Home / Suncorp Group / Determination 889815

Determination 889815

Insurer limited liability for storm damage, declining subfloor and pier damage as long-term and disputing scope and cost of repairs and make safe invoice

FirmSuncorp Group
Decided2023-03-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,220
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainant's storm damage claim was accepted by the insurer but it declined subfloor and pier damage as long-term. AFCA upheld that decline but required the scope of works be amended with missing items, a 15% contingency added, and the make safe invoice partly reimbursed with interest.

Expert evidence of packing, moss and efflorescence showed the subfloor damage was long-term rather than storm-caused, but the insurer's scope omitted some storm-related items and make safe costs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 889815 Financial firm AAI Limited Determination | Case number: 889815 Page 1 of 6 Case number: 889815 31 January 2023 1 Determination overview 1.1 Complaint The complainant lodged a claim on 12 March 2022 under his home and contents insurance policy with the financial firm (insurer). This was for damage to his property due to a storm event said to have occurred on or about 8 March 2022. The insurer accepted the claim. However, it has limited its liability to damage it accepts to be consistent with the insured event. The complainant is dissatisfied with the insurer’s assessment of its liability and seeks further cover under the claim. 1.2 Issues and key findings Is the insurer’s assess ment for the damage fair? Mostly. The insurer’s assessment missed some items which should be included. The insurer should also contribute to some of the make safe costs being claimed. Therefore, the insurer should settle the claim in the manner set out in section 2.1. 1.3 Determination This determination is mostly in favour of the insurer. The insurer should settle the claim in the manner set out in section 2.1. Determination | Case number: 889815 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s assessment for the damage fair? The policy is an insured events contract of insurance The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid (or prima facie ) claim. The policy covers the insured property against loss or damage caused by one or more the listed insured events, including storm, during the period of insurance. There is no dispute the complainant’s home suffered damage because of a storm on 8 March 2022. Storm is an insured event under the policy. However, the parties dispute whether this event caused all of the damage claimed. The complainant must be able to show the disputed damage was caused by the storm. Reports indicate damage to the subfloor and piers to be long term There is no dispute storm water has entered through the roof or the house suffered water damage. This includes damage to several parts of the house. The insurer has accepted liability for the resultant damages to the property and contents. It has cash settled the complainant for the contents damage. The insurer has made an offer for the property damage. The insurer has declined cover for damage to the subfloor area and piers. The insurer said this is due to long term issues and not caused by the storm. The complainant denies any pre-existing and long-term issues with the house. He says the insurer’s assessment of the subfloor and piers is incorrect and this damage should be covered. He says the insurer has failed to consider the damage report from his engineer (GCE). GCE concluded:  external review shows heavy scouring and erosion of garden and foundation materials from flowing water  the brick retaining wall to the west shows a major tilt and a horizontal crack protruding approximately 10mm  the retaining wall has failed and poses a significant risk of collapse causing potential further asset damage to the downhill neighbouring properties  existing drainage appears to be installed correctly to a good standard but has failed due to rainfall  masonry piers below the house are moderately tilted  flooding water has scoured out beneath the masonry piers  the stability of these piers cannot be assured under their current loading conditions  temporary propping has been installed as a make safe option. The complainant also provided a drainage report from AC which states in summary: In conclusion, we feel there is now sufficient drainage around the house to protect the ground floor of this property. Given the work that has been done, it is clear to Determination | Case number: 889815 Page 3 of 6 us that the flood damage to the structure of the property, was caused by the previous drainage failing due to the sheer volume of water from the storm cell on the 8 th of March. Conversely, the insurer says it is not responsible for the damage to the subfloor piers and relies on its expert report by JHA. During inspection, JHA noted the following:  subfloor displayed significant efflorescence and dampness  the piers appeared to have eroded  packing was identified between stumps and bearers that pre-existed the event  water staining to bearers was also noted  the site displayed inadequate arrangements for surface drainage  dampness and moss/mould growths were noted specifically on the left-hand side of the property  the surface is graded toward the dwelling, allowing water to pond and seep into the ground and possibly enter the subfloor. JHA also noted that the interior of the dwelling was undergoing renovation works, as some of the building elements have been removed by the insured. In addressing causation, in summary, JHA says a level survey taken within the dwelling indicates evidence of long-term differential foundation settlement due to the presence of reactive clay founding soils and influence of tree roots within the footing and slab. JHA says this has been exacerbated by poor site drainage. JHA says due to no stormwater drainage system being in place, extensive soil erosion has occurred in the dwelling sub-floor. It says this is a long-term issue stemming from non- compliance of the drainage system. It concludes that the erosion and movement damage to the