Determination 891518

Cyclone damage repairs and cracks; complainant sought cash settlement for building defects beyond the insurer's rectification offer

FirmSuncorp Group
Decided2023-06-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$100,000
SourceAFCA PDF

Summary

The complainant claimed for cracks in her cyclone-repaired home, which she attributed to defective repairs, and sought a cash settlement for rectification. AFCA found the issues stemmed from pre-existing construction defects and decided in favour of the insurer, finding its offer of $22,221.17 fair.

The complainant had the onus to show the damage was cyclone-related or caused by poor repairs, but the expert evidence showed pre-existing construction defects not covered by the policy, so the insurer's settlement offer was fair.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 891518 Financial firm AAI Limited Determination | Case number: 891518 Page 1 of 6 Case number: 891518 26 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy underwritten by the financial firm (insurer). She lodged a claim on or about 12 April 2021 for damage caused to the home due to the impact of Cyclone Seroja. The insurer accepted the claim. It arranged for a builder (KB) to conduct repairs to the property. Later, the complainant found cracks in the repaired area and notified the insurer. She believes the cracks were caused by defective repairs to the home. The insurer reviewed this damage and concluded it was mostly due to the way the building was constructed, not the repair work. It offered to rectify the repair issues but not the construction defects. The complainant has since left the home but remains dissatisfied with the outcome. She seeks cover to repair her home. 1.2 Issues and key findings Is the insurer liable for the building issues with the home? No. Outside of the offer made for the rectification of the work already done, the insurer is not liable for the balance of the claimed issues with the home. Is the insurer required to compensate the complainant? No. The insurer offered a $1,000 payment for non-financial loss compensation to the complainant. This is fair in the circumstances and it is not required to increase the offer. Why is the outcome fair? The exchanged material shows the insurer agreed to cover and repair the cyclone-related damage to the home. There are other issues related to the construction to the home, for which the insurer is not liable. Its offer to cash settle for the rectification repairs is fair as these cannot be done until the home’s issues are resolved. The insurer also offered to pay compensation and this offer was fair in the circumstances. 1.3 Determination This determination is in favour of the insurer. The insurer offered and is required to pay the complainant $22,221.17 in full and final settlement of the matter. This payment is inclusive of:  $18,453.19 quoted to resolve the rectification issues  $2,767.98 (a 15% contingency uplift) for the rectification work  $1,000 compensation for non-financial loss. If the insurer has already paid these amounts, it is not liable for anything else in relation to the complaint. Determination | Case number: 891518 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for the building issues with the home? No. Outside of the offer made for the rectification of the work already done, the insurer is not liable for the balance of the claimed issues with the home. Complainant unhappy with insurer’s failure to address repairs properly The insured property is about 15 years old. There is no dispute it was damaged by the cyclone or that the insurer agreed to cover this damage. Initial repairs were completed by KB. The complainant returned to the insurer after these repairs were done and informed it of new issues which she believes were related to poor repair work. She highlighted significant horizontal and particularly vertical cracks inside and out of the home. She worries these are indicative of structural damage due to defective work by KB. Given she has since left the home, the complainant wants the insurer to cash settle her for the rectification work. She estimates this could be as high as $100,000-$200,000. The insurer says the issues relate to the defective construction of the building. The complainant notes it is one of several identical buildings in the area and the insurer has paid a claim in full for at least one of these other homes. Insurer proposed a cash settlement to resolve the outstanding issues To the extent the complainant says the damage (and proposed rectification work) is cyclone- related or inadequate repair work by KB, she has the onus to prove this. Whilst the insurer covered damage due to the cyclone, it maintains the balance of the issues are:  related to the poor, inappropriate and/or defective construction of the home, and  exacerbation of the repaired damage caused by the home’s ongoing issues. Notwithstanding the above, the insurer agreed to cash settle the complainant to attend to the necessary repair rectification work. The insurer says it cannot undertake the repairs as significant building rectification work is required first and this is not related to the cyclone event. It says if the building work is not done prior to the repairs, the damage will reoccur. Building issues were highlighted prior to original repairs being undertaken An initial assessment of the home by the insurer’s internal assessor AC revealed: The customer has owned the house for approximately five years and has noted certain building defects and faults causing cracking and ingress. AC wrote that the home was made with a steel frame and lined with vertically installed fibro cement boards. This was causing cracking of the joins and movement issues. This damage was ‘not event related’. AC recommended the complainant retain a building contractor to address the issues. KB then prepared a scope of works and undertook repairs. Determination | Case number: 891518 Page 3 of 6 Insurer says the home’s construction is to blame for the new damage After the initial repairs were completed, the complainant found new cracks and reported this to the insurer. The property was re-inspected on 7 December 2021. Some of these cracks affected areas that had already been repaired. The complainant informed the insurer the building ‘shakes in the wind’. The insurer appointed structural engineer MC to review the damage. MC noted:  the original quality of the home’s stud framing is poor and causes excessive movement  sand has washed out from beneath the foundations, causing settlement cracks – this will continue until the home is stabilised  whilst walking aro und in the home, MC felt the ‘vibrations and sway in the structure’  exterior cracking is ‘typical’ where the blue board external cladding sheets join  the general downpipe design around the home is poor, draining water around the foundations. This has gradually destabilised the perimeter