assessments in March 2022. The insurer is to pay the complainants $1,500 in non-financial loss compensation in line with the AFCA Rules. Why is the outcome fair? On the available information, it is fair that the insurer declines the claim in line with the policy provisions. The damage has occurred gradually over time because of circumstances excluded from cover. However, it is also fair that the insurer pays non-financial loss compensation due to delay caused between the assessments completed by its consultants and the insurer providing the complainants with a decision under the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim. However, the insurer is to pay the complainants $1,500 in non-financial loss compensation within 14 days of receiving notice of their acceptance of this determination. Determination | Case number: 898190 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability fair ? Yes. The information provided by the insurer is more persuasive and establishes the damage to the insured building is not the result of the storm event in February 2022. Rather, it is because of circumstances excluded under the policy. The policy is an insured events contract of insurance There is no dispute the insurer provided the complainants with the relevant policy documentation, including the product disclosure statement (PDS) and certificate of insurance (COI). I accept it is fair that the insurer be allowed to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by the listed insured events, including Storm, specified in the PDS. Cover under these benefits is subject to the limitations, conditions and exclusions also provided in the PDS. The relevant policy provisions have been provided in section 3.2 below. Complainants say insurer is liable for all the damage claimed There is no dispute the insured building presented with damage after the significant rainfall (and associated winds) event in February 2022. The complainants say the exposure to the extreme storm event caused the damage. Further, that delays by the insurer caused the timber structure under the rear balcony to deteriorate resulting in further damage to the patio ceiling below. The complainants have carried out repairs to the balcony and rear patio at a cost of approximately $60,000, which they are seeking reimbursement from the insurer. The complainants say the insurer failed to arrange necessary make safe works and are also seeking compensation for their poor experience under the claim. The insurer says the complainants had already arranged make safe works prior to claim lodgement. The insurer accepts there is evidence of water ingress damage, however, that this damage is not because of the storm event. Rather, the damage is due to long term water ingress/leaking due to a failure of the waterproofing caused by gradual deterioration and wear and tear. The insurer does not accept it is responsible for any delays and/or the alleged additional damage. Consultants have provided conflicting information The complainants arranged for consultants ‘CS’ to attend to inspect the damage found to the rear patio ceiling after the storm. CS says it attended in February 2022 to carry out repairs to the rear balcony and patio area below. However, on assessing the damage, CS recommended the complainants refer the matter to their insurer after which the complainants lodged the claim. CS says it returned to the insured property on 30 May 2022 and found the extent of damage had increased since its previous attendance. CS says due to the delay in completing repairs, the damage had increased to a level where it became a safety issue and required immediate repairs. CS says the deterioration of the balcony underlying support is due to the weather conditions and that the balcony tiles may have been damaged by tree branches during the storm. Determination | Case number: 898190 Page 3 of 8 The insurer appointed plumbing consultants ‘W’ and building consultants ‘CC’. CC attended the insured property on 7 March 2022 and noted the following damage:  minor water staining to the ceiling in the kitchen  minor water bubbling to the wall lining in the lounge room  minor water staining to the ceiling in the office  collapsed external ceiling on the rear patio area CC concluded that the damage was due to a combination of overflowing gutters, failed balcony waterproofing and gradual deterioration over time. CC noted:  severe rot, deterioration and wear and tear to the rear balcony tiles, sub-floor and which extends to the rear patio ceiling  the kitchen and office are each located below a balcony. CC says the complainants are required to arrange the following maintenance work:  remove and replace all the balcony tiles and replace the faulty membrane  seal all door frames  flashings to top balcony perimeter  increase drainage line to front balcony next to roof tiles. CC arranged for W to complete leak detection investigations, which it completed and provided a report dated 12 March 2022. W completed various flood and spray tests which provided the below results:  Flood test balcony rear- Fail.  Flood test balcony top - Fail.  Flood test balcony front- Fail.  Spray test door frame rear - Fail.  Spray test door frame top - Fail.  Spray test flashing top - Fail. W, regarding the condition of the property and cause of the leaks, provides the below opinions:  all balconies are in ageing and average condition  there were cracks and evidence of movement throughout the property  all balconies had pre-existing maintenance issues relating to age, wear, tear, expansion and contraction over time  all leak detection tests conducted at the property failed (including balconies and door frames)  water ingress and observed damages were a result of membrane failure to the front, rear and top balconies  ongoing water ingress and failed waterproofing membrane caused damage to the rear patio lining and its subsequent partial collapse  overflow of gutters at front of the property due to restricted flow to down pipes and build-up of debris in the gutters. Information from the insurer is more persuasive It is clear from the leak detection test results that the waterproofing on all balconies at the property had pre-existing issues with waterproofing, consistent with age and gradual deterioration. I acknowledge CS’s reference to possible impact damage from nearby tree branches, however there is no supporting information to show this to be the case including an absence of any evidence of impact damage. Determination | Case number: 898190 Page 4 of 8 Similarly, I acknowledge CS’s opinion that the timber rot and deterioration noted to the rear balcony sub-floor structure and below patio ceiling sheets occurred because of delays after the storm event. However, I am not persuaded in the absence of supporting information from CS in this regard. The reports from W and CC, including compelling photos, show this damage consistent with ongoing water leakage issues over an extended period of time. I accept this information shows the damage had been occurring from before the storm event. I find the information from W and CC to be the more persuasive and which shows the damage to the rear balcony, below patio and associated repairs all relate to a failure of the balcony’s