Home / Allianz Australia / Determination 890455

Determination 890455

Storm damage to roof claim declined as gradual deterioration; internal damage settlement disputed

FirmAllianz Australia
Decided2023-02-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$32,383
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home suffered storm damage in February 2022 and the insurer declined the roof replacement as gradual deterioration while disputing the internal damage settlement. AFCA found the roof was most likely damaged in the storm, ordered cash settlement of the roof and increased internal damage payment, plus interest and $1,000 non-financial loss.

Insurer bears onus to establish an exclusion for gradual deterioration or lack of maintenance once the insured shows the loss falls within storm cover; the insurer failed to do so.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 890455 Financial firm Allianz Australia Insurance Limited Determination | Case number: 890455 Page 2 of 7 Case number: 890455 3 February 2023 1 Determination overview 1.1 Complaint The complainant holds a Home and Contents Insurance policy with the financial firm (insurer) and lodged a claim for storm related damage to the building following a severe weather event from 22 - 27 February 2022. The insurer accepted liability for interior water damage to the building but declined the claim for damage to the roof. The insurer says there is no evidence of storm damage to the roof but rather the damage is due to gradual deterioration and lack of maintenance which is excluded from cover under the terms of the policy. The complainant disputes the settlement offer for the internal damage and the denial of the roof damage claim. The complainant seeks the costs of replacing the roof plus payment for the internal damage including mould remediation and damage to the walls of the storage room. 1.2 Issues and key findings Is the insurer entitled to decline the claim for replacement of the roof? No. I am satisfied the available information establishes that roof was damaged during the storm and now requires replacement. The insurer can cash settle the replacement of the roof for $32,105.70, based on the quote provided by the complainant of $27,918 plus a 15% uplift ($4,187.70). Is the insurer’s settlement of the internal damage fair ? No. The insurer should increase the offer to settle the claim for the internal damage to $6,383.52 as set out in section 2.1 of this determination. Is the complainant entitled to compensation for non-financial loss? Yes. I am satisfied based on the available information that the complainant has suffered an unusual degree of inconvenience as a result of the insurer’s claims handling and in the circumstances consider compensation for non-financial loss of $1,000 fair. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the insurer is to pay the complainant:  $32,105.70 being to the cost of the roof replacement  If it has not already done so, pay $6,833.52 for the internal repairs  Interest on the outstanding cash settlement pursuant to section 57 on the Insurance Contracts Act 1984 (Cth) from 6 October 2022 to date of payment of the claim  $1,000 compensation for non-financial loss pursuant to AFCA Rule D3.3. Determination | Case number: 890455 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer entitled to deny liability for the replacement of the roof? No. The insurer is required to settle the complainant’s claim for the replacement of the roof in accordance with the terms of the policy. The insurer may cash settle the claim based on the quote obtained by the complainant for a total of $32,105.70 inclusive of the 15% uplift to cover any contingencies. Complainant has the initial onus to establish the claim falls within the terms of the policy It is accepted insurance law that an insured has the initial onus to prove, on the balance of probabilities, (that is more likely than not), that the loss or damage claimed falls within cover provided under the terms of the policy. Once established, the onus then shifts to the insurer to prove the loss falls within an exclusion provided under the terms of the policy. The complainant’s Home and Contents policy provides cover for a series of insured events including storm, subject to various conditions and exclusions. The insurer does not dispute that the complainant’s home suf fered storm related damage. The insurer has accepted liability for the interior damage but declined liability for the damage to the roof. The insurer says there is no evidence of storm damage to the roof. The insurer says the roof damage is due to gradual deterioration and lack of maintenance which is excluded from cover under the terms of the policy. Insofar as the insurer relies upon the exclusions contained within the terms of the policy it must establish, on the balance of probabilities, that the loss or damage is caused by gradual deterioration or lack of maintenance. Expert reports differ as to causation The insurer obtained a report from its builder (AN) dated 5 May 2022. Handwritten notes included in the report indicate a site inspection occurred on 31 March 2022. The site inspection identified:  roof sheeting in poor condition with all the screws rusted out  two roof valleys rusted out  gutters rusted  dry pan rusted  ridge caps lifted. AN concludes that the constant severe wind and rain has caused the roof capping to shift allowing water to enter through the roof. This has loosened the sheeting allowing water to enter through the roof. This has loosened the sheeting that is fastened below the capping and allowed water to capillary react into the edgings and cause extensive damage to the ceilings. AN noted that the roof did not comply with the manufacturer’s recommendations. The home is approximately 50 years old and there is no evidence provided of the relevant manufacturing recommendations at the time. While it may not comply with current standards there is no evidence that the roof was not compliant at the time of its build. There is no evidence in the report that the roof was not structurally sound prior to the event or satisfactorily performing its function. Determination | Case number: 890455 Page 4 of 7 Photographs accompanying confirm the roof is an old asbestos roof, although there is no obvious damage other than the lifted ridge capping and rusted valleys. The photographs show roof fastening in place, albeit with surface rust. There is no evidence in the report of previous water leaks through the roof and no evidence of leaking valleys or roof capping. The photographs The complainant provided a building report on 4 October 2022 from (CB). CB noted there was no signs the asbestos roof sheeting was in poor condition. Underneath the roof there was dirt and mildew but there were no signs of deterioration. CB disagreed there were insufficient fastenings and considered the current fit tings consistent with the manufacturer’s requirements. Insofar as current building standards were to apply, CB noted that asbestos sheeting is no longer used. CB identified screw capping’s had rusted and were showing signs of age but had not been compromi sed. In CB’s view high winds had lifted the capping and pushed water under the ridge capping