Insurer declined driveway damage from escape of liquid claim and offered cash settlement for the accepted damage
Text of the determination
Determination
Case number 895285
Financial firm AAI Limited
Determination | Case number: 895285 Page 1 of 8
Case number: 895285 8 November 2023
1 Determination overview
1.1 Complaint
The complainant holds home building insurance with the financial firm (insurer). On 28 March
2022, he lodged a claim for external damage to the home caused by a burst water pipe.
The insurer partially accepted the escape of liquid (EOL) claim. After deducting the $1,500
policy excess, it has offered the complainant $1,410.60 to cash settle the cost to repair the
brickwork, rendering and concrete path around the burst pipe. However, the insurer has
declined to cover damage to the driveway, saying it was pre-existing and not due to the EOL.
The complainant says the EOL caused all the claimed damage. He also says that the
insurer’s cash settlement offer is inadequate. The complainant wants the insurer to accept all
the damage and to attend to repairs. He is als o dissatisfied with the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer required to cover more of the damage?
No. On balance, the proximate (dominant) cause of the driveway damage was not the EOL.
Rather, the proximate cause was pre-existing construction issues.
Is reasonable that the insurer cash settles the claim?
No. The damage the insurer has accepted may be repaired as it is in a discrete area, away
from the driveway. It has a current scope of works (SOW) and quote for the claim related
repairs so is in a position to attend to them.
Is non-financial loss compensation payable?
Yes . The insurer’s poor communication caused the comp lainant stress and frustration. It is
required to pay him $1,000 in non-financial loss compensation.
Why is the outcome fair?
As it has not been shown that the driveway damage was a claimable EOL loss, it would be
unfair to require the insurer to cover that damage. However, it is fair that the insurer attends
to the claim related repairs and pays compensation for the stress it has caused.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of receiving written notice the complainant has accepted this determination,
the insurer is required to:
appoint AR to as soon as is reasonably possible attend to the repairs set out in AR’s SOW
dated 12 October 2023 (subject to payment of the excess)
pay the complainant $1,000 in non-financial loss compensation.
Determination | Case number: 895285 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer required to cover more of the damage?
No. On balance, the driveway damage was not due to the EOL. Rather, it was pre-existing
and the result of poor sub-base preparation.
Complainant must show a claimable loss under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to his home caused by a listed insured event. Those
events include ‘Escape of Liquid’.
On 28 March 2022, the complainant lodged a claim with the insurer. He said outside elements
of his home had been damaged by water from a burst pipe, discovered on 19 March 2022.
The insurer accepts that the damage to the brickwork, rendering and concrete path around
the burst pipe is consistent with the claimed event. To that extent, it is not in dispute a
claimable loss has been shown. However, the insurer says the damage to the driveway was
not caused by the EOL event.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
In a claim under a general insurance policy, the te rm ‘proximate cause’ is used to describe
whether an event is the cause of the loss or damage. The proximate cause is the dominant,
effective or operative cause. It does not have to be the first, the last or the only cause.
Insurer says driveway damage is not covered
The insurer appointed builder AR to assist it with assessing the claim. AR inspected the
property on 30 March 2022, and reported:
t he insurer’s plumber had identified a fracture in a 20mm copper pipe forming part of the
home’s water service . The pipe had been repaired
the fracture had allowed water to permeate through the subsoils of the front elevation of
the home unnoticed
the pipe should be lagged to prevent further fractures
no leaks were detected on testing
CCTV inspection of the below ground stormwater and sewerage systems did not reveal
any breaks, blockages or leaks
the damage to a section of brickwork, rendering and the concrete path was consistent with
having been caused by an EOL
there were several cracks to the driveway and the cracking continues throughout the side
yard. AR considered the cracks to be unrelated to the EOL.
The insurer also relies on a report dated 12 April 2023 by engineer MC. After inspecting the
home on 27 March 2023, MC said:
the home’s south -west corner brickwork had been removed to gain access to the wall
cavity for repair of the copper pipe
Determination | Case number: 895285 Page 3 of 8
the rendered brickwork had incurred hairline cracking along the brickwork damp proofing
course where the damp proofing had not been exposed (as it should be) and had been
covered by the rendered finish
the external render brickwork angle had delaminated and detached from the external
brickwork due to poor adhesion and this had been exacerbated by the removal of
brickwork to access the copper pipe
the concrete pavement butted up against the brickwork, without an expansion joint
the concrete pavement had subsided by about 15mm to the west side of the home and
about 20mm to the south side. There was subsidence remote from the leak location
the concrete pavement had cracked immediately around the leak area, consistent with
concrete settlement issues
the crack extending diagonally from the south-west corner of the home can be seen in
Google Streetview images from July 2019
the south side concrete driveway is generally cracked throughout, extending towards the
rear south-west garage, remote from the leak location
the widespread nature of the cracking and subsidence indicates the proximate cause of
the subsidence of the paving subbase and resultant cracking was pre-existing preparation
and construction issues
the subsidence and cracking were not a result of the leak but was a pre-existing problem.
