Home / IAG / Determination 893992

Determination 893992

Partial decline of storm damage claim to farm stables and other items, with flood excluded; cash settlement offer disputed

FirmIAG
Decided2024-02-22
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$55,000
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Farm owners claimed for storm and flood damage to stables and other items; the insurer partly accepted and offered a cash settlement. AFCA required payment of up to $50,000 for the stables, $5,000 for debris removal and $2,000 non-financial loss, upholding other declines.

The insurer could limit cover to policy terms and exclude flood and uninsured items, but its stables offer did not address all storm damage, so it must pay the sum insured and debris limit.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disastersmall businesspay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 893992 Financial firm Insurance Australia Limited Determination | Case number: 893992 Page 2 of 12 Case number: 893992 22 January 2024 1 Determination overview 1.1 Complaint The complainants hold a Farm Insurance policy with the financial firm (the insurer). The complainants lodged a claim for damages to their farm following a storm event on 26 February 2022. The complainants claimed that the storm had resulted in water damage to their property including the stables, driveway, fencing, hay, electric fence and wiring, and other items. During the course of the claim, the complainants also claimed damage to their home, contents and pool. The insurer partially accepted the claim and has resolved some components of the claim and offered cash settlement amounts for other damage. The insurer has declined some of the other damage claimed. The insurer says some damage was caused by flood, which is not covered under the policy. The complainants dispute the insurer’s decision and seek payment of their claim in full. 1.2 Issues and key findings Is the insurer’s offer fair i n the circumstances? No. The insurer’s offer with respect to the stables does not address all storm related damage. It is fair the insurer increases its offer as noted in section 2.1 of this determination, including for removal of debris. Are the complainants entitled to non-financial loss compensation? Yes. The insurer is to pay the complainants $2,000 non-financial loss compensation for their delays and poor claims handling. Why is the outcome fair? It is fair for the insurer to limit the claim consistent with the cover offered by the policy. However, it would not be fair for the insurer to limit compensation to the complainants for the stables and removal of debris based on the available information. 1.3 Determination This determination is substantially in favour of the insurer. Following receipt of notice that the complainants accept this determination (notice), the insurer is to within 14 days of receiving the notice, pay the complainants:  $50,000 for repairs to the stables less any amount already paid for the electrical repairs to the stables and laneways;  $5,000 for the removal of debris less any amount already paid for the removal of debris;  $2,000 in non-financial loss compensation. Determination | Case number: 893992 Page 3 of 12 2 Reasons for determination 2.1 Is the insurer’s offer of settlement reasonable? No. The insurer’s offer with respect to the stables does not address all storm related damage and it is fair the insurer increases its offer as noted in section 2.1 of this determination, including for removal of debris. Onus on complainants to establish claimable loss The complainants are required to show, on the balance of probabilities (that it is more likely than not), that they suffered a claimable loss under the policy. This means they must show the loss was caused by a risk for which they are insured. Once the complainants prove the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. In late February 2022, there was a significant rain event that swept across northern NSW and southern Queensland. The complainants’ policy includes cover under Section 1 for a listed bu ilding with usage noted as stable. Under Section 2 cover is listed for home building and contents. The Product Disclosure Statement (PDS) confirms on pages 9-10 that if insured under Section 1, the policy provides cover for Property defined in Table A which is lost, destroyed or damaged by a defined event noted opposite in Table A. The defined events noted in Table A include ‘Storm or Rainwater’ with respect to buildings and miscellaneous structures. The Certificate of Insurance (COI) notes that flood is excluded under both Section 1 and Section 2. The complainants have established that the loss and damage is of a type covered by the policy. However, the coverage remains subject to the terms, exclusions and conditions of the policy. Insurer says majority of damage caused by flood The insurer appointed a hydrologist, WT who attended the property on 12 May 2022. WT noted that the property is located within the L and A River catchment about 300 metres north of C Creek, a tributary of the A River. The L and A Rivers were noted to have a large catchment area of approximately 3,000km 2 . WT noted that the house was located on elevated ground with lower lying paddocks. The house pad had an elevation of 36m Australian Height Datum (AHD). The main stable was at 33m AHD. The paddocks border low lying swamp which is the floodplain of C Creek and has an approximate level of 30m AHD. The lower stables are at a level of around 31m AHD. WT noted that the paddocks are low lying and not free draining. The paddocks capture flow from the local catchment to the north and from the east the culvert under the WT Road. WT found that there was evidence of local scouring and rutting of pathways and access tracks throughout the paddocks. WT estimated the flood depth of 1.5m through the paddock based on the description by the complainants. WT concludes: Determination | Case number: 893992 Page 4 of 12  the insureds’ property was initially subject to significant stormwater runoff which most likely caused the observed damage to paddocks and access tracks through scouring; and  the maximum inundation