Home / Hollard / Determination 892863

Determination 892863

Insurer denied liability for faulty balcony repairs by its authorised repairer and delayed resolution

FirmHollard
Decided2023-03-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's balcony repairs by the insurer's authorised repairer failed again, and the insurer denied liability. AFCA found the repairs defective and ordered the insurer to obtain a quote and repair or cash settle with 10% uplift, cover loss of rent for the repair period, and pay $4,000 non-financial loss.

Independent expert reports were more persuasive than the repairer's rebuttal, so the insurer remained liable for defective work by its authorised repairer and for the excessive delay and handling.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial lossrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 892863 Financial firm Hollard Insurance Partners Limited Determination | Case number: 892863 Page 1 of 9 Case number: 892863 23 January 2023 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer) and lodged claims for water damage to her home in 2013 and 2017. The insurer accepted the claims and authorised repair work with QA. The complainant says the repairs are faulty and there is further damage to the balcony and kitchen. She says the insurer has caused unnecessary delays and stress due to its handling of the claim and faulty repairs. The insurer denies the repair work was faulty. Further it says the investigation per formed by the complainant’s tradesman (SB) has voided the warranty for the work currently in dispute. The complainant disputes the insurer’s decision and seeks rectification of the faulty repairs to the balcony, loss of rent and maintenance expenses she would have avoided if not for the alleged error. The complainant also seeks compensation for the stress associated with the claims handling. 1.2 Issues and key findings Is Insurer liable for further balcony repair and other losses? Yes. The panel is satisfied the insurer is liable for the defective work identified by SW and should compensate the complainant as set out in section 2 of this determination. Is complainant entitled to non-financial loss compensation? Yes. The complainant has suffered an unusual degree of inconvenience and time taken to resolve the situation. Compensation of $4,000 for non-financial loss is fair. Why is the outcome fair? The complainant is entitled to repairs which are successfully completed and free of defects. It is fair that the insurer covers the costs to complete the rectification. It is also fair the complainant is compensated for the inconvenience and delays caused by the insurer ’ s claims handling. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the insurer is to:  organise for SW to obtain an actionable quote from a suitably qualified repairer to complete the rectification work as set out in its scope of works. The insurer may then either complete the repairs or cash settle the claim. If cash settled the insurer should provide a 10% uplift on the quote to cover contingencies.  cover the loss of rent for the repair period as set out in section 2 of this determination  pay the complainant $4,000 compensation for non-financial loss. Determination | Case number: 892863 Page 2 of 9 2 Reasons for determination 2.1 Is insurer liable for further balcony repair and other losses? Yes. The panel is satisfied the insurer is liable for the defective work identified by SW and should compensate the complainant as set out in this determination. Circumstances of the claim The complainant first lodged a claim in 2013 after heavy rain caused damage to a balcony which resulted in water damage to the kitchen below. The insurer agreed to repair the balcony and kitchen and appointed QA to complete the repairs. In 2017 the kitchen area was again damaged after water entered the kitchen from the balcony during heavy rain. The complainant’s insurer at that time (S) determined the previous repairs were faulty. The complainant lodged a claim with the insurer for the faulty repairs which was denied. The complainant lodged a complaint with AFCA (complaint 483816) and with the Queensland Building and Construction Commission (QBCC). The panel notes the previous determination accepted the faulty repair work portion of the previous complaint was resolved. QBCC had inspected the property and confirmed the balcony waterproofing was non-compliant. QBCC directed QA to correct this. The insurer was required to pay the loss of rent until either the property was re-tenanted or six weeks after completion of repairs whichever occurred first. There is no dispute QA completed subsequent rectification work following the QBCC directive. QBCC advised the complainant on 20 February 2018 that QA had completed the rectification work as per its directive and closed the file. In September 2019 the complainant notified the insurer of what she believed were further defects with stalagmites forming under the edge of the balcony. The complainant believes this was caused by efflorescence due to moisture in the mortar bed of the tiles. The complainant believes this was evidence of faulty workmanship from 2017. QA says it had used the best materials and says its inspection on 4 September 2019 found no evidence of any structural movement, water entry or other defects relating to the installation of the