MC provided a further report dated 17 October 2023, following review of the report dated 14
September 2 023 by the complainant’s building assessor F7 (discussed below). MC
maintained the conclusions set out in its first report. MC also said F7 had:
provided an image that showed the subsided subbase which supported MC’s opinion the
subsidence was due to poor compaction, and did not show evidence of being washed
away or eroded
made the contradictory comment that the soil had been washed away but the concrete had
heaved
acknowledged there was pre-existing driveway cracking. While F7 said further cracking
had developed, MC considered that was to be expected given the pre-existing issues
acknowledged that additional cracking to the concrete pavement at the backyard was not
due to an insured event, but did identify the operative cause of the cracking and damage
outlined that render and brickwork had been damaged in the repair of the damaged pipe.
MC ‘generally agrees that localised brickwork and render was reasonably damaged to
repair the pipe’.
Based on the reports from AR and MC, the insurer says that the complainant has not
established that the driveway damage was proximately caused by the EOL. Rather, that
damage was pre-existing and due to construction defects.
The insurer also says it is not liable for the cost to repair the leaking pipe as PDS confirms on
page 47 that the EOL insured event does not cover:
The cost of repairing or replacing the item from which the liquid escaped eg a
cracked pipe or leaking tap
Complainant ’s experts disagree with the insurer’s experts
The complainant maintains that the insurer is liable for all the damage claimed.
He arranged for builder AM to inspect the home on 24 May 2022. Based on a visual
inspection, AM said the following was most likely the result of EOL from the burst pipe:
Determination | Case number: 895285 Page 4 of 8
damage to external brickwork (front of house)
cracked and bulging render (front of house)
cracks to concrete driveway, which had lifted
cracks in concrete along right side of the house.
In addition, the complainant has provided a report dated 24 November 2022 by IB, building
inspector. IB has concluded:
In my opinion based on the findings on site at the time of inspection and the letter
from [the complainant’s plumber] confirming the water leak could have been
leaking for quite some time.
The cause of water leaking from the copper pipe has caused the soil to become
saturated over time.
IB said that the leak had contributed to the following damage:
landscaping [astroturf adjacent to the driveway] dropping and becoming uneven
water pooling due to ground being wet underneath
concrete paving to drop by approximately 40mm and fall towards the house.
The complainant also relies on F7’s report dated 14 September 2023. F7 said:
the driveway was sinking due to large amounts of water saturating the soil below. The soil
had washed away and left a hollow pocket of up to 5cm in locations, causing the concrete
to sink (F7 also said the driveway gate was not working properly due to concrete heave)
while there were pre-existing cracks affecting the driveway, further cracking had occurred
‘There are cracks which do not relate to the insurable event further in the backyard and at
the front of the driveway…’. In preparing a SOW for claim related repairs, F7 had not
included those cracks
the render and brickwork had been damaged during the repair of the leaking pipe
it quoted $13,685.50 based on its SOW for repair of claim related damage. That included a
19% builder’s margin .
He has raised concerns about MC ’s findings. He says:
MC overlooked the sagging of concrete around where the pipe burst
his plumber advised there was a cavity under the concrete where the water had eroded the
soil, causing the concrete to drop and crack. The plumber suggested there had been a
leak for some time then the September 2021 earthquake severely damaged the pipe. MC
did not consider these issues
MC ‘ only looked at the issues from a cosmetic viewpoint. He didn ’ t look at anything from a
technical point, whereas the other 2 building experts that came out did ’.
The complainant says the insurer should accept all the damage claimed and attend to repairs.
Insurer is not required to cover more of the damage
Based on the exchanged information, I am not satisfied that the complainant has shown on
the balance of probabilities that the driveway damage is due to the EOL. Rather, it is more
likely than not the driveway damage and its causes were pre-existing. This is because:
I find the reports of MC persuasive. They contain detailed analysis and structured
reasoning, supported by historical and current imagery
Determination | Case number: 895285 Page 5 of 8
MC has provided specific responses to the findings of the complainant’s primary expert,
F7. In contrast, the complainant’s experts have not provided detailed commentary on MC’s
findings other than F7 agreeing that there were cracks present in July 2019
in preparing its first report MC took into consideration IB’s report
I do not agree with the comp lainant’s criticisms of MC. To the contrary, I am satisfied that
MC specifically considered the sagging concrete and the soil subsidence cavity. Further,
MC’s reports contain detailed technical analysis
AM’s single page report does not provide any reasonin g for the conclusions reached
the reports of IB and F7 also contain less reasoning in support of their conclusions than
those of MC.
On balance, I am not satisfied the proximate cause of the driveway damage was the EOL.
