Earthquake and storm water ingress claims declined; non-financial loss awarded for claim management
Text of the determination
Determination
Case number 889283
Financial firm AAI Limited
Determination | Case number: 889283 Page 1 of 7
Case number: 889283 14 February 2023
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy (policy) with the financial firm
(insurer). On 8 December 2021, the complainant called the insurer to report damage to her
home due to an earthquake on 22 September 2021 as well as storm water ingress damage
on or about 14 November 2021.
The complainant says all the damage is due to the one event, being the earthquake. Further
she was intimated by the insurer’s appointed consultants ‘K’ and the insurer’s management of
the claim has caused her undue stress and anxiety.
1.2 Issues and key findings
Has the complainant established loss or damage due to the earthquake?
No. I am satisfied based on the available information that the complainant has not established
the damage to her home was caused or made worse by the earthquake.
Is the insurer entitled to decline the claim for storm damage?
Yes. The insurer has shown the water ingress damage relates to the poor condition of the
roof which pre-existed the storm and/or earthquake. The policy excludes damage due to wear
and tear, gradual deterioration and a lack of maintenance.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer to pay the complainant $1,000 in non-financial loss compensation given its
poor management of the claim and the conduct of its appointed consultants.
Why is the outcome fair?
The available information shows the damage to the insured building is not because of the
earthquake. Further, that the water ingress damage relates to the pre-existing poor condition
of the roof. Therefore, it is fair that the insurer be permitted to decline cover for the damage in
line with the policy provisions. It is fair the insurer pays the complainant non-financial loss
compensation for her poor experience under the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline both claims in line with the policy. The insurer is to pay the
complainant $1,000 in non-financial loss compensation within 14 days of receiving notice of
the complainant’s acceptance of this determination .
Determination | Case number: 889283 Page 2 of 7
2 Reasons for determination
2.1 Has the complainant shown loss or damage due to the
earthquake?
No. The complainant has not provided persuasive information in support of her position that
the insured building suffered damage because of the claimed earthquake event.
Complainant has the onus to establish the claim is covered under the policy
The complainant is first required to show, it is more likely than not, that the loss or damage
claimed is covered under the terms of the policy. Only if the complainant can do this, will the
duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the
policy wording or otherwise .
The complainant’s policy is a home building policy that provides cover for a series of listed
events including earthquake and storm, subject to several exclusions provided in the policy.
There is no dispute that an earthquake was recorded on the morning of 22 September 2021.
The earthquake was recorded as having a magnitude of 5.9 with the epicentre located in
Rawson. The earthquake was located approximately 10km in depth and the epicentre is
approximately 135 kms from the complainant’s home.
While I acknowledge the complainant’s position, she has not provided persuasive information
to support her position, such as:
expert reports
‘before and after’ photographs
scientific data to show the shaking intensity in the local area was higher than that noted by
the insurer.
Expert reports indicate damage most likely due to earth movement
The insurer appointed building consultants ‘K’ and engineering consultants ‘M’ to attend and
inspect the complainant’s home. K has provided a report dated 21 January 2022.
K notes that the complainant insisted that all the damage was due to the earthquake. She
advised the earthquake was responsible for movement of the roof tiles and/or damage to the
roof which later allowed stormwater ingress and associated damaged.
K confirmed noting damage in the kitchen, meals room, family room, laundry, toilet and open
plan area in the form of cracked floor tiles. Also noted, were cracks to a plaster wall and water
damage to ceilings in the kitchen and family room.
K provides the opinion that the multiple cracks to floor tiles were pre-existing and more than
12 months old. K suggests the damage is likely to be due to longer term general movement
and wear and tear.
K inspected the sub- floor area and didn’t find an y damage consistent with an earthquake.
Further, K says the damage to the plaster wall was also pre-existing presenting with
evidence of previous repairs.
M attended the insured property on 20 February 2020 and has provided a report dated 20
March 2022. In M’s opinion, the damage noted was not as a direct result of the earthquake on
22 September 2021. M says the damage is due to pre-existing and ongoing settlement
Determination | Case number: 889283 Page 3 of 7
(ground movement) issues. Further, that it is important to appreciate the difference
between earthquake damage and earthquake induced damage. Induced damage can occur
when the magnitude of earthquake at the property was inherently insufficient to cause building
damage, but sufficient to expose pre-existing weaknesses.
According to M, based on the geoscience information and the complainant’s observations, the
Modified Mercalli (MM) scale for the complainant’s home was MM 4.1. The M M scale
measures the intensity of the earthquake, the higher the numbers on the MM scale, the
higher the intensity of the earthquake.
For a rating less than MM 5, loose fittings and furnishings move and there is considerable
noise throughout the residence, but structural damage is unlikely. The Shake Map produced
by Geoscience Australia confirms this and indicates limited structural damage throughout the
Melbourne suburbs. M says based on the above, any structural damage to the insured
building is unlikely.
M says earthquake damage is invariably consistent across the entire, or at least most of the
property. Earthquake induced damage occurs only at pre-existing weak points with other
parts of the building unaffected. It is possible the pre-existing damage has been marginally
exacerbated by the earthquake, but the earthquake is not the proximate cause of damage.
