Home / Hollard / Determination 891765

Determination 891765

Roof storm damage repairs defective; insurer required to replace roof and pay non-financial loss

FirmHollard
Decided2022-12-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's reinstated storm-damaged roof continued to leak after the insurer's builder's repairs. AFCA found the roof defective and ordered the insurer to replace it or cash settle, and to pay $2,000 non-financial loss.

The roof's defective workmanship and repeated temporary sealant repairs meant repair was not a reasonable remedy, so replacement was fair, and poor handling and delay warranted non-financial loss compensation.

Issues

Subjects and remedies

pay non financial lossreassess claimrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 891765 Financial firm Hollard Insurance Partners Limited Determination | Case number: 891765 Page 2 of 7 Case number: 891765 16 December 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under his home insurance policy. This is for the damage sustained to the roof following a storm event. The insurer accepted the claim and replaced the roof in 2020. The complainant is dissatisfied with the reinstated roof and says it is defective and has been leaking following heavy rains. The insurer disagrees and says the roof is functional and is not defective. The insurer seeks to undertake further assessments to the roof. The complainant disagrees and says the insurer failed to rectify the roof and seeks a replacement roof. 1.2 Issues and key findings Is the insurer required to replace the roof? Yes. The insurer is required to replace the roof as outlined in section 2 of this determination. Is the insurer liable for compensation? Yes. The insurer is required to pay the complainant $2,000 compensation in non-financial loss. 1.3 Determination This determination is in favour of the complainant. The insurer is required to replace the roof either by undertaking the reinstatement or cash settling the complainant as outlined in Section 2 of this determination. Determination | Case number: 891765 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer required to replace the roof? Insurer’s roof is defective There is no dispute:  the insurer replaced the roof in 2020 following a storm event  the first issues with the roof weather tightness and solar panel manifested December 2020  since the roof’s replacement there has been issues with ongoing water ingress  the property was constructed in 2018. The exchanged claims notes show a number of experts have attended the property to establish the extent of the water ingress and the rectification work required. In May 2022, the insurer engaged a building consultant (SD) to assess the quality of the work. In his report SD says:  there has been attempts to apply sealants around screw fixings under a bank of solar panels  there is over application of silicones and sealants to flashings on the upper roof level  the sky light flue has a lot of sealant around it. SD says since the roof’s in stallation there has been excessive reapplication of sealants. SD notes there is a gap in the lower level of the roof flashing above this location that has been filled with silicone. Importantly, SD says this is where there was previous water entry to the living room ceiling. I note the gap is significant. SD’s photos show the poorly finished corner flashing is where the water entry to the living room ceiling occurs. I further note the screw fixings are rusted. I also note the silicone has been applied over the rusted fixings. The photos also show the sealants and silicones have been applied throughout different areas in the roof. I accept the application of sealants is widespread. I note, SD suggests the solar panels configurations have changed since t he roof’s installation in 2020. There is no evidence that any configuration change is causative to the water ingress damage. The defects are more related and consisted with how the roof was constructed. I consider the sealants and silicones to be temporary measures to mitigate the ongoing water ingress issues. I am not satisfied it is an acceptable industry standard of repairs to the water entry points. I accept the sealants will eventually fail resulting in further water ingress, compromising the weather tightness of the property and resulting in further damage. It is not expected to have a newly constructed roof to be leaking to that extent of the excessive application of sealants. One expects to see this nature of measures in an old roof that has started to deteriorate, allowing water ingress into the property. I note SD’s findings are consistent with the complainant’s consultant (AB) findings. AB says the scribing to the flashing has not been cut flush to the roof sheets causing water ingress in heavy rains damaging ceilings below. AD notes some joints in the barge capping looks failed silicone and stain water is observed in the joints. Determination | Case number: 891765 Page 4 of 7 The roof has started showing signed of corrosion due to the water ingress. There is no information available to establish the best remedy for all the identified issues. The insurer is seeking to undertake further investigation by sending out another builder to confirm if a full roof replacement is required. The insurer had several opportunities to attend to the rectification work I am not satisfied the evidence shows the roof could be successfully repaired. There are gaps in the alignment of the roof sheets in numerous places as evident in the gaps under the flashing between the neighbouring townhouses. Further, it is unfair to leave the complainant in a position where temporary measures being the sealants are in place rather than having a roof that is weather tight and compliant with the industry’s best practices. Having reviewed the claim’s notes, I note by 24 F ebruary 2021 the fourth trade attended to undertake repairs and the solar panels were not functioning as expected given they were three years old at that point of time. In March 2021, parties agreed to have the original builder (JL) attend to undertake thermal imaging. The insurer explained it will be a final inspection to determine issue with solar panels. The insurer agreed to cover the damage to the solar system based on the complainant’s quote totalling $5,990.22. In April 2021 the insurer identified an issue with rubber seals and JL attended and rectified it. The exchanged evidence shows that in January 2022, the roof still leaks, and mould has manifested in the TV room. The insurer re-engaged JL to attend and assess the cause of damage. JL has attended the property and assessed the leaking roof on numerous occasions. Despite the insurer’s numerous repairs by applying the sealant, the roof is still showing water ingress issue. This is evident in both SD and AB reporting. I am not satisfied a further assessment is reasonable in the circumstances. The exchanged evidence is already showing significant issues with the roof resulting in water ingress. It is unclear what a further assessment will achieve. The insurer has assessed the roof on several occasions over the last two years and had ample opportunity to conclude its position. It is fair and reasonable the insurer replaces the roof I accept there are major issues evident in the replaced roof. I consider it is not reasonable to expect a new roof to continue leaking following heavy rains for approximately two years. It is clear that both the insurer and JL’s efforts to rectify the water ingress issues at different parts of the property has been fruitless. The exchanged information shows the complainant has worked with the insurer and JL to address all ingress issues. It is evident all the subsequent repairs carried out to the roof following it replacement are of temporary nature. I accept the roof is and will continue to leak and corrode due to the poor workmanship. The insurer seeks to undertake another assessment. I am not satisfied that this is a reasonable position and it is unfair to expect the complainant to tolerate this ongoing water Determination | Case number: 891765 Page 5 of 7 ingress issues. Whilst the insurer has met the internal damage however there is a potential risk of mould due to the ongoing leaks. I have carefully reviewed the exchanged evidence and I consider it is fair and reasonable in the circumstances the insurer replaces the roof. The insurer is required to either replace the roof or cash settle the complainant the fair and reasonable costs to replace the roof. The insurer is required to attend to the internal water ingress damage as outlined by SD and AB. 2.2 Is the insurer liable for compensation? AFCA can award compensation for non-financial loss AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interfere nce with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Amongst other things, the complainant says:  the insurer’s claims handling has put him under stress  the insurer failed to provide updates throughout the claim and finalise its position  he has spent significant amount of time on the phone trying to sort out the claim  the ongoing problems have impacted his day to day life. The complainant is entitled to $2 ,000 compensation The insurer offered the complaint $1,500 as compensation for the poor handling of the claim and the delays. Having reviewed the claim’s notes, I note  in April 2021, the insurer recognised that there were unnecessary delays and the claim is aged  there was a breakdown of communication between JL and the insurer resulted in delayed responses to the complainant’s queries and concerns  there has been no action from the insurer regarding the water ingress issues between July to October 2021  the complainant initiated the majority of the contact with the insurer to request an update on the progress of the claim. In some instances, his call would not be returned in a timely manner  the insurer has only engaged SD to address the water ingress issues in May 2022. Having carefully reviewed the exchanged evidence and the parties’ arguments, I am satisfied the complainant brought the water ingress issues to the insurer’s a ttention on numerous occasions. Determination | Case number: 891765 Page 6 of 7 I accept the insurer had several opportunities to assess the defective work and its liability. Further, I note each time the complainant brings the water ingress issue to the insurer’s attention the insurer re-engages JL. Whilst its reasonable for the insurer to do so given JL is the contracted builder, the insurer should have attended to the water ingress issue in a timely manner and carefully assessed JL’s work in light of the complainant’s concerns and comments. I accept the ongoing assessment and attendance form different contractors has interfered with the complainant’s enjoyment and peace of mind. In my opinion, the complainant and his family were inconvenienced by the continuous new water ingress issues. I am not satisfied the ongoing assessment and temporary measures i.e. applying sealants carried out by JL were reasonable. Further, the insurer should have been proactive in addressing the water ingress issue. The insurer is required to pay the complainant $2,000 in non-financial loss. 2.3 Why is the outcome fair? The exchanged evidence shows significant defective works to the roof. The insurer had numerous opportunities over the last two years to assess its liability and rectify the water ingress issue as a resul t of its builder’s defective work. Further, all the subsequent measures taken by JL are considered temporary in nature. The expert reports highlighted the issues however have not shown that the roof could be repaired successfully. Determination | Case number: 891765 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.