balcony substrate or waterproofing membrane. QA considered the efflorescence was a minor cosmetic issue. The insurer denied liability for any defective repairs. The complainant says after further torrential rain in March/April 2021 there was further water ingress into the kitchen due to fault repairs to the balcony. Expert reports differ as to cause of damage The complainant’s builder S B reported on 4 May 2021 that due to faulty workmanship on the balcony, water was escaping through the sheet joins and excessive deck movement. SB reported that after completing invasive testing to the compressed decking and tiles, it found multiple issues and water entry points compromising the balcony structure and allowing water to enter the building. A summary of the report is in section 3.2 of this determination. Following receipt of this report the insurer emailed the complainant on 13 May 2021. The email indicates the insurer ’ s finding was that the 2017 repairs were faulty and required repair. The email is arguably misleading as at that time the insurer had not received the forensic building report from SW. Determination | Case number: 892863 Page 3 of 9 The insurer obtained an independent forensic building report from SW. SW attended the home on 25 May 2021 and found:  water stains on the framing above the kitchen window;  cracking to the patio water proofing membrane directly above the kitchen bulkhead at the junction of the floor and wall;  fixing points for the balustrade spigots are not nogged to fix the handrail securely and the fixing penetrations have compromised the membrane.  the patio edge tile strip is allowing water to run down the face of the cladding allowing water drips to form stalactites on the bottom edge of the cladding and is not as per Australian Standard. SW considered the waterproof membrane had failed and had not been installed to Australian standards. SW considered the repairs required rectification. The report is summarised in section 3 of this determination The insurer had QA, the original repairer, review the reports. QA does not accept the findings of SB or SW. QA’s reports are summarised in section 3 of this determination. QA says the report from SW is based on limited and possibly incorrect information. QA makes several comments about the accuracy of the report. SW was appointed by the insurer. There is no evidence to suggest SW was provided incorrect information. The panel notes reference by QA to a supplementary report from SW. This has not been provided by the insurer in the exchanged information. The insurer refers to a further inspection of the property on 24 August 2021 with the complainant, SB, SW, QA and the insurer ’ s assessor present. It says there was enough information for the internal assessor to make a decision on faulty workmanship. The insurer has not provided the opinion of the internal assessor. It has not provided any report of the attendance on 24 August 2021, notes from the site attendance or a supplementary report from SB or SW following the meeting. Panel finds independent expert reports more persuasive The panel considered whether the insurer could decline liability based on QA’s rebuttal, but was not persuaded this would be fair in the circumstances. QA was the repairer in 2013. It had denied faulty repairs in 2017 until directed to compete repairs by QBCC. It again denied issues with repairs after the complainant notified it of stalactites forming below the balcony and has now denied faulty workmanship causing further water leaks. QA’s reports are not independent reports. QA and the insurer say SB should not have disturbed the area. They say th is voided QA’s warranty when it did so and caused QA prejudice. QA says the complainant’s build er SB removed tiles and likely compromised the waterproofing. QA says it has been prejudiced as other trades investigated the issue and it was not invited to re-inspect the damage sooner. However, the insurer had the opportunity of having QA attend the property earlier. The complainant says the investigative work by SB was authorised in a telephone call with the insurer on 3 May 2021. The insurer was asked to provide a copy of that call recording. It has failed to do so. The complainant says SB was appointed after further water damage occurred. The insurer has not disputed this. There is no evidence the invasive testing by SB compromised the Determination | Case number: 892863 Page 4 of 9 waterproof membrane. The panel is persuaded the fault most likely existed prior to the invasive testing by SB. QA has pointed out cracks in the render of the upper floor of the property and a missing window as alternative explanations for the water damage to the kitchen window framing. There is no evidence of any damage occurring due to the private works undertaken at the home or while the window was being replaced. QA says the complainant had an obligation to complete further maintenance work which it was not satisfied had occurred. It is unclear how a failure to complete maintenance work has compromised the waterproofing. The panel is persuaded that the ongoing water damage was most likely caused by the faulty waterproof membrane and ongoing issues with the balcony repairs. QA is the only party arguing there were other causes. The panel is not persuaded the information provided by the insurer establishes a reason why this