Home / IAG / Determination 895140

Determination 895140

Dispute over the cash settlement amount for storm damage repairs, total loss claim and poor claim handling

FirmIAG
Decided2023-08-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$5,400
Amount claimed$354,000
SourceAFCA PDF

Summary

After a storm damaged their home, the complainants disputed the insurer's cash settlement offer and sought payment of the full building sum insured as a total loss. AFCA decided the complaint in favour of the complainants, requiring a new scope of works and quote with a 20% uplift to be cash settled, plus $5,400 non-financial loss compensation.

The insurer's cash settlement was not based on an adequate scope of works and a retail-actionable quote, and total loss was not shown, so a fresh scope and quote were required, with compensation for poor claim handling and delay.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claimrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 895140 Financial firm Insurance Australia Limited Determination | Case number: 895140 Page 1 of 6 Case number: 895140 22 August 2023 1 Determination overview 1.1 Complaint The complainants hold home building and contents insurance with the financial firm (insurer). They lodged a claim after a storm event on 5 December 2020 damaged their home. The parties disagreed on the extent of claim related repairs. The complainants lodged a complaint with AFCA. In April 2022, AFCA issued a recommendation which the parties accepted. The insurer was to cover more of the damage, obtain an updated scope of works (SOW) and quote, and pay a cash settlement including a 15% contingencies uplift. The complainants have lodged another complaint with AFCA. They are dissatisfied with the insurer’s cash settlement offer. They note the amount offered is less than the offer the insurer made which led them to make the first AFCA complaint, despite AFCA’s finding the insurer was liable for additional items it had previously declined to cover. The complainants say that due to the insurer’s inadequate make safe repairs and insufficient cash settlement offers, their home has deteriorated to the point where it is now a total loss. They want the insurer to pay them the building sum insured and seek compensation for the considerable stress and inconvenience the insurer’s poor claim handling has caused them . 1.2 Issues and key findings Are investigations still required to enable cash settlement? Yes. The insurer is to obtain from a builder not previously involved in the claim an actionable retail quote based on a new SOW by engineer CF encompassing the claim related repairs and the additional damage due to inadequate make safe work. A 20% uplift is to be applied. Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have ca used the complainants major stress and inconvenience. It is to pay them $5,400 in non-financial loss compensation. Why is the outcome fair? The insurer’s cash settleme nt offer is not based on a SOW that adequately accounts for all repairs for which the insurer is liable and a quote actionable by a retail customer. It is fair that the insurer obtains a fresh SOW/quote and pays compensation for the major stress it caused. 1.3 Determination This determination is in favour of the complainants. If the complainants provide written notice they accept this determination (notice), the following steps are to be taken:  the insurer is to cash settle the claim related building repairs in accordance with section 2.1 of this determination, and  within 14 days of the notice, the insurer is to pay the complainants $5,400 in total as non- financial loss compensation. Determination | Case number: 895140 Page 2 of 6 2 Reasons for determination 2.1 Are investigations still required to enable cash settlement? Yes. The insurer is to obtain from a builder not previously involved in the claim an actionable retail quote based on a new SOW by engineer CF encompassing the claim related repairs and the additional damage due to inadequate make safe work. A 20% uplift is to be applied. Insurer has made cash settlement offers Prior to AFCA issuing its recommendation in the first AFCA complaint, the insurer had offered the complainants a cash settlement of $142,747.36. That figure comprised of the amount builder JL had quoted on 5 October 2021 ($129,770.30) based on engineer CF’s claim related repairs SOW dated 2 February 2021, plus a 10% contingencies uplift. The April 2022 AFCA recommendation accepted by the parties required the insurer to:  organise additional make safe repairs to secure areas of the home exposed to the elements due to inadequate make safe work undertaken by the insurer’s builder MA  obtain from CF an updated SOW including the following damage the insurer had previously denied (as well as any other additional claim related damage observed): > front veranda decking and all but three of its posts > damaged timber flooring > water damaged internal ceiling or wall linings not previously accepted > ceiling roof frame > southern side cladding > damaged gutters  obtain from JL an updated quote based on CF’s updated SOW  pay the updated quote amount plus a 15% contingencies uplift  reimburse the complainant the cost of quantity surveyor WS ’s report, upon provision of a supporting invoice. On 9 June 2022, CF provided a report and updated SOW, following reinspection of the property on 20 May 2022. CF:  allowed for installation of new wall and ceiling linings in the kitchen, lounge room, dinin g room and laundry, as the linings in those rooms had been removed  allowed for removal and replacement of the laundry floor tiles given the floor had been exposed to the elements for more than 12 months and was now displaying cracking  allowed for replacement of the kitchen flooring as the timber was displaying water related damage and moss growth consistent with prolonged exposure to the elements  allowed for heat resistant refinishing of the combustion fire and flue guard as they showed corrosion and weathering due to exposure to the elements over an extended period  allowed for replacement and painting of a section of the Southern wall fibre cement cladding that had been damaged during prior make safe repairs  allowed for replacement of the decking to the Northern and Western elevation veranda  allowed for replacement of five veranda roof support posts  allowed for insulation of external walls  allowed $900 as a provisional amount for a structural engineer’s strip and pad footing design, as the full extent of the works involved cannot be estimated until works commence  said there was a high probability that asbestos containing materials were present, so the builder would need to arrange demolition and disposal by a fully licensed contractor Determination | Case number: 895140 Page 3 of 6  noted upgrades to the roof are required to ensure the building meets Bushfire Attack Level (BAL) 12.5 requirements. On 24 June 2022 , JL provided its updated quote, based on CF’s SOW dated 9 June 2022. JL’s estimated repair costs at $108,846.10. JL noted that ‘a large proportion of the items indicated to be demolished have already been removed during the make safe’. The insurer says that consistent with the AFCA recommendation, it is entitled to limit its liability to $125,173.02 ($108,846.10 plus a 15% uplift). However, it has reinstated its previous $142,747.36 cash settlement offer. On 6 December 2022, the insurer informed AFCA that it was seeking further clarification from JL on the reason for the reduction in the quoted repair costs. However, no further information has been provided. The copy of JL’s quote provided to AFCA has had details of quantity, units, rates and mark up percentages redacted. Complainant sa ys insurer’s offer is insufficient The complainants say the insurer’s assessment of its liability at $125,173.02 and offer to cash settle the claim for $142,747.36 are both insufficient They submit that:  as no demolition work has been done since JL prepared its first quote, its suggestion that the reduction in repair costs reflected in its second quote is due to removal/demolition of items during make safe works is incorrect  JL has failed to allow for asbestos removal despite CF saying that was likely necessary  JL has likely utilised discounted insurance rates, rather than rates a builder would charge a retail customer  the cost of building materials and labour have markedly increased since 24 June 2022  the additional make safe repair to the roof was unsuccessful, meaning the property has continued to be exposed to the elements and has continued to deteriorate. The complainants seek for their home to be deemed a total loss, such that the insurer should pay them the $354,000 building sum insured. They say that is the only fair solution in circumstances where:  the insurer wrote to them in December 2021, deleting the home and contents cover from their farm insurance policy ‘ owing to the current condition of the house, considered unrestorable as a result of a cyclone damage 05/12/2020 ’  in its report dated 27 November 2021, WS said ‘The inadequate making safe and the subsequent neglect of the house during the 12 month delay have caused the house to deteriorate so badly, that it may now well have passed it expiry date’  as at 21 November 2022, ‘ It has been another 12 months since this report and another 850mm of rain with the property still only secured with a tarp that’s not completely water tight and no roof on the verandah to protect further damage’. Building has not yet been shown to be a total loss Based on the provided information, the panel is not satisfied that it has yet been shown that the cost to repair the home will exceed the $354,000 sum insured. There are currently no quotes indicating that to be the case. Insurer must