Home / Hollard / Determination 894761
Determination 894761
Dispute over settlement amount for storm damage repairs (insurer's builder quote vs complainants' quote) and non-financial loss
Summary
The insurer accepted a storm damage claim and offered $39,333.61 based on its builder's quote, while the complainants sought $73,928.80 based on their builder's quote. AFCA found the insurer could rely on its quote, with a 15% uplift if cash settled and matching materials where available, and ordered $500 for non-financial loss.
The insurer's builder's quote was reasonable and the policy requires like-for-like materials where available, with a 15% contingency uplift for cash settlement, while claims handling warranted $500 compensation.
Issues
- Claim amount dispute primary · not upheld
“insurer is entitled to rely on BB's quote as the basis for its settlement offer; no persuasive evidence it is unreasonable”
- Poor claim handling secondary · upheld
“insurer's handling of the claim unreasonably caused a degree of inconvenience; change of messaging during phone call not handled well”
- Delay secondary · upheld
“The insurer accepts there were claim delays and has offered to waive the policy excess of $500”
- Product terms interpretation secondary · upheld
“policy means the same materials must be used where it is possible to do so”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 894761
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 894761 Page 2 of 6
Case number: 894761 6 April 2023
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy, underwritten by the financial
firm (insurer). They lodged a claim for damage to their property following a storm event.
The insurer accepted the claim and offered to pay $39,333.61 for the building repairs. This
offer is based on a quote from its builder, BB.
The complainants dispute the insurer’s settlement offer as they believe the amount offered is
inadequate. They obtained a repair quote from their preferred local builder (IT). The
complainants seek settleme nt based on IT’s quote for $73,928.80 . They also seek
compensation for non- financial loss, due to the insurer’s handling of the matter.
1.2 Issues and key findings
How is the matter to be settled?
Within the parameters outlined for matching materials in section 2.2, the insurer is entitled to
rely on BB’s quote as the basis for its settlement offer. The complainants may choose to have
the repairs conducted by BB, or to accept a cash settlement based on BB’s quote. If the
complainants choose the latter option, the insurer must include a contingency uplift of 15%
over and above the quoted amount of $39,333.61.
Is the insurer required to increase its compensation offer?
Yes. The insurer ’s handling of the claim unreasonably caused a degree of inconvenience for
the complainants. It is required to pay them $500 compensation for non-financial loss.
Why is the outcome fair?
There is no persuasive evidence to show BB’s repair quote is unreasonable or unfair. BB can
conduct the repairs with the insurer overseeing this work, or the complainants can choose to
accept a cash settlement based on the BB quote. If they choose the cash settlement, it is fair
that the insurer includes a 15% contingency uplift. It is also fair the insurer pays $500 non-
financial loss compensation to the complainants in recognition of their claims experience.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer is entitled to resolve the claim based on the BB quote. This is subject to the
parameters outlined for matching materials in section 2.2 of this determination.
The complainants may choose whether to permit BB to conduct the repairs or to accept a
cash settlement. A cash settlement is to include a 15% contingency uplift. There is no need to
pay interest.
The insurer is also required to pay $500 compensation for non-financial loss.
Determination | Case number: 894761 Page 3 of 6
2 Reasons for determination
2.1 How is the matter to be settled?
Within the parameters outlined for matching materials in section 2.2, the insurer is entitled to
rely on BB’s quote as the basis for its settlement offer. The complainants may choose to have
the repairs conducted by BB, or to accept a cash settlement based on BB’s quote. If the
complainants choose the latter option, the insurer must include a contingency uplift of 15%
over and above the quoted amount of $39,333.61.
Insurer agrees to cover the claimed damage
There is no dispute:
the complainants’ property suffered water damage following a storm event
damage sustained in the event is covered by the policy, and
the extent of this damage is agreed by the parties.
The complainants raised concerns about the materials allowed for in BB’s quote and the
settlement amount offered. They say the proposed cash settlement is inadequate and the IT
quote should be preferred in the circumstances.
Insurer is entitled to rely on its builder’s quote as a basis for settlement
Both the complainants and the insurer had experts prepare quotes to address the claimed
damage. The two experts each provided three quotes to address the damage. I have limited
my review to the most recent of these for each of them.
The complainants engaged local builder IT to provide a repair quote. IT quoted $73,928.80.
Some of the quoted figures in this quote appear to be rounded, rather than exact. Only the
floorboards quote ($32,054.93) has an exact dollars and cents amount. The stated builder’s
margin (15%) is incorrect. The quote specifies $10,252.07, which is 18% not 15%. I accept an
18% margin is not unreasonable. However, if it were 15%, the correct margin would be
$8,543.38. This would also reduce the overall quote to $72,049.24.