of the property was associated with floodwater from the A River which flowed back up C Creek and inundated the Subject Property. The complainants have not provided any report to refute the findings of WT. The panel is satisfied based on the report from WT that the initial inundation of the paddocks, smaller stables and main stable was due to stormwater runoff and not floodwaters. WT notes that the stables were at the same level of the lower paddocks. The panel accepts that the stormwaters mixed with floodwaters at some stage on 27 February 2022. Such water is considered to floodwater. Damage to main stables caused by stormwater The complainants say that the stormwater runoff eroded the soil underneath the main stable which has compromised the structure. They say that the structure needs to be demolished and have obtained a quote for the building of a new stable in excess of $100,000. This does not include the demolition of the existing stable. It is not in dispute that the main stable suffered damage caused by stormwater. The insurer obtained a report from an engineer, IE. IE inspected the stables and provided reports. In the supplementary report from IE dated 17 November 2022, IE observed the bracing that had been installed as make safe works. IE notes that in the initial report they had observed damage to the stable’s foundation, marine ply wall panels, timber sleeper retaining wall and the driveway. In the subsequent inspection, it was noted there was new twisting of the front roof fascia and roof insulation was also noted as having suffered damage from the rain event. Some of the steel supports were also noted to have experienced some slight racking movements. Movement of the slab was noted on the western edge and the southwestern corner had dropped. The scope of works proposed by IE was to import and install fill material into the cavity under the concrete slab and then a grout injection of the fill material to further stabilise it. IE did not recommend any remedy for rectification of the insulation or steel supports. IE concedes that it could not determine the extent of the undermined void under the foundation slab of the stables or if it was due to the storm event. IE also concedes that the make safe repairs may have stabilised or propped the structure back into place. The insurer does not dispute the void under the northwest section of the slab is due to the surface runoff. The insurer has obtained a quote from builder AB dated 18 November 2022. The quote in the sum of $10,577.30 is for the supply and installation of concrete leveller under the stable slab. The insurer has offered the complainants a cash settlement based on this quote. The panel is not satisfied that the scope of works suggested by IE and quoted by AB is sufficient to repair the storm related damage. As noted by IE, the extent of the void under the slab is unknown. IE has not provided any explanation as to how this should be further assessed. AB has also not provided any assessment of the extent of fill that would be required. Further, there has been no allowance for:  repairs to the front roof fascia;  replacement of roof insulation; Determination | Case number: 893992 Page 5 of 12  levelling the outer slab which has dropped;  repairs to bring back the steel railing to their original position;  repairs to the support posts which are out of plumb. The panel also notes that there was no inspection of the concrete slab by IE. In August 2022, IE noted that the concrete floor was covered in hay. Based on the photographs provided by IE in November 2022, this remains the same. IE also refers to the retaining wall up to 800mm high that surrounds the northern and eastern grounds of the stables to create a level platform for the construction of the stables. IE noted that the timer support post was observed to have experienced outward rotation. IE concluded that this was damaged by the surface runoff. The insurer has previously accepted liability for this retaining wall. The insurer’s settlement offer has not included any costs for the repair of the retaining wall, including the timber support posts. Damage to smaller stables caused by stormwater The complainants say that the five stables need new diamond grip flooring, excavations and fill. Given the location of the smaller stables and WT’s findings in relation to stormwater runoff in the lower paddocks, the panel is satisfied that the lower stables were initially inundated by stormwater. Further, the insurer has accepted stormwater caused damage to the main stables which are located at a height of 33m AHD and the lower stables at 31m AHD. The insurer advised the complainants in a letter dated 24 June 2022 that it accepted the damage chipboard wall linings of the stables built from ground level. The panel takes this to mean the smaller stables as the main stables walls are marine panel walls as noted above. The insurer’s offer of settlement has not included repairs to the chipboard linings of the stables. Insurer should settle complainants for the stables to the extent of the sum insured The COI in Section 1 provides that the building, with usage noted as stable, is insured for $50,000. It is not clear whether this sum insured relates to the main stable or all the stables, including the smaller stables at the property. As the COI is ambiguous, the panel considers it fair the insurer considers damage to the smaller stables under this sum insured. The panel notes that comments from the insurer’s assessor S in relation to the exclusion clause in relation to the retaining wall and the free standing walls. However, the insurer has not sought to rel y on this exclusion clause to deny these aspects of the complainants’ claim. Given that the insurer bears the onus of establishing its reliance on the exclusions clauses, the panel is not satisfied that it has established any reliance of the exclusion clause with respect to the retaining wall or walls of the lower stables. The panel considers in all the circumstances that the insurer should settle the complainants to the extent of the policy sum insured, being $50,000. This is because of the uncertainty of the repair method to the main stable and the