waterproofing due to age and wear and tear. Similarly, the water ingress damage to the kitchen and office is due to failed waterproofing of the balconies above these areas. The staining/bubbling of paintwork above the lounge room door is consistent with water ingress caused by overflowing of the gutters above. The available information indicates the gutters had not been maintained with a build-up of debris. This build-up of debris has impacted on the flow of water as well as restricted water drainage through the down pipe. I accept, on balance, this arises from a lack of maintenance. I acknowledge the co mplainants’ position that the gutters are maintained annually. However, the complainants have not provided any information in support of this position. Further, the degree of debris noted at the time of the assessments, does not assist the complainants’ position. No persuasive information to show additional damage due to delays The complainants claim the insurer’s poor management of the claim, failure to arrange make safe works and associated delays have increased the extent of damage and therefore the cost of repairs. I am not of the same opinion and note CS had already completed make safe works to the rear balcony/patio area prior to claim lodgement. Further, I am satisfied the insurer is entitled to investigate a claim to determine its liability, if any, under a claim. It is not reasonable to expect an insurer to authorise repairs until such time that it has completed its investigation. I accept, and will discuss in more detail in section 2.2, that the insurer did contribute to some delays. However, I am not satisfied that the insurer’s limited contribution to delays has shown to have caused and/or contributed to the damage and associated cost of repairs. This is because, given the expert reports, the damage in question has correctly been shown to have pre- existed the storm in February 2022. Further, that the damage was significant and on balance needed major repairs regardless of the time it took the insurer to assess the loss. I accept the complainants may not have aware of the long term ongoing water ingress damage until such time parts of the patio ceiling collapsed. However, this does not alter the fact the damage was present and had been occurring gradually over an extended period of time. The policy does not provide for an exception to the relevant exclusions based on the complainants’ awareness of the damage. Insurer is entitled to decline the claim I am satisfied the policy does not cover loss or damage that relates to or arises from gradual deterioration, lack of maintenance and wear and tear. Given the available information, I accept it is fair in the circumstances that the insurer be allowed to decline the claim in line with the policy exclusions. Determination | Case number: 898190 Page 5 of 8 2.2 Are the complainants entitled to compensation? Yes. The insurer is to pay the complainants $1,500 in non-financial loss compensation in line with the AFCA Rules. Insurer to pay the complainants $1,500 in non-financial loss compensation The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The complainants claim:  the insurer delayed the claim decision  the insurer’s builder did not inspect the property sooner  the insurer’s representative who came to inspect left the property without notifying them  the insurer did not complete make-safe works  the builder’s report contains inaccurate information  the insurer did not provide regular updates about the claim progress. I appreciate the complainant s feel the insurer’s management of the claim was poor. However, the available information shows the insurer arranged for and completed assessments at the insured property within a week of claim lodgement. The complainants say the attending assessor from CC did not discuss the issues with them, did not meet them and left without informing them. The insurer disputes this and notes CC’s report includes details of conversations with occupants of the property, which the complainants say is false. I am not in a position to accept or reject either of the parties’ positions , however, I do note several photos show CC’s representative was accompanied by someone from the insured property during the assessment. I do accept however that the insurer did delay providing the complainants with a decision on the claim. This is because the insurer’s assessments of the insured property were completed in the first half of March 2022, but a decision on the claim was not provided until May 2022. I have not been provided with any reasonable cause for this delay. I note the insurer’s position that it has four months to provide a claim decision, in line with the General Insurance Code of Practice (GICOP). I accept the GICOP refers to a four month period, however, in my view this exists to allow an insurer to assess, investigate and gather all the information it may need to assess its liability under a claim. I do not accept it is intended to allow an insurer to delay providing a decision on claim for four months in circumstances where it already has all the information it needs to provide a decision. In this instance, I accept the insurer has caused unreasonable delay in provided a claim decision and information shows the complainants had to reach out requesting updates. As discussed above, I do not accept this delay caused or contributed to the damage, however, I do agree the delay will have caused the complainants an undue level of stress and anxiety. Therefore, in line with the AFCA Rules, the insurer is to pay the complainants $1,500 in non- financial loss compensation. This is to be paid within 14 days of the insurer receiving notice of the complainants’ acceptance of thi s determination. Determination | Case number: 898190 Page 6 of 8 2.3 Why is the outcome fair? Given the available information, it is fair that the insurer be allowed to rely on the policy provisions to decline cover for damage that has been shown to be excluded. However, it is also fair that the insurer pays non-financial loss compensation. This is because of the unreasonable delay caused between the assessments completed by its consultants and the insurer providing the complainants with a decision under the claim. Determination | Case number: 898190 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions Storm What is covered Your building and/contents are covered for loss or damage caused by storm. What is not covered There is no cover under this insured event for: ...  damaged caused: Determination | Case number: 898190 Page 8 of 8 o when rain, hail, wind or snow enters the building unless the entry point was created by the storm. ... …… General exclusions apply to all sections of the policy except for Domestic Workers Compensation cover. Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: .... 4. wear and tear, rust, corrosion and/or deterioration (except in some instances relating to ‘Sudden escape of liquid’ and ‘legal liability’ claims), but we will only apply this exclusion if the loss or damage is directly caused by one or more of these factors. 5. You not maintaining your building and/or contents in reasonably good repair and condition

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.