I acknowledge the complainant does not accept the opinions provided by K and M. However,
the complainant has not provided any qualified and/or persuasive information to dispute the
reports from K and M. I am satisfied the damage most likely arose due to differential soil
movement and not due to the earthquake.
Insurer entitled to decline cover for claimed earthquake damage
Given the above, the complainant has not established an entitlement to cover for earthquake
damage to the insured building.
The complainant does not dispute receiving the relevant Product Disclosure Statement and
Certificate of Insurance. The policy sets out that loss or damage caused or arising from wear
and tear or gradual deterioration or earth movement, including landslide, subsidence, erosion
or eaves, is excluded from cover unless it is a direct result of an earthquake.
Without persuasive information to the contrary, I accept the engineering report from M
establishes that most likely the earth or soil movement is due to the reactive clay soil on
which the foundations are built and not a direct result of the earthquake. In the circumstances,
I am satisfied the insurer is entitled to rely upon the terms and conditions of the policy to
refuse payment of the claim.
2.2 Is the insurer entitled to decline the claim for storm
damage?
Yes. The insurer has shown, on balance, that the stormwater ingress into the home is due to
the pre-existing poor condition of the insured building’s roof. Damage in such circumstances
is excluded under the policy.
The policy responds to loss or damage caused by a storm
The complainant says all the damage, including the stormwater ingress damage, is due to the
earthquake. In line with the matters considered above, I am not satisfied the evidence shows
that the roof or any other part of the insured building was damaged by the earthquake. I
Determination | Case number: 889283 Page 4 of 7
accept that it was reasonable and consistent with the policy that two separate claims were
lodged and assessed for the two separate events i.e. storm and the earthquake.
There is no dispute the complainant ’s home presented with stormwater ingress damage to
internal ceilings. A storm is an insured event under the policy, so I accept the complainant
has established a loss that triggers cover under the policy.
Information from the consultants supports the insurer’s position
K has provided a report dated 24 December 2021, where it confirms seeing some stormwater
ingress damage to ceilings and eaves. K says at the time of the inspection it noted evidence
of previous damage and repairs to the plaster ceiling and maintenance issues with the roof.
K says the water ingress is because of water leaking through deteriorated ridge capping
mortar and poor previous repairs. K recommended the complainant arrange for maintenance
works to the roof including re-pointing, re-bedding to the tiled roof so it is watertight moving
forward.
Leak de tection experts ‘ WL ’ completed an assessment on 14 February 2022 and provided a
report dated 17 February 2022. WL’s inspection of the roof found:
the hip capping tiles significant cracking / deterioration to all the mortar joins
the valley gutter presented with significant cracking/deterioration to all the mortar joins
the roof tiles were in poor condition with several chipped and cracked tiles over the
affected areas, and tiles becoming porous with holes in them
with respect to the remainder of the roof tiles, there were 20 other chipped and broken tiles
over the rear of the roof and approximately 30 broken tiles over the front section of the roof
the other sections of hip and ridge capping over the roof presented with significant
cracking and deterioration to all the mortar joins.
The complainant has provided an invoice dated 20 November 2021 from ‘J’. This shows J
completed roof perimeter gutter cleaning, which the complainant says is evidence of
maintenance works to the roof. I accept this may be so, however, these maintenance works
were completed after the storm as well as the earthquake events. I am not satisfied this
information assists the complainant.
The insurer is entitled to decline the storm damage claim
I am satisfied the information from the insurer establishes, on balance, that the damage to the
roof and associated water ingress damage is due to the poor condition of the roof. The
reports from WL and K are persuasive and include photos which clearly support their findings
regarding the poor pre-existing condition of the roof.
The policy generally excludes from cover loss or damage that is found to be due to wear, tear
and gradual deterioration. This includes:
weathering of roof tiles or roof ridge capping
gradual weathering and breakdown of bricks, mortar or concrete.
Without information to the contrary, I accept it is fair in the circumstances that the insurer be
permitted to decline the storm damage claim in line with the policy exclusions.
2.3 Is the complainant entitled to compensation?
Yes. The insurer is to pay the complainant non-financial loss in line with the AFCA Rules.
Determination | Case number: 889283 Page 5 of 7
Insurer is to pay the complainant $1,000 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,000 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
I acknowledge the complainant raises various concerns relating the insurer’s management of
their claim, the consultants appointed to the claim, the insurer’s processes and the time it has
taken to bring this matter to conclusion.
I accept the information, which includes several call recordings, shows there did occur failures
in the insurer’s management of the claim, in particular poor communication and the conduct
of some of its appointed consultants.
I accept the poor communication left the complainant confused regarding the assessment
process as well as why the insurer insisted on two claims being lodged. I am satisfied the
complainant has shown this caused her to experience an undue level or degree of stress and
anxiety.
The poor level of service includes some minor quality/accuracy issues with one of K’s report s.
However, although I accept this will have negatively impacted on the complainant, I am not of
the view this means the report as a whole was inaccurate.
I note the insurer’s apology for its failings under the claim. However, under the circumstances
I am of the view an apology alone is not adequate. I am of the opinion, it is fair in all the
circumstances, that the insurer pays the complainant $1,000 in non-financial loss
compensation given her poor experience and in line with the AFCA Rules.
This payment is to be arranged within 14 days of the insurer receiving notice of the
complainant’s acceptance of this determination.
2.4 