damage has occurred other than the work performed by QA failed within the builder’s warranty period. In the absence of another consistent and persuasive explanation, the panel is satisfied, on balance, the damage is due to faulty workmanship. Insurer to accept liability and settle complainant for subsequent loss The insurer is to accept liability for rectifying QA’s defective work. QA has already confirmed it declines to undertake any further work on the property. Regardless the complainant has made clear she no longer wants QA to complete the repairs. In the panels view, to resolve this dispute, the insurer should have SW obtain an actionable quote from a suitably qualified repairer to complete the rectification work as set out in the SOW. The SOW should include repair of any internal water damage caused by the faulty waterproofing. The insurer can then either have the builder complete the repairs or cash settle the claim. If the insurer intends to offer a cash settlement, then the insurer is to include a 10% contingency payment on top of the actionable quote for the transfer of risk to the complainant when completing the work. Loss of rental income only for period of the repair work The panel is satisfied the complainant should be reimbursed for loss of rental income but is not satisfied this should be in arrears. The reason for this is the property was under renovation work at the time the damage was discovered. Accordingly, the panel is not satisfied the reason the complainant was without rent was due to the defective work. Further, the leak does not appear to have rendered the property uninhabitable, meaning its impact on loss of rent is negligible. This said, repair of the balcony will cause substantial discomfort to anyone living in the property, and the panel is satisfied this will likely rise to the level of uninhabitable for the buildings intended purpose (i.e. generating rental income). Accordingly, if the insurer elects to complete the repairs it is to pay the complainant for loss of rental income while the repair work is under way, and for a period of four weeks after the repair, or until the property is re-tenanted, whichever is sooner. If the insurer elects to cash settle the repairs, then it is to pay the loss of rental income for the estimated repair period plus and additional period of four weeks to allow for the property to be re-tenanted. The Determination | Case number: 892863 Page 5 of 9 insurer does not need to include the uplift or interest payment when it settles this portion of the complaint. 2.2 Is complainant entitled to non-financial loss compensation? An award of non-financial loss is warranted Under AFCA’s rules, we may award up to $5,400 compensation for non-financial loss. We will only award this type of compensation where the complainant experienced an unusual extent of physical inconvenience, time taken to resolve the claim, or interference with their enjoyment of peace of mind, due to the insurer ’s handling of the claim. Having reviewed the available evidence, the panel is satisfied a substantial award of non- financial loss is warranted. This is because the complainant supplied a detailed account of the claim experience. It is clear from reading the evidence the insurer’s handling of the claim has led to substantial interference with her peace of mind. Further, the length of time taken to resolve the matter has been excessive with the complainant required to go to extraordinary lengths to prove the repairs were not completed to standard even after the QBCC found the original works were inadequate. This insurer then contributed to further delay in resolving the matter. It decided to accept the view the builder alleged to have incorrectly performed the work over two independent builders ’ opinions and evidence. Given the claim experience, the panel is satisfied an award of $4,000 is fair in these circumstances. The insurer is to pay this to the complainant within 14 of the complainant accepting this determination. 2.3 Why is the outcome fair? This is a fair outcome as the complainant is entitled to repairs which are successfully completed and free of defects. As the insurer has proceeded with the work through one of its authorised repairers with whom it has direct a relationship, it remains liable for the repair until the work is successfully completed and is free of defects. Further, it is fair the complainant receives compensation for the excessive difficulty experienced while pursuing their claim. Determination | Case number: 892863 Page 6 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 892863 Page 7 of 9 3.2 Expert evidence summary Record Key points Insurer’s builder ( Q A) Report 15 October 2019  visit carried out on 4 September 2019 to review work complet ed on 9 February 2018  efflorescence on the fascia tiles is not due to QA’s work  products used in the repair are fit for purpose  inspection found no evidence of structural movement, water entry or other defects  efflorescen c e prese nt is minor and cosmetic and should be resolved with regular cleaning and maintenanc e  QA believes close proximity to salt water environment and no roof protecting the deck surface from rain and dew i s contributing to efflorescence  AS 3958.1 2007 C2. 2 says efflorescence is caused by liquid water carrying soluble salts from below the tile to the surface  AS 3958.1 2007 C2. 