Home / Hollard / Determination 892863
Determination 892863
Insurer denied liability for faulty balcony repairs by its authorised repairer and delayed resolution
Summary
The complainant's balcony repairs by the insurer's authorised repairer failed again, and the insurer denied liability. AFCA found the repairs defective and ordered the insurer to obtain a quote and repair or cash settle with 10% uplift, cover loss of rent for the repair period, and pay $4,000 non-financial loss.
Independent expert reports were more persuasive than the repairer's rebuttal, so the insurer remained liable for defective work by its authorised repairer and for the excessive delay and handling.
Issues
- Repairs or contractors primary · upheld
“The panel is satisfied the insurer is liable for the defective work identified by SW and should compensate the complainant”
- Poor claim handling secondary · upheld
“compensated for the inconvenience and delays caused by the insurer's claims handling”
- Inadequate claim investigation secondary · upheld
“It decided to accept the view the builder alleged to have incorrectly performed the work over two independent builders' opinions and evidence.”
- Delay secondary · upheld
“the length of time taken to resolve the matter has been excessive”
- Poor communication secondary · upheld
“The email is arguably misleading as at that time the insurer had not received the forensic building report from SW.”
Subjects and remedies
home or building damagepay claimpay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 892863
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 892863 Page 1 of 9
Case number: 892863 23 January 2023
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer) and lodged
claims for water damage to her home in 2013 and 2017. The insurer accepted the claims and
authorised repair work with QA.
The complainant says the repairs are faulty and there is further damage to the balcony and
kitchen. She says the insurer has caused unnecessary delays and stress due to its handling
of the claim and faulty repairs. The insurer denies the repair work was faulty. Further it says
the investigation per formed by the complainant’s tradesman (SB) has voided the warranty for
the work currently in dispute.
The complainant disputes the insurer’s decision and seeks rectification of the faulty repairs to
the balcony, loss of rent and maintenance expenses she would have avoided if not for the
alleged error. The complainant also seeks compensation for the stress associated with the
claims handling.
1.2 Issues and key findings
Is Insurer liable for further balcony repair and other losses?
Yes. The panel is satisfied the insurer is liable for the defective work identified by SW and
should compensate the complainant as set out in section 2 of this determination.
Is complainant entitled to non-financial loss compensation?
Yes. The complainant has suffered an unusual degree of inconvenience and time taken to
resolve the situation. Compensation of $4,000 for non-financial loss is fair.
Why is the outcome fair?
The complainant is entitled to repairs which are successfully completed and free of defects. It
is fair that the insurer covers the costs to complete the rectification. It is also fair the
complainant is compensated for the inconvenience and delays caused by the insurer ’ s claims
handling.
1.3 Determination
This determination is substantially in favour of the complainant. Within 14 days of the
complainant’s acceptance of this determination the insurer is to:
organise for SW to obtain an actionable quote from a suitably qualified repairer to
complete the rectification work as set out in its scope of works. The insurer may then either
complete the repairs or cash settle the claim. If cash settled the insurer should provide a
10% uplift on the quote to cover contingencies.
cover the loss of rent for the repair period as set out in section 2 of this determination
pay the complainant $4,000 compensation for non-financial loss.
Determination | Case number: 892863 Page 2 of 9
2 Reasons for determination
2.1 Is insurer liable for further balcony repair and other losses?
Yes. The panel is satisfied the insurer is liable for the defective work identified by SW and
should compensate the complainant as set out in this determination.
Circumstances of the claim
The complainant first lodged a claim in 2013 after heavy rain caused damage to a balcony
which resulted in water damage to the kitchen below. The insurer agreed to repair the
balcony and kitchen and appointed QA to complete the repairs.
In 2017 the kitchen area was again damaged after water entered the kitchen from the balcony
during heavy rain. The complainant’s insurer at that time (S) determined the previous repairs
were faulty. The complainant lodged a claim with the insurer for the faulty repairs which was
denied.
The complainant lodged a complaint with AFCA (complaint 483816) and with the Queensland
Building and Construction Commission (QBCC). The panel notes the previous determination
accepted the faulty repair work portion of the previous complaint was resolved. QBCC had
inspected the property and confirmed the balcony waterproofing was non-compliant. QBCC
directed QA to correct this. The insurer was required to pay the loss of rent until either the
property was re-tenanted or six weeks after completion of repairs whichever occurred first.
There is no dispute QA completed subsequent rectification work following the QBCC
directive. QBCC advised the complainant on 20 February 2018 that QA had completed the
rectification work as per its directive and closed the file.