Rather, the proximate cause was pre-existing construction issues (poor sub-base
preparation). Further, the cost to repair to leaking pipe is excluded under the policy terms.
I acknowledge that the complainant considers that the leak had been occurring over time and
worsened after the September 2021 earthquake, so the driveway damage should be covered.
However, even if I was satisfied the driveway was damaged by EOL, that would not assist the
complainant because the EOL insured event does not cover damage due to:
earth subsidence unless it occurred within 72 hours of, and directly because of, an EOL
gradual process of leaking.
The insurer is therefore not required to cover more damage than it previously accepted.
2.2 Is reasonable that the insurer cash settles the claim?
No. The damage the insurer has accepted may be repaired as it is in a discrete area, away
from the driveway. It has a current SOW and quote for the claim related repairs so is in a
position to attend to them.
Insurer has offered a cash settlement
On 7 April 2022, AR provided a SOW for repair of the damaged section of brickwork,
rendering and the concrete path. It quoted $2,365.55. That included a 15% builder’s margin.
As most of the damage was not accepted as covered, the insurer offered to cash settle the
claim for AR’s quoted amount, less the applicable $1,500 policy excess ($865.55).
In October 2023, the insurer asked AR to update its quote to refl ect current prices. AR’s quote
dated 12 October 2023 amounts to $2,910.60.
On 17 October 2023, the insurer increased its cash settlement offer to $1,410.60 ($2,910.60
less $1,500).
Complainant wants the insurer to attend to repairs
The complainant’s preference is that the insurer attend to repairs.
He says the insurer’s offer is inadequate and that if h e were to accept it, he would be left out
of pocket in repairing the damage. He submits that if the insurer considers the claim related
repairs can be completed for the amount AR has quoted, it should attend to those repairs.
PDS describes how building claims are to be settled
Pages 74 of the PDS includes the following information:
Determination | Case number: 895285 Page 6 of 8
How we settle building claims
We will aim to use a member of our supplier network to repair or rebuild the
damage to the building. Sometimes, this is not always possible e.g. if there is pre-
existing damage. This will determine how the building claim will be settled.
When a me mber from our supplier network can complete the repair or
rebuild
When your claim for loss or damage to the building is covered, we will engage a
builder from our supplier network to prepare a scope of works and provide a quote
on the cost to repair or rebuild the building on a ‘new for old’ basis…
The PDS states on page 75 that, once it has assessed the quote, it will offer the insured the
choice of having the builder attend to the work or be paid the amount of the assessed quote.
Page 75 of the PDS also states:
When a me mber of our supplier network is unable to complete the repair or
rebuild and you have a building sum insured
When your claim for loss or damage to the building is covered and a member of
our supplier network is unable to complete the repair or rebuild, we will ask you to
engage a builder to provide a scope of works and provide a quote on the cost to
repair or rebuild the building on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be
assessed ….
If the quote is appropriate and reasonable for the scope of works, we will then pay
you the assessed amount. If it is not, the quote may be adjusted.
Insurer is to attend to claim related repairs
AR’s SOW aligns with the claim related damage, and its quote has been updated to reflect
current prices as at mid October 2023.
There is nothing before me that confirms that AR says it cannot complete the claim related
repairs. I also note that the damage the insurer has accepted as covered is in a discrete area,
away from the driveway. This means the claim related repairs should be able to be attended
to, despite the driveway damage.
I also note that the insurer has not offered the complainant a cash settlement based on an
adjusted SOW/quote he has provided.
In the circumstances, I am not satisfied that it is reasonable for the insurer to cash settle the
claim. It is required to appoint AR to as soon as is reasonably possible attend to the claim
related repairs as set out in AR’s SOW dated 12 October 2023, subject to payment of the
policy excess.
Determination | Case number: 895285 Page 7 of 8
2.3 Is non-financial loss compensation payable?
Yes. The insurer’s poor communication cau sed the complainant stress and frustration. It is
required to pay him $1,000 in non-financial loss compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
( capped at $5,400 per claim) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has caused stress and inconvenience
The insurer has acknowledged that it at times communicated poorly with the complainant. In
particular, it has apologised to him for letters it sent on 1 and 6 July 2022 that indicated the
claim was denied. Those letters were sent after the insurer had offered a cash settlement.
I am satisfied that the insurer’s letters dated 1 and 6 July 2022 would have caused the
complainant stress and frustration. Having reviewed the insurer’s claim notes and
correspondence, I also consider that there were other occasions where the insurer should
have communicated in a clearer fashion.
In the circumstances, I am satisfied that it is reasonable to require the insurer to pay $1,000 in
non-financial loss compensation.
2.4 Why is the outcome fair?
As it has not been shown that the driveway damage was a claimable EOL loss, it would be
unfair to require the insurer to cover that damage. However, it is fair that the insurer attends
to the claim related repairs and pays compensation for the stress it has caused.
Determination | Case number: 895285 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.