2 explains the cleaning process for efflorescence  QBCC guidelines state calcification or efflorescence from a deck, balcony or wall occurring within 12 months of work being completed is a defect  QA does not accept the work performed was defective and notes a large uncovered hole in the external cladding above the deck from recent renovations has the potential to allow significant wat er entry into the wall cavity. Complainant’s builder (SB) Report 4 May 2021  found multiple water entry points compromising the balcony structure and allowing water into the building  most water seems to enter along the sheet joins and there is excessive move ment to the deck  original builder has not followed manufacturer technical specifications during construction  double joists not present at sheet joins  no back flashing on top of structural joists to stop water penetration  no evidence of expansion joints at the sheet joins required in the manufacturer specifications  balustrade fixing does not meet NCC requirements and does not have waterproof sealing to the feet  tile construction joints have not been installed to Australian Standard  recommends removing and replacing existing tiles, soffit and compressed sheet and correcting errors noted. Insurer’s building consultant ( SW ) Report 9 June 2021  water stains noted to the kitchen window frame  there are cracks in the patio waterproof membrane directly above the kitchen bulkhead at the wall and floor junction  balustrade fixings have penetrat ed and compromised the waterproof membrane Determination | Case number: 892863 Page 8 of 9 Record Key points  water drips off the patio edge tile strip forming stalactites on the bottom edge of the tiling which are not to Australian Standard 4 654.2  tile drip edge does not prevent water ingress to structural areas of the building  waterproof membrane needs to be replaced. Insurer’s builder (QA) Rebuttal letter 24 June 2021  QA does not accept liability for alleged faulty workmanship at the property  QA believes SW’s report is based on limited evidence and contains factually incorrect information  water leak to the kitchen ceiling however, no photos of this area or repairs noted in SW’s scope of work  upper storey FC sheets were cracking unrelat ed to QA work, in the wall lining on the balcony and QBCC has not held QA liable for this  signs external wall cracks have been sealed by others, there is a high chance of water entry during periods of wind driven rain because of the FC sheet cracking  SW ha s not performed a flood test to confirm leak via the balcony tiles  water staining may have occurred in 2013 or prior to rectification work in 2018  tradesmen are completing repair work in ‘unrelated areas’, however one of the images shows them working on th e balcony  tradesman on the balcony appear to be performing non - compliant work relating to a sliding door  photo of alleged cracking to waterproof membrane is a close up meaning QA cannot confirm its location  information about balustrade spigots not being no gged and have penetrated the waterproof membrane are not correct based on the photos in QA’s rebuttal letter  alleged patio tile edge defect is not applying the correct reference for the site application and the drip edge us ed is purpose built to meet compl iance  insufficient evidence the tile drip is leading to damage of structural members  stalactites confirmed as maintenance relat ed in the 2019 attendance indicating the complainant is still not maintaining the property  photos demonstrate the waterproof memb rane is continuous  QA does not agree with SW’s proposed scope of work even if it were accepting liability, which it is not. Insurer’s builder (QA) Rebuttal letter undated  QA believes SW’s report is not support ed by the evidence  complainant has engaged other builders to perform work around where they are now alleging there is defective work performed by QA Determination | Case number: 892863 Page 9 of 9 Record Key points  work has impacted the previous work and subsequently has voided the builders warranty QA was providing  SB did not notify QA of any leaks and has preju diced QA in determining causation by undertaking works without first allowing QA to inspect  SW confirms two skirting tiles have been removed by SB  QA says tiles removed by SB should be considered a major factor when considering liability for the leak  QA s ays SB confirmed on - site they removed t wo skirting and floor tiles  tiles are directly fixed to the wat erproof membrane  flood test did confirm a leak to the deck directly below the tiles SB removed  QA says the waterproof membrane was compromised at the time the tiles were removed by SB  QA says SW has made supposition about the installation of the FC sheets as it was a visual ins pection which could not see the FC sheet joins  QA says the FC sheets are installed consistent with the manufacturer specifications b ased on photo evidence  QA maintains the stalactites are a maintenanc e item rather than a compliance issue  QA maintains it work was complet ed compliantly and has not contribut ed to any of the current or alleged issues experienced at the property  QA maintains the builder’s warranty has been voided by work performed by others and declines liability and any further claims for the deck work.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.