Home / Hollard / Determination 891209

Determination 891209

Cash settlement amount for storm damage to building was too low; non-financial loss and professional costs

FirmHollard
Decided2023-03-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$82,749
Non-financial loss$5,400
Amount claimed$550,000
SourceAFCA PDF

Summary

The complainant disputed the cash settlement for storm and flood damage to her home. AFCA required the insurer to increase the building settlement based on her builder's quote plus a 20% contingency, pay interest, remediate mould, pay $5,400 non-financial loss and contribute $825 to engineering costs, but rejected total loss, upgrade and extra accommodation claims.

The insurer failed to consult properly before cash settling and omitted contingencies, so it was fair to rely on the complainant's builder's quote plus an allowance, while the policy did not cover upgrades or a total loss.

Issues

Subjects and remedies

disabilityhome or building damagemental healthnatural disasterpay claimpay compensationpay interestpay non financial lossrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 891209 Financial firm Hollard Insurance Partners Limited Determination | Case number: 891209 Page 2 of 8 Case number: 891209 3 March 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy (policy) with the financial firm (insurer) and lodged a claim on 7 March 2022 for storm related damage to the insured property. The insurer accepted liability the claim and issued cash settlements on 12July 2022 for $11,734.41 total loss of contents and 19 July 2022 for $127,327.19 for building damage. The complainant disagrees with the cash settlement and says it she was given incorrect and misguided information which has placed her in a worse financial position and caused considerable stress and anxiety. 1.2 Issues and key findings Is the insurer required to increase its settlement offer? Yes. The insurer is to increase the total cash settlement for the building to $209,251.08 as set out in section 2.1 of this determination. Further the insurer is to arrange to attend the property to complete any necessary mould remediation. Is the complainant entitled to compensation for non-financial loss and professional costs? Yes. The complainant is entitled to compensation for non-financial loss of $5,400. The insurer should also contribute $825 to the costs incurred in obtaining the engineering report from BE. Why is the outcome fair? The panel is satisfied the insurer failed to properly consult with the complainant prior to the original cash settlement or include an allowance for contingencies recognised by the insurer ’ s builder. In the circumstances it is fair to rely on the quote from the complainant’s builder BP to settle the loss plus a contingency allowance. The complainant was clearly a customer experiencing vulnerability. There is no evidence that the insurer recognised this or provided extra care as required. An allowance of $5,400 for non-financial loss is fair in the circumstances. 1.3 Determination This determination is in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the insurer is to pay the complainant:  $5,400 non-financial loss compensation plus $825 as contribution to professional costs  $81,923.89 (the outstanding balance of the cash settlement), plus interest under section 57 of the Insurance Contract Act (ICA) from 4 December 2022 to payment of the claim. The insurer must arrange a suitable time for its mould remediation expert to attend the property and complete any necessary mould remediation. Should the parties not be able to agree on a suitable time the insurer can cash settle the mould remediation. Determination | Case number: 891209 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer required to increase its settlement offer? Yes. The insurer is to increase the total cash settlement for the building to $209,251.08 as set out in section 2.1 of this determination. Further the insurer is to arrange to attend the property to complete any necessary mould remediation. Circumstances of claim The complainant held a home and contents insurance policy with the insurer covering contents for $10,000 and building for $550,000 against a series of listed events including flood and storm. The policy commenced on 27 February 2022. Following heavy rain in March 2022 water and sewerage seeped through the rear of the complainant’s house inundating the entire house. Damage was identified by the insurer ’ s technician RS, at the home on 8 April 2022, to the floor, cabinetry, carpets, furnishings and wall linings. The damage was classified as Cat 3 -grossly unsanitary and the property unliveable. Mould was also identified in the complainant’s bedroom. The insurer ’s builder ‘CS’ inspect ed the damage on 27 April 2022. CS provided a scope of works and quote for repairs of $127,327.19 on 6 June 2022. The insurer subsequently made a cash settlement on 12July 2022 of $11,734.41 for total loss of contents. On 19 July 2022 the insurer paid $125,827.19 for building damage. The payment was made pursuant to the insurer’s builder ‘CS’ quote and includes a deduction for a prior emergency payment of $1,500 issued to the complainant around 23 June 2022 . The panel accepts the insurer’s entitlement to a deduction of th e $1,500 emergency payment. The complainant is dissatisfied with the quantum of the settlement and seeks either:  a total loss payment under the policy; or in the alternative  policy cover for drainage system upgrades to prevent the possibility of future floods  a cash settlement pursuant to her builder’s ‘BP’ quote  additional accommodation benefit  compensation for claim management and indirect financial loss. Property not a total loss The panel understands the complainant says (amongst other things) that the insurer is required