In September 2019 the complainant notified the insurer of what she believed were further
defects with stalagmites forming under the edge of the balcony. The complainant believes this
was caused by efflorescence due to moisture in the mortar bed of the tiles. The complainant
believes this was evidence of faulty workmanship from 2017. QA says it had used the best
materials and says its inspection on 4 September 2019 found no evidence of any structural
movement, water entry or other defects relating to the installation of the balcony substrate or
waterproofing membrane. QA considered the efflorescence was a minor cosmetic issue. The
insurer denied liability for any defective repairs.
The complainant says after further torrential rain in March/April 2021 there was further water
ingress into the kitchen due to fault repairs to the balcony.
Expert reports differ as to cause of damage
The complainant’s builder S B reported on 4 May 2021 that due to faulty workmanship on the
balcony, water was escaping through the sheet joins and excessive deck movement. SB
reported that after completing invasive testing to the compressed decking and tiles, it found
multiple issues and water entry points compromising the balcony structure and allowing water
to enter the building. A summary of the report is in section 3.2 of this determination.
Following receipt of this report the insurer emailed the complainant on 13 May 2021. The
email indicates the insurer ’ s finding was that the 2017 repairs were faulty and required repair.
The email is arguably misleading as at that time the insurer had not received the forensic
building report from SW.
Determination | Case number: 892863 Page 3 of 9
The insurer obtained an independent forensic building report from SW. SW attended the
home on 25 May 2021 and found:
water stains on the framing above the kitchen window;
cracking to the patio water proofing membrane directly above the kitchen bulkhead at the
junction of the floor and wall;
fixing points for the balustrade spigots are not nogged to fix the handrail securely and the
fixing penetrations have compromised the membrane.
the patio edge tile strip is allowing water to run down the face of the cladding allowing
water drips to form stalactites on the bottom edge of the cladding and is not as per
Australian Standard.
SW considered the waterproof membrane had failed and had not been installed to Australian
standards. SW considered the repairs required rectification. The report is summarised in
section 3 of this determination
The insurer had QA, the original repairer, review the reports. QA does not accept the findings
of SB or SW. QA’s reports are summarised in section 3 of this determination.
QA says the report from SW is based on limited and possibly incorrect information. QA makes
several comments about the accuracy of the report. SW was appointed by the insurer. There
is no evidence to suggest SW was provided incorrect information.
The panel notes reference by QA to a supplementary report from SW. This has not been
provided by the insurer in the exchanged information.
The insurer refers to a further inspection of the property on 24 August 2021 with the
complainant, SB, SW, QA and the insurer ’ s assessor present. It says there was enough
information for the internal assessor to make a decision on faulty workmanship. The insurer
has not provided the opinion of the internal assessor. It has not provided any report of the
attendance on 24 August 2021, notes from the site attendance or a supplementary report
from SB or SW following the meeting.
Panel finds independent expert reports more persuasive
The panel considered whether the insurer could decline liability based on QA’s rebuttal, but
was not persuaded this would be fair in the circumstances.
QA was the repairer in 2013. It had denied faulty repairs in 2017 until directed to compete
repairs by QBCC. It again denied issues with repairs after the complainant notified it of
stalactites forming below the balcony and has now denied faulty workmanship causing further
water leaks. QA’s reports are not independent reports.
QA and the insurer say SB should not have disturbed the area. They say th is voided QA’s
warranty when it did so and caused QA prejudice. QA says the complainant’s build er SB
removed tiles and likely compromised the waterproofing. QA says it has been prejudiced as
other trades investigated the issue and it was not invited to re-inspect the damage sooner.
However, the insurer had the opportunity of having QA attend the property earlier. The
complainant says the investigative work by SB was authorised in a telephone call with the
insurer on 3 May 2021. The insurer was asked to provide a copy of that call recording. It has
failed to do so.
The complainant says SB was appointed after further water damage occurred. The insurer
has not disputed this. There is no evidence the invasive testing by SB compromised the
Determination | Case number: 892863 Page 4 of 9
waterproof membrane. The panel is persuaded the fault most likely existed prior to the
invasive testing by SB.
QA has pointed out cracks in the render of the upper floor of the property and a missing
window as alternative explanations for the water damage to the kitchen window framing.
There is no evidence of any damage occurring due to the private works undertaken at the
home or while the window was being replaced.
QA says the complainant had an obligation to complete further maintenance work which it
was not satisfied had occurred. It is unclear how a failure to complete maintenance work has
compromised the waterproofing.