repairs to the smaller stables which were damaged by stormwater runoff. Determination | Case number: 893992 Page 6 of 12 For clarity, the insurer is entitled to deduct any amount already paid for the electrical repairs to the stables and laneways (see below) from the sum insured. Complainants claim additional losses The complainants say that the stormwater runoff caused extensive damage. They are claiming for the following loss and damage which are in dispute:  cleaning of stables  replacement of taps x 10 and piping  excavation  diamond grip flooring in middle laneway of paddocks, refilling and levelling  replacement of water troughs  replacement of gates  earthworks  removal of debris  horse feed and vitamins  electric fence and wiring The insurer has settled the complainants for damage to their bore pump based on an invoice provided by the complainants. The insurer has also made additional payments to the complainants for waste water treatment. Insurer has fairly settled electrical repairs In relation to the electrical items, the insurer appointed an electrician, SE, to assess the electricals at the property. SE provided a scope of work (SOW) to replace the electricals which were damaged during the storm event. The insurer’s claim notes and claims payment history record payment to the complainants for $9,435.60 plus GST. This is based on the SOW from SE for the electrical works required for the stables and laneways. The complainants have not provided any information that this sum is inadequate. The panel considers that the insurer has fairly settled this component of the claim. Insurer has fairly settled fencing damage The complainants also claimed for damage to their fences. The insurer had initially declined the claim, however, during the complaint, the insurer overturned this decision. The insurer has provided information confirming that it has paid the complainants $87,237.70 for fencing. The panel is satisfied that this has resolved this component of the complainants’ claim. Removal of debris The complainants seek reimbursement of costs associated with the removal of debris after they were required to clean up the property following the storm event. The complainants say that they have incurred costs in the hire of several skip bins and the hire of bobcats to remove the debris. Under Section 1 of the COI, the policy covers the removal of debris up to a total of $5,000. The complainants have provided a number of invoices for the hire of skip bins. The insurer has paid to the complainants a portion of their invoices as they say that the policy does not cover earthworks. The complainants say that they have incurred costs in disposing of many water damaged items. This has included water damaged horse feed, fences, and household furniture. The complainants have provided a photograph of a skip bin with some items of furniture in it. Determination | Case number: 893992 Page 7 of 12 The complainants also have claimed the sum of $1,375 for the hire of a Kubota and $11,140 from Rebel Hire to assist in debris removal. The panel is satisfied that it is plausible, given it has been established that the fences, stables, paddocks and farm tracks were initially inundated and damaged due to stormwater runoff, that there would have been debris that required removal. This includes the fences that the insurer has compensated the complainants for. The panel is satisfied that it is fair in all the circumstances for the insurer to pay the complainants the sum of $5,000 in accordance with the policy limit. The complainants have provided information to support that they have incurred costs in excess of this amount for the purpose of removal of debris. For clarity, the insurer is entitled to deduct any amounts already paid for removal of debris from the $5,000 sum insured. Other damage excluded under policy terms The insurer has obtained a report from an assessor S and relies on this report, together with the hydrologist report WT to exclude many of the items claimed by the complainants. The items are considered below: Cleaning of stables Pages 7-14 of the PDS describe the coverage available under Section 1. The panel is satisfied that cleaning costs of the stables are not covered under the terms of the policy. Taps, piping and water troughs The complainant claims for the replacement of 10 taps and piping. Further, claims for replacement of water troughs. S noted that the taps and troughs were damaged by flood. The insurer says that flood is excluded from cover under the policy and denies the claim for the taps, piping and troughs. The panel accepts given the findings from WT about the extent of the stormwater runoff, it is likely that the piping was damaged. Given the height of a tap and troughs, the panel is satisfied that these are likely to have been damaged by floodwater based on the findings from WT in relation to floodwater levels. However, the complainants have not insured them either as listed Contents under Section 1 or irrigation equipment. The insurer can decline the claim for taps, piping and water troughs. Excavation The complainants claim the sum for the hire of a bobcat for earthworks. The insurer has declined the claim on the basis that the damages were caused by flood or was pre-existing damage. The panel has considered the hire of the bobcat for the purpose of the removal of debris, in particular the damaged fences. However, the panel is satisfied that the insurer can decline compensation for the Rebel Hire invoice supplied by the complainants and any other costs associated with excavation as it is not covered under the policy terms. Diamond grip flooring in middle laneways Determination | Case number: 893992 Page 8 of 12 The complainants claim for the replacement of diamond grip in the middle laneway of paddocks, re-filling and levelling. The insurer has declined the claim on the basis that the complainants have not provided evidence that it was in place prior to the storm event and/or that the loss arises from the flood which is an excluded event. The panel accepts the insurer’s submission and it can decline cover for the di amond grip flooring. Gates The insurer says that the complainants have elected not to insure