The insurer engaged BB to prepare a quote. BB prepared a more detailed scope of work,
providing an estimate of $39,333.61. This quote is intended to cover the same extent of
damage as the IT quote but is significantly cheaper. It is not unreasonable for the insurer to
prefer it. The quote includes unit costings which are absent from the IT quote. It also includes
a 20% claims handling fee which the insurer says is the equivalent of its builder’s margin.
As a direct comparison, the IT quote says it will cost $32,054.93 to ‘supply and lay’ the
replacement floorboards. The BB quote estimates it will cost $18,032.81 to do the same work.
I acknowledge the insurer has access through its repair network to obtain materials at a
cheaper rate than others . This is not unreasonable or unfair. It is reflective of the insurer’s
buying strength in the market. On the basis the contractor is prepared to do the work for the
quoted price, I accept this is fair and reasonable.
The complainants expressed some reservations with BB but were unable to identify any
specific reason why this contractor should not conduct the required work. If BB is prepared to
do the work and can do so for a lesser price than IT, I am satisfied it is fair the insurer can rely
on BB’s quote.
Determination | Case number: 894761 Page 4 of 6
Therefore, I am satisfied the insurer may rely on BB’s quote as a basis for settlement. This
applies whether the quote is used for a cash settlement or to undertake the work. It is also on
the basis that BB intends to use like-for-like replacement products, within the scope of what is
permitted under the policy.
BB must use materials of the same type, standard or specification if available
The complainants expressed reservations over BB’s quote to replace items (including the
floorboards) ‘as near as possible’ to the original.
The policy provides that the insurer will:
do our best to source materials that are the same type, standard and specification
as the original materials that require replacing. Where these are not available in
Australia, we will source and/or pay for the cost of materials we believe to be of a
similar kind or quality.
I am satisfied the above means the same materials must be used where it is possible to do
so. This is on the basis the same materials are available in the Australian market. The
complainants say (for example) their original floorboards are obtainable from a local supplier.
The insurer’s evidence suggests the se floorboards may not be available.
It is not clear if BB’s quote intends to source materials of the same type, standard or
specification. I am satisfied BB should do this if it is possible to do so within the parameters
outlined in the policy. If BB says it cannot source these products, and if the complainants
prove they are available in the local market, I am satisfied the insurer must use them.
To this end, I am satisfied it is fair that BB and/or the insurer detail where and what specific
products it relies on for its quote. Should any of the products not be of the same type,
standard or specification, the complainants will have to prove these products are available
locally. If they do this, the insurer will be requir ed to amend BB’s quote accordingly.
This should ensure the home is returned (as near as possible) to its pre-loss state.
Complainants can choose to have the repairs undertaken by BB
Should BB be retained by the insurer to undertake the repair work, it will be subject to the
terms and conditions of the policy.
The policy does not provide any specific policy guarantee for the quality of repairs. However,
the insurer is a signatory to the General Insurance Code of Practice (GICOP). The GICOP
outlines the behaviours and undertakings given by insurance companies to parties eligible to
claim under their policy. Part 8, clause 86 of the GICOP provides:
If we have selected and directly authorised a repairer to repair your damaged
property, then we will accept responsibility for the quality of their work and the
materials they use. Complaints about the repairer’s conduct, timeliness, quality of
work or the materials they use will be handled under our Complaints process
This means the insurer will be responsible for the quality of the work undertaken by BB. If
there are any concerns or issues which arise from this work, the complainants can raise this
with the insurer.
Determination | Case number: 894761 Page 5 of 6
Noting I accept the insurer is entitled to rely on the BB quote as a basis for settlement, I am
satisfied that:
BB must be prepared to undertake the repair work if the quote is to be relied upon
BB must source materials of the same type, standard or specification to complete the work
if it is possible to do so
the complainants may choose whether to permit BB to undertake the work or whether they
prefer to receive a cash settlement for the repair
if the complainants prefer to be cash settled for the damage, the insurer may rely on the
quote but must include a contingency uplift of 15%. This will compensate the complainant
for any loss of guarantee provided for the repairs and for the transfer of risk.
2.2 Is the insurer required to increase its compensation offer?
Yes. The insurer ’s handling of the claim unreasonably caused a degree of inconvenience for
the complainants. It is required to pay them $500 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Fair that the insurer pays non-financial loss compensation of $500
The complainants say the insurer ’s claims handling has been poor. They consider the insurer
initially accepted their quotation on the phone and later changed its mind during the same
c onversation. Further, they say the insurer’s builder conduct was unprofessional and rude
and the insurer has delayed the settlement of the claim.
The insurer accepts there were claim delays and has offered to waive the policy excess of
$500. I accept the claim would have caused an unusual degree of physical inconvenience
caused by the claims process. I also accept the change of messaging during the phone call
was not handled as well as it should have been. Whilst I do not consider this makes the
insurer lia ble to pay the claim based on IT’s quote, I accept this distressed the complainants.
In addition to waiving the excess, it is fair the insurer is required to pay an additional $500 for
non-financial loss compensation.
Determination | Case number: 894761 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.