The panel is persuaded that the ongoing water damage was most likely caused by the faulty
waterproof membrane and ongoing issues with the balcony repairs. QA is the only party
arguing there were other causes.
The panel is not persuaded the information provided by the insurer establishes a reason why
this damage has occurred other than the work performed by QA failed within the builder’s
warranty period. In the absence of another consistent and persuasive explanation, the panel
is satisfied, on balance, the damage is due to faulty workmanship.
Insurer to accept liability and settle complainant for subsequent loss
The insurer is to accept liability for rectifying QA’s defective work. QA has already confirmed it
declines to undertake any further work on the property. Regardless the complainant has
made clear she no longer wants QA to complete the repairs.
In the panels view, to resolve this dispute, the insurer should have SW obtain an actionable
quote from a suitably qualified repairer to complete the rectification work as set out in the
SOW. The SOW should include repair of any internal water damage caused by the faulty
waterproofing.
The insurer can then either have the builder complete the repairs or cash settle the claim. If
the insurer intends to offer a cash settlement, then the insurer is to include a 10%
contingency payment on top of the actionable quote for the transfer of risk to the complainant
when completing the work.
Loss of rental income only for period of the repair work
The panel is satisfied the complainant should be reimbursed for loss of rental income but is
not satisfied this should be in arrears.
The reason for this is the property was under renovation work at the time the damage was
discovered. Accordingly, the panel is not satisfied the reason the complainant was without
rent was due to the defective work. Further, the leak does not appear to have rendered the
property uninhabitable, meaning its impact on loss of rent is negligible.
This said, repair of the balcony will cause substantial discomfort to anyone living in the
property, and the panel is satisfied this will likely rise to the level of uninhabitable for the
buildings intended purpose (i.e. generating rental income).
Accordingly, if the insurer elects to complete the repairs it is to pay the complainant for loss of
rental income while the repair work is under way, and for a period of four weeks after the
repair, or until the property is re-tenanted, whichever is sooner. If the insurer elects to cash
settle the repairs, then it is to pay the loss of rental income for the estimated repair period
plus and additional period of four weeks to allow for the property to be re-tenanted. The
Determination | Case number: 892863 Page 5 of 9
insurer does not need to include the uplift or interest payment when it settles this portion of
the complaint.
2.2 Is complainant entitled to non-financial loss compensation?
An award of non-financial loss is warranted
Under AFCA’s rules, we may award up to $5,400 compensation for non-financial loss. We will
only award this type of compensation where the complainant experienced an unusual extent
of physical inconvenience, time taken to resolve the claim, or interference with their
enjoyment of peace of mind, due to the insurer ’s handling of the claim.
Having reviewed the available evidence, the panel is satisfied a substantial award of non-
financial loss is warranted.
This is because the complainant supplied a detailed account of the claim experience. It is
clear from reading the evidence the insurer’s handling of the claim has led to substantial
interference with her peace of mind.
Further, the length of time taken to resolve the matter has been excessive with the
complainant required to go to extraordinary lengths to prove the repairs were not completed
to standard even after the QBCC found the original works were inadequate.
This insurer then contributed to further delay in resolving the matter. It decided to accept the
view the builder alleged to have incorrectly performed the work over two independent
builders ’ opinions and evidence.
Given the claim experience, the panel is satisfied an award of $4,000 is fair in these
circumstances. The insurer is to pay this to the complainant within 14 of the complainant
accepting this determination.
2.3 Why is the outcome fair?
This is a fair outcome as the complainant is entitled to repairs which are successfully
completed and free of defects. As the insurer has proceeded with the work through one of its
authorised repairers with whom it has direct a relationship, it remains liable for the repair until
the work is successfully completed and is free of defects. Further, it is fair the complainant
receives compensation for the excessive difficulty experienced while pursuing their claim.
Determination | Case number: 892863 Page 6 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 892863 Page 7 of 9
3.2 Expert evidence summary
Record Key points
Insurer’s builder ( Q A)
Report
15 October 2019
visit carried out on 4 September 2019 to review work complet ed
on 9 February 2018
efflorescence on the fascia tiles is not due to QA’s work
products used in the repair are fit for purpose
inspection found no evidence of structural movement, water entry
or other defects
efflorescen c e prese nt is minor and cosmetic and should be
resolved with regular cleaning and maintenanc e
QA believes close proximity to salt water environment and no roof
protecting the deck surface from rain and dew i s contributing to
efflorescence
AS 3958.1 2007 C2. 2 says efflorescence is caused by liquid water
carrying soluble salts from below the tile to the surface
AS 3958.1 2007 C2. 2 explains the cleaning process for
efflorescence
QBCC guidelines state calcification or efflorescence from a deck,
balcony or wall occurring within 12 months of work being
completed is a defect
QA does not accept the work performed was defective and notes
a large uncovered hole in the external cladding above the deck
from recent renovations has the potential to allow significant wat er
entry into the wall cavity.