to make a total loss payment of $550,000. Notwithstanding the certificate of insurance (COI) shows the building is insured for $550,000, the panel does not accept the building is a total loss. The available information does not show the cost of the repairs exceeds $550,000 or that the building damage is non-repairable. There is no indication the flood related damage cannot be repaired. The insurer appointed builder CS quote for repairs totals $127,327.19. The complainant ’s appointed builder BP combined quotes for the building repairs ($174,375.90) and external maintenance/upgrades ($19,308.30) totals $193,684.20. BP in an undated letter that says the house may be a write off. This assessment is based on the work/cost that will need to be conducted to prevent this house from flooding again. This does not alter the panel’s view. Even if the panel was to accept the insurer is liable for the costs required to upgrade the building’s drainage system (which it does not) , the exchanged information shows the total repair cost does not exceed the building sum insured. Determination | Case number: 891209 Page 4 of 8 The panel does not consider the complainant is entitled to a total loss payment under the subject claim. Insurer not required to cover property upgrade related works The complainant seeks cover for the cost required to construct a water retention/diversion retaining wall and additional drains to drain excess water from the property to prevent flooding in the future. In support, the complainant relies on a quote issued by her builder BP. The quote totals the sum of $19,308.30. The policy covers damage caused by the insured event(s) listed under the product disclosure statement (PDS). It does not cover upgrades and/or improvements to the insured property to prevent future loss. The panel does not consider the complainant is entitled to the property upgrades ($19,308.30) listed under BP’s quote . Insurer did not properly consult with complainant prior to cash settlement The panel is not satisfied the insurer met its obligation under the policy wording when cash settling the claim in July 2022. At page 61 of the policy ‘ How we settle a claim' the wording states 'in consultation with you' (as to whether repair or cash settle). This requires a discussion and consideration of opinion. It appears that the insurer simply provided a cash settlement fact sheet (CSFS) and cash settled following the c omplainant’s request. The panel is concerned at the level of consultation. The complainant says when first told of a cash settlement she was under the impression she was covered for a total loss. When the insurer offered her the settlement she advised it was not enough to complete the repairs or flood proof her home. There is no indication in the material exchanged that the insurer consulted with the complainant. There is no information that the insurer explained the limitations on the quote provided by CS or asked the complainant to obtain her own quote. The contents CSFS sent on 13 June 2022 describes the settlement as "cas h settlement for full settlement of the above Home claim". It is only by reviewing the table overleaf that one can ascertain that, in fact, only the contents claim is being settled. The building CSFS is confusing . The dollar figure for the total sum insure d in the box at the top left of the first page of the CSFS, above the heading "Cash Settling Your Claim" and the text "Based on our discussions and the policy terms and conditions, we are offering you a cash settlement for full settlement of the above Home claim..." . No wonder the complainant thought it was the full $550,000. T he actual amount being paid is only disclosed on the following page. The panel is also concerned that the CSFS does not clearly set out th e rights to have the payout reviewed. A stressed and vulnerable consumer is not likely to understand the rights of review despite accepting an offer. Insurer should increase cash settlement based on BP’s quote Several consultants were appointed by both the insurer and the complainant to attend to the insured property and asses the cause and extent of the claimed damage. Determination | Case number: 891209 Page 5 of 8 The insurer appointed builders ‘RS’ and CS, while the complainant appointed builders ‘BP’ and ‘R’ and an engineer ‘BE’ to assess the dama ge and issue reports. Their relevant findings are detailed under section 3.2 of this determination. The insurer and the complainant also arranged for builders CS and BP to issue scope of works (SOW) and estimates/quotes to repair the claim related damage. The panel notes the quotes provide for similar repairs. The quote and SOW from CS is dated 6 June 2022. The SOW from CS recognises it cannot predict damages from soil retraction during the prolonged drying out period, ongoing increases in material costs and likely asbestos, lead paint and other hazardous materials being present given the age of the building. No allowance has been factored into the insurer ’ s offer to cover this. The quote and SOW from BP is dated 4 November 2022. The insurer has not responded to the quote. RS reported water damage issues were affecting the sub-floor and wall lining. BE reported possible plumbing leaks. Mould was also found to be present. The complainant says the mould has not been remediated and continues to grow. Considering the above the panel considers it fair to rely on the SOW and quote from BP (excluding the drainage works) when cash settling the claim. BP quoted $174,375.90 for the building damage. It is fair that an uplift of 20% ($34,875.18) for contingencies be allowed given the reservations expressed by CS. This brings the total payment to $209,251.08. The insurer has already paid the complainant $127,327.19 for the building damage (less the emergency