take further steps before paying a cash settlement A cash settlement must be based on an SOW that adequately encompasses claim related repairs and a reasonable quote for repairs, actionable by a retail customer. An uplift is then to Determination | Case number: 895140 Page 4 of 6 be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. Based on the provided information, the panel is not satisfied that the insurer’s assessment of its liability at $125,173.02 and offer to cash settle the claim for $142,747.36 are reasonable. This is because:  while CF’s SOW dated 9 June 2022 may have adequately encompassed necessary repairs at the time, the complainants ’ photos show the additional make safe work was not successful meaning further deterioration will have occurred due to ongoing exposure  JL’s quote dated 24 June 2022 makes no allowance for asbestos removal, BAL requirements or foundation works despite CF’s comments on those items  JL’s quote is more than 12 months old meaning it will not reflect curre nt prices  the redaction of relevant information means that it cannot be considered as actionable by a retail customer such as the complainants. The panel is mindful that the claim event occurred more than 2.5 years ago. The panel is satisfied that it is in the best interests of the parties to resolve the matters between them as soon as is reasonably possible. In the circumstances, if the complainants provide written notice they accept this determination (notice), the insurer is to take the following steps:  within 14 days of receiving the notice, engage CF to prepare a new SOW that adequately encompasses necessary repairs, including as a result of continuing exposure to the elements (such as mould, weathering, corrosion and foundation movement since the claim event). The insurer is to provide CF with a copy of this determination beforehand  within 14 days of receiving CF’s updated SOW, provide a copy of it to the complainants and engage a builder not previously involved in the claim to prepare based on the SOW a quote for the required repairs reflecting current retail prices. The quote is to include amounts for inspection and remediation of asbestos, BAL requirements and foundation works  within 14 days of receiving the quote, provide the complainants with a copy of it and pay them the quoted amount plus a 20% contingencies uplift (noting the concerns about whether the property can in fact be restored), but subject to the $354,000 sum insured not being exceeded. On 21 November 2022, the complainants told AFCA they had provided the insurer with a copy of WS’s invoice , but the insurer had not reimbursed them. If the insurer has received the invoice but is still yet to pay the reimbursement, it must do so within 14 days of the notice and pay interest pursuant to section 57 of the Insurance Contracts Act, 1984, Cth from 28 days after it received the invoice until the date payment is made. 2.2 Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have caused the complainants major stress and inconvenience. It is to pay them $5,400 in non-financial loss compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions ha ve caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of en joyment or peace of mind. Determination | Case number: 895140 Page 5 of 6 Insurer has caused further stress and inconvenience The complainants say that the insurer’s poor claim handling and delays has been exhausting for them and extremely stressful. They submit that: We are unable to move on emotionally and physically as due to ongoing refusals from [the insurer] to provide a fair settlement. This has meant that we cannot even clean up the site and we have had to watch our family home deteriorate in front of our eyes, this has been extremely destressing to the entire family. It is clear the insurer has handled the claim poorly and has caused extensive delays. It’s attempts at make safe repairs have been inadequate and have left the property unprotected from the elements, leading to its continuing deterioration. The insurer has left them with a badly damaged home which it refuses to insure. The complainants have been forced to approach AFCA twice in an effort to get a fair resolution of their claim. The panel accepts that the complainants have experienced significant stress and inconvenience due to the insurer’s actions. The insurer is required to pay them $5,400 (in total) in non-financial loss compensation 2.3 Why is the outcome fair? The insurer’s cash settlement offer is not based on a SOW that adequate ly accounts for all repairs for which the insurer is liable and a quote actionable by a retail customer. It is fair that the insurer obtains a fresh SOW/quote and pays compensation for the major stress it caused. Determination | Case number: 895140 Page 6 of 6 3 Supporting information 3.1 The AFCA process A FCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.