and over the back of the roof sheeting. Most likely roof damaged during storm Whilst I accept the insurer’s position that the roof is 50 years old and may not be compliant with current building standards, I do not accept the insurer’s view that the roof was not damaged in the storm or that the current condition of the roof is due to gradual deterioration or lack of maintenance. The evidence from the insurer’s own e xpert, AN and from CB is that the storm had caused the roof capping to shift. I accept that there is a real risk the movement of the ridge capping and roof sheeting caused the roof to become friable, compromising the condition of the roof. Once the roof condition is compromised I accept that as an asbestos roof it needs to be replaced. No evidence has been provided to dispute this. The insurer has suggested that the wind gusts may not have been sufficient to have damaged the roof. I do not accept this. BOM data indicates the complainant’s home was under immediate threat of the thunderstorms impacting the area with heavy rain and high winds. While the winds may not have been extreme, it is clear from the report of AN that the severe wind and rain was a cause of the ridge capping shifting. I am satisfied the available information establishes that most likely the roof was damaged during the storm. I am not satisfied the insurer has established that the damage identified to the roof and requiring the replacement of the roof was caused by gradual deterioration or lack of maintenance. Insurer is liable under the terms of the policy for the roof replacement As the insurer has not established a relevant exclusion applies, I am satisfied the insurer is liable to meet the complainant’s claim for the replacement of the asbestos roof in accordance with the terms and conditions of the policy. The complainant has provided a quote from CB dated 3 October 2022 for the replacement of the roof in the sum of $27,918. The insurer has not disputed this quote or provided its own quote. It is fair in the circumstances that the insurer cash settles the complainant’s claim for the replacement of the roof based on CB’s quote of $27,918. The insurer should include an uplift of 15% ($4,187.70) to cover contingencies that may arise, bringing the cash settlement of the roof claim to $32,105.70. Interest on the cash settlement is payable in accordance with Determination | Case number: 890455 Page 5 of 7 section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 6 October 2022 to date of payment of the claim. 2.2 Is the insurer’s settlement of the internal damage claim fair? No. The insurer should increase the offer to cash settle the internal repairs to $6,383. 52. The insurer has accepted internal damage There is no dispute that the insurer has accepted liability for the internal damage to the home. The insurer obtained a quote to complete the internal repairs of $4,037.89. It declined the claim for damage to the carpets as carpet damage is not covered under the building insurance. Carpet damage is covered under contents insurance which was not held by the complainant at the time of the loss. The insurer has subsequently increased the offer to $4,441.68 for the internal damage to include a 10% uplift to cover contingencies. The complai nant, in rejecting the insurer’s offer for the internal damage seeks to include damage identified to the storage walls as quoted by CB. The insurer does not dispute that there is damage to the storage walls or that this was caused during the storm. The quote provided by CB includes an estimate for the mould removal to the rooms on the bottom floor and painting as required of $1,513. This would cover the damage to the storage wall. In the circumstances I consider it fair that the insurer increases its offer to settle the internal repairs as follows: Item Amount Ceiling damage $4,037.89 Mould removal and painting of storage walls $1,513.00 Total $5,550.89 Uplift of 15% for contingencies $832.63 Total $6,383.52 I am informed by the complainant that the insurer has now paid the complainant $6,105.98 in settlement of the internal damage. The insurer is to cash settle the complainant the balance of the $6,383.52 ($277.54) for internal damage and pay interest in accordance with section 57 of the Act from 6 October 2022 to date of payment of the claim. 2.3 Is the complainant entitled to compensation for non- financial loss? Yes. I am satisfied the complainant is entitled to compensation of $1,000 for non-financial loss is fair in the circumstances. Determination | Case number: 890455 Page 6 of 7 AFCA can award compensation for non-financial loss Under the AFCA Terms of Reference AFCA can award compensation of up to $5,400 for non- financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve a situation. Delay has caused an unusual degree of physical inconvenience and stress. The complainant’s property was damaged in February 2022. The claim was reported to the insurer on 11 March 2022 and AN attended the property to complete the make safe on 31 March 2022. The insurer’s loss assessor, (C) first reported on 5 April 2022 that the damage was due to heavy rain and runoff. A make safe report was provided by AN on 5 May 2022 although it appears this was not provided to the in surer by the insurer’s assessor, C until a second report was provided on 17 June 2022. No explanation has been provided for this delay. The insurer’s internal notes indicate that on 26 May 2022 the complainant had notified the insurer he did not agree with the assessment by C. The insurer did not complete its internal dispute resolution process until 19 July 2022. I note in the IDR the decline includes references to poor workmanship. There is no evidence of poor workmanship and as indicated, no evidence the construction of the roof did not comply with the relevant standards at the time of construction. The insurer now says it did not decline the claim because the roof did not meet relevant codes. In my view the insurer’s assessment of its own reports and handling of the claim has caused an unusual degree of inconvenience for the complainant. It has required the complainant to obtain his own expert report to support his claim. In my view it is fair in the circumstances that the insurer pays the complainant compensation of $1,000 for non-financial loss. 2.4 Why is the outcome fair? There is no dispute that the complainant had been provided with the relevant policy documents or the terms and cover provided under the terms of the policy. The available information co nfirms that over the time in question the complainant’s property was subject to a severe weather event including thunderstorms and the reports provided confirm this resulted in damage to the roof, being movement and shifting of the roof capping, which is likely to have compromised the asbestos roof. The outcome is fair as the policy provides cover for loss or damage caused by storm. I am satisfied that the complainant has been able to establish that most likely, the internal and roof damage was caused by the storm. The evidence presented by the insurer is not sufficient to establish the application of a relevant exclusion. Determination | Case number: 890455 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.