payment). The insurer must pay the balance ($81,923.89) in settlement of the claim within 14 days of the complainant’s acceptance of this determination. Interes t should be paid under section 57 of the ICA from 4 December 2022 (being the date to which the quote from BP was valid) to date of payment of the claim. As the mould remediation has not been completed by the insurer, it must also arrange a suitable time for its mould remediation expert to attend the property and complete any necessary mould remediation. Should the parties not be able to agree on a suitable time the insurer can cash settle the mould remediation subject to an actionable quote being provided by its mould remediation expert. Complainant is not entitled to an additional accommodation benefit The policy entitles the complainant to alternative accommodation cover for a period of up to 52 weeks. The complainant says the insurer should be liable for additional accommodation benefits. The complainant did not provide any material to support her claim. The policy clearly limits cover for temporary accommodation to a maximum of 52 weeks. While the complainant may not have started repairs, the panel is satisfied the complainant could have, with the settlement monies already paid, have restored the house to a liveable condition within the 52-week period. In the circumstances the panel accepts the insurer is entitled to limit its liability for temporary accommodation to 52 weeks as per the terms of the policy. Determination | Case number: 891209 Page 6 of 8 2.2 Is the complainant entitled to compensation for non- financial loss and professional costs? Yes. The complaint is entitled to compensation for non-financial loss of $5,400. The insurer should also contribute $825 to the costs incurred in obtaining the engineering report from BE. AFCA can award limited compensation Under the AFCA Rules, we can award compensation of up to $5,400 for non-financial loss if a complainant suffered an unusual degree of physical inconvenience, or time taken to resolve a situation or interference with the expectation of enjoyment or peace of mind Complainant suffered an unusual degree of inconvenience and stress. The complainant lodged a claim on 7 March 2022. The claim file notes confirm the complainant was advised via SMS regarding RS’ engagement on 18 March 2022. RS attended the property on 8 April 2022 and issued a report on 29 April 2022. The complainant was not provided temporary accommodation until 8 April 2022. The insurer knew or ought to have known the complainant was a vulnerable person with children including a child with disability. She was living in a water damaged home with mould present for over a month. Initially the accommodation provided was in corporate apartments. This was not suitable for the complainant’s family . The insurer did not complete the make-safe works or remediate the mould despite being aware of its presence. It has not explained why this occurred. These issues combined with the insurers failure to properly engage with the complainant as highlighted in section 2.1 of this determination have caused the complainant an unusual degree of physical inconvenience and stress. The panel acknowledges the event was catastrophic effecting many thousands of people and the pressure that was on the insurance industry to respond to the event. The panel accepts some delays were inevitable. Nevertheless, the panel is satisfied the complainant has suffered an unusual degree of physical inconvenience and stress as a result of the insurer’s claims handling. Compensation of $5,400 for non-financial loss is fair in the circumstances. Insurer to contribute to professional costs incurred. Under AFCA rule D3.5 AFCA may determine that an insurer contribute up to $5,000 to professional costs incurred by a complainant during the course of a complaint. During the claim process the complainant engaged an engineer to attend to the property and provide comment on the stability of the soil/level survey post the flood. As a result, the complainant incurred the cost of $825. While the insurer says the report adds no value to the claim decision and was not otherwise required, the panel considers the report assisted in understanding the extent and cause of damage. The complainant had lost faith in the insurer’s claim handling process and acted on the recommendations of RE when she engaged engineer BE to assess the damage. The panel also accepts BE’s engagement is reasonable considering the nature of the event and the fact the property remains moisture effected. In the circumstances the insurer should Determination | Case number: 891209 Page 7 of 8 contribute $825 to the complainant’s professional costs incurred in obtaining the report from BE. 2.3 Why is the outcome fair? This outcome is fair because both parties have had the opportunity to provide information to support their position. Accordingly, all the available material has been considered and the outcome is in line with AFCA’s approach to these t ypes of matters and what is fair under the circumstances to both parties. The panel is satisfied the insurer failed to properly consult with the complainant prior to the original cash settlement or include an allowance for contingencies recognised by the insurer ’ s builder. In the circumstances it is fair to rely on the quote from the complainant’s builder BP to settle the loss plus a contingency allowance. The complainant was clearly a customer experiencing vulnerability. There is no evidence that the insurer recognised this or provided extra care as required. An allowance of $5,400 for non-financial loss is fair in the circumstances. Determination | Case number: 891209 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive insurance experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.