the fencing in the horse paddocks. Any gates associated with fencing under Section 1 of the COI are excluded. Further, the gates were damaged by flood which is also excluded. The panel accepts that the gates are specifically excluded, and the insurer is able to decline the complainants’ claim for the gates. Earthworks The panel is satisfied that although WT noted the scouring damage to the paddocks and access tracks was caused by stormwater, the policy does not provide cover for this. Horse feed and vitamins The panel is satisfied that these items are not covered under the terms of the policy. Electric fence and wiring The insurer can decline the claim for electric fence and wiring as the panel is satisfied that these items are not covered under the terms of the policy. The complainants had elected not to cover Contents under Section 1 of the policy. The complainants have, at various times, raised other issues that they sought compensation from the insurer saying that it was damaged by the storm event. The panel is satisfied that the insurer is able to limit the complainants’ claim with respect to the stables and surrounds to the items referred to above. See Section 3. 1 in relation to the complainants’ claim for the home, contents, driveway and pool. 2.2 Are the complainants entitled to compensation? Yes. The insurer is to pay the complainants $2,000 non-financial loss compensation for their delays and poor claims handling. AFCA can award indirect financial loss compensation Under paragraph D.3.2 of the AFCA Rules, we may require an insurer to compensate a complainant for indirect financial loss (also known as consequential loss). The loss must arise from the conduct of the insurer. The maximum amount we may award is capped at $5,400. However, we may not award indirect financial loss if the complaint arises because of a claim or a general insurance policy that expressly excludes such liability. Page 54 of the PDS provides that the policy does not pay for any loss, destruction, damage or liability directly or indirectly caused by, or contributed to by any consequential loss of any description. Determination | Case number: 893992 Page 9 of 12 The complainants have submitted an invoice in the sum of $151,899 issued to the insurer for losses they say were caused by the insurer’s claims handling. The complainants say that because of the insurer’s claim handling they were unable to run their business which included being able to stable horses and provide horse riding lessons. The complainants say that they lost regular and potential clients. The complainants also claim the sum of $52,000 for costs incurred for hiring temporary stables. The complainants say that the stables were at risk of falling. The available information shows that the complainants were trying to source temporary stables around 18 October 2022. However, the insurer completed the make safe on the stables on 21 October 2022 which stabilised the structure. The panel is not satisfied that the stables were unstable, nor unfit for purpose. The panel is satisfied that such losses, including business losses and the hire of temporary stables are considered to be an indirect financial loss and are excluded under the policy. The complainants had not taken the business interruption cover under the policy. The panel is satisfied that the complainants are not entitled to an award of indirect financial loss compensation. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer delayed its assessment of the claim The complainants say that the insurer has delayed its assessment of the claim. They were slow to respond to emails and calls and failed to reimburse the complainants’ costs for emergency repairs which caused them stress and inconvenience. The panel notes that the storm event was a Catastrophic Event as defined by the Insurance Council of Australia which resulted in a surge of insurance claims. This meant that suitably qualified experts were in high demand and this caused delays for the insurer. The insurer has acknowledged that there had been delays in having an assessor and hydrologist attend and provide reports. The panel notes that the insurer’s claim handling was at times slow to respond to the complainants. However, the panel also notes that much of the stress and inconvenience relating to the claim appear to rela te to the financial concerns relating to the complainants’ business. The panel has determined this was not indirect financial loss or a claimable loss under the policy. The panel notes however that the insurer has been slow to fully assess its liability in relation to the stables. The panel is satisfied this would have caused an unusual degree of stress and inconvenience to the complainants. Considering what is fair in all of the circumstances, the insurer should compensate the complainants the sum of $2,000. Determination | Case number: 893992 Page 10 of 12 2.3 Why is the outcome fair? It is fair for the insurer to limit the claim consistent with the cover offered by the policy. However, it would not be fair for the insurer to limit compensation to the complainants for the stables and removal of debris based on the available information. Determination | Case number: 893992 Page 11 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Home, contents, driveway, pool and motorbike not considered in this determination Section 2 of the COI provides cover for the home building and contents, including the driveway around the home and the pool. During this complaint, the complainant also claimed for damages to her home, contents, driveway and pool were damaged because of the storm. The amount being sought by the complainant is over AFCA’s jurisdictional limit. AFCA has issued a Rules outcome letter confirming that these claimed loses are outside our Determination | Case number: 893992 Page 12 of 12 jurisdictional limit and will not be considered as part of this determination. This determination is limited to the cover listed under Section 1 of the COI. The complainant also claims under the policy for damage to a farm vehicle. However, this is being separately considered under a motor vehicle claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.