Complainant’s builder (SB)
Report
4 May 2021
found multiple water entry points compromising the balcony
structure and allowing water into the building
most water seems to enter along the sheet joins and there is
excessive move ment to the deck
original builder has not followed manufacturer technical
specifications during construction
double joists not present at sheet joins
no back flashing on top of structural joists to stop water
penetration
no evidence of expansion joints at the sheet joins required in the
manufacturer specifications
balustrade fixing does not meet NCC requirements and does not
have waterproof sealing to the feet
tile construction joints have not been installed to Australian
Standard
recommends removing and replacing existing tiles, soffit and
compressed sheet and correcting errors noted.
Insurer’s building consultant
( SW )
Report
9 June 2021
water stains noted to the kitchen window frame
there are cracks in the patio waterproof membrane directly above
the kitchen bulkhead at the wall and floor junction
balustrade fixings have penetrat ed and compromised the
waterproof membrane
Determination | Case number: 892863 Page 8 of 9
Record Key points
water drips off the patio edge tile strip forming stalactites on the
bottom edge of the tiling which are not to Australian Standard
4 654.2
tile drip edge does not prevent water ingress to structural areas of
the building
waterproof membrane needs to be replaced.
Insurer’s builder (QA)
Rebuttal letter
24 June 2021
QA does not accept liability for alleged faulty workmanship at the
property
QA believes SW’s report is based on limited evidence and
contains factually incorrect information
water leak to the kitchen ceiling however, no photos of this area or
repairs noted in SW’s scope of work
upper storey FC sheets were cracking unrelat ed to QA work, in
the wall lining on the balcony and QBCC has not held QA liable for
this
signs external wall cracks have been sealed by others, there is a
high chance of water entry during periods of wind driven rain
because of the FC sheet cracking
SW ha s not performed a flood test to confirm leak via the balcony
tiles
water staining may have occurred in 2013 or prior to rectification
work in 2018
tradesmen are completing repair work in ‘unrelated areas’,
however one of the images shows them working on th e balcony
tradesman on the balcony appear to be performing non - compliant
work relating to a sliding door
photo of alleged cracking to waterproof membrane is a close up
meaning QA cannot confirm its location
information about balustrade spigots not being no gged and have
penetrated the waterproof membrane are not correct based on the
photos in QA’s rebuttal letter
alleged patio tile edge defect is not applying the correct reference
for the site application and the drip edge us ed is purpose built to
meet compl iance
insufficient evidence the tile drip is leading to damage of structural
members
stalactites confirmed as maintenance relat ed in the 2019
attendance indicating the complainant is still not maintaining the
property
photos demonstrate the waterproof memb rane is continuous
QA does not agree with SW’s proposed scope of work even if it
were accepting liability, which it is not.
Insurer’s builder (QA)
Rebuttal letter
undated
QA believes SW’s report is not support ed by the evidence
complainant has engaged other builders to perform work around
where they are now alleging there is defective work performed by
QA
Determination | Case number: 892863 Page 9 of 9
Record Key points
work has impacted the previous work and subsequently has
voided the builders warranty QA was providing
SB did not notify QA of any leaks and has preju diced QA in
determining causation by undertaking works without first allowing
QA to inspect
SW confirms two skirting tiles have been removed by SB
QA says tiles removed by SB should be considered a major factor
when considering liability for the leak
QA s ays SB confirmed on - site they removed t wo skirting and floor
tiles
tiles are directly fixed to the wat erproof membrane
flood test did confirm a leak to the deck directly below the tiles SB
removed
QA says the waterproof membrane was compromised at the time
the tiles were removed by SB
QA says SW has made supposition about the installation of the
FC sheets as it was a visual ins pection which could not see the
FC sheet joins
QA says the FC sheets are installed consistent with the
manufacturer specifications b ased on photo evidence
QA maintains the stalactites are a maintenanc e item rather than a
compliance issue
QA maintains it work was complet ed compliantly and has not
contribut ed to any of the current or alleged issues experienced at
the property
QA maintains the builder’s warranty has been voided by work
performed by others and declines liability and any further claims
for the deck work.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.