subfloor piers are not considered to have been caused by a single storm event on 8 March 2022, rather due to long-term processes. Subfloor is not covered Having carefully considered the expert evidence, as well as all the other information, I note the following. Of significance is JHA’s identification of packing between the stumps and evidence of long- term water entry. This included moss/mould growth to elements and significant efflorescence in the floor. This physical evidence is consistent with pre-existing issues with the piers and subfloor. It is also consistent with the floor variation of 67mm. GCE’s evidence about the drainage being adequate is not persuasive given there is no detail supporting this conclusion. Regarding AC’s testing , no videos or photos were provided to confirm the results. Further, neither AC nor GCE talk about the drainage arrangements in place to protect the subfloor. Given the slope of the surrounding ground, and JHA’s observations that there was inadequate drainage and grading, AC’s report is inconsistent with this. Further, AC’s conclusion is inconsistent with the physical evidence that there are pre - existing issues with the subfloor (e.g. packing, moss/mould and efflorescence). Determination | Case number: 889815 Page 4 of 6 Given all this, I am not persuaded the available information shows the damage was caused by the claimed storm event. Instead, the damage is consistent with long term issues related to site drainage and nearby trees. Therefore, the insurer is not liable for the damage to the subfloor. This includes the piers. Insurer’s offer is missing items The insurer has made an offer based on two scopes of works and quotations from J dated 9 December 2022:  one for $28,901.40 for repairs J is willing to undertake  another for $11,350.28 for cash settlement as J is unable to warrant the repairs due to pre- existing conditions. The complainant, in his email dated 12 December 2022, raised various concerns with this offer beyond the subfloor. This includes the following:  the scope of works does not reflect the cost of materials and works – for example, his quotes were around $5,000 each for the costs of floating floor and joinery but J’s quoted amounts were substantively less than this  the scope of works is missing the following items: > repair and replacement of the floating floor at front door entrance > front door to ground floor area > remove and replace sliding door unit to bathroom > render and paint external brickwork once it is replaced > any other external damage caused by works  the make safe invoice he incurred remains unpaid The insurer has provided an email from J confirming the quotes are actionable and current. Whilst the complainant questioned this given he is also a builder, there is no basis to conclude J’s evidence is false or it could not do the work for the amounts offered. For the other items, the insurer has not provided a submission addressing this. Having reviewed the two scopes of works, it does not appear these items have been included. Given the complainant’s position has not been refuted by the insurer, then the scope of works should be amended to address these items. This excludes the last bullet point which will be addressed in the contingency and discussed later. For the make safe invoice, the insurer did not make a specific submission on this to AFCA. I do note the insurer sent an email dated 28 April 2022 indicating the invoice appears to be maintenance work. This was supported, to an extent, in a subsequent assessor’s report done the following day. In reviewing the make safe invoice, I note it was done by the complainant’s building c ompany and included the following items: 1. cleaning and removing of existing floating floor 2. concreting of existing flooring where it has been undermined by flood 3. waterproofing of subfloor masonry and footing 4. clearing, cleaning and repairing of existing drainage and roof guttering 5. plumbing and drainage: ‘camera and jettering stormwater’ Determination | Case number: 889815 Page 5 of 6 As I am not persuaded the subfloor or piers were damaged by the claimed event, I do not accept items involving this area should be included. This excludes items 2 and 3. The plumbing invoice for the camera and jetting appear to be for clearing tree roots. This is not related to the insured event. This should be excluded as well. I accept the first item should be covered as it appears clearly related to the claim. For the fourth, this also appears to be claim related and should be included. Claim should be settled in this way I accept the insurer’s costing is fair given it is verified by J. However, it should engage J to amend the scope of works and quotes to include these missing items:  repair and replacement of floating floor at front door entrance  front door to ground floor area  remove and replace sliding door unit to bathroom  render and paint external brickwork once it is replaced Once J does, the insurer can cash settle the claim based on this updated scope of works and quotes. It should also include a 15% contingency. I consider this contingency is fair due to the following:  the insurer’s quotes are not all actionable as part of J ’s quotes were for liability only  there is a potential for additional damage occurring due to the works – this can include any other external damage caused by the works highlighted by the complainant  the risks of the works passing to the complainant and th e loss of the insurer’s guarantee of works No interest is payable given this should be based on current quotes. The insurer should also reimburse the complainant for the make safe invoice for the items that are claim related. I have allowed $4,219.65 based on the following:  allowing the amounts for items 1 and 4  allowing a proportion of the builder’s margin based on the proportion allowed for the four items  adding GST The insurer should pay interest on this amount pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 28 April 2022, being when it first responded to the make safe invoice, until payment is made. Determination | Case number: 889815 Page 6 of 6 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.