footings  the cyclone damage repairs were of good quality (better than the original construction)  cracks will continue to appear (even if the rectification work is done) as the cladding is ‘slid’ into framing grooves and this will always allow some movement internally and externally. MC further noted: The design of the panels makes it inherently difficult to construct/install cross- bracing to withstand winds, as required in the National Construction Code, because the sandwich panels make up the internal and external surfaces, (i.e., no space to hide the bracing). MC says this construction method is not appropriate for a home built in a high-wind area and close to the ocean. Movement and cracking would have been an ongoing issue since the home was built but was more noticeable after the cyclone. Complainant disagrees with the insurer and its experts The complainant says the panels removed from the home by KB (for MC’s consideration) were taken from the garage and not the home. She says this is important as the home has ‘steel tie down bars throughout’ and these were not present in the garage. No evidence was provided by the complainant to support this submission. The complainant notes the home was passed as fit by the Shire engineer in 2008. Eight homes of the same design were built by the same builder ‘using the same materials’. She did not obtain any expert evidence to contradict the findings of the insurer’s experts. Whilst she raised concerns that another home was covered for similar damage by the insurer, I can only review the damage relevant to this claim and this policy. Satisfied the home had pre-existing issues not related to the cyclone There is no dispute the complainant was provided with the policy documents. These consist of the Insurance Certificate and the Product Disclosure Statement (PDS). The PDS provides cover for a series of listed events. Included in this is cover for loss or damage caused by a storm. The policy defines ‘storm’ as: Determination | Case number: 891518 Page 4 of 6 a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust The complainant agreed with AC there were some issues with the home prior to the cyclone event. I acknowledge she was not necessarily aware of the full extent of these issues. MC’s evidence asserts the home was defectively constructed. Whilst it provided no evidence of a breach of applicable building codes, I accept the home is not as secure and stable as it should be. Whether defective or not. the home had issues present which pre-dated the cyclone event. There is no persuasive evidence these issues were caused by the cyclone or any other listed event under the policy, or that the insurer should otherwise be liable for them. There is a clear problem with the home’s construction, noting the parties accept it moves and sways in the wind. A well-built modern structure of this size should not do this. MC also noted sand had washed away under the foundations. It is not explicitly clear what the cause of this was. MC noted there was poor drainage and I accept this could have contributed. I also accept water from rain can cause the sand to wash away, over time. There is no suggestion (and no persuasive evidence) rainfall from the cyclone caused this issue. Given this, I accept the issues with the home (excepting the repaired areas) were caused by the building’s original construction. It is possible this was exacerbated by deterioration over time. These issues meant the insurer was unable to successfully repair the original cyclone damage. I accept it will not be able to properly repair this damage unless the original building issues are addressed. I further accept the insurer is not liable to address the other building issues. These issues pre- date the cyclone event and are not related to any other event under the policy. Insurer is not liable for the pre-existing issues I accept the insurer is liable for any cyclone damage to the property. It agreed to cover this. However, the need to rectify the initial repairs arose from the home’s defects, not the cyclone event, or any poorly completed repairs. Whilst I acknowledge the insurer arguably should not have attempted the repairs in the first place, I do not consider it bears any responsibility for the other issues at the home. The PDS says when the insurer accepts a claim and must repair a home with structural or design faults, it will: only pay you what it would have cost us to fix the damage from the incident covered by your policy or if we agree, you can pay us the extra amount it costs to rectify the structural or design fault at your home. I accept the construction of the home was deficient as a well-constructed property of this size does not sway or move in the wind. Whilst I am not satisfied the insurer has shown the building did not comply with relevant building codes, the parties accept there were issues present. This is apparent from the pre-repair reports, which reference discussions with the complainant and admissions of issues with the home. Determination | Case number: 891518 Page 5 of 6 These issues mean the insurer’s ability to repair the home is compromised. The exchanged material does not show the movement issues are related to the claimed event. They are related to the building’s construction. Therefore, I accept the insurer is not required to undertake the required work to repair the building. Insurer’s settlement offer for the clai m is fair The insurer says it offered the complainant $18,453.19 plus a contingency uplift of 15% to address the rectification work related to the original repairs. The contingency uplift compensates the complainant for the transfer of risk for the work and for the loss of a lifetime guarantee. The complainant offered no evidence to show this offer was unreasonable or unfair. Given this, I am satisfied the insurer is entitled to rely on this offer as its settlement. I accept the insurer is not required to pay any further contribution to the damage. 2.2 Is the insurer required to compensate the complainant? No. The insurer offered a $1,000 payment for non-financial loss compensation to the complainant. This is fair in the circumstances and it is not required to increase the offer. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer’s payment of $1,000 for non -financial loss compensation is fair The insurer acknowledges its handling of the matter did not meet the complainant’s reasonable expectations. In consideration of this, it offered to pay $1,000 compensation for non-financial loss. It says there were ‘opportunities to better manage the claim’ and paid the above amount to the complainant to compensate her for her experience. No specific concerns were raised by the complainant about the insurer’s conduct. On balance, I am satisfied the insurer’s offer is fair. It is not required to pay any additional compensation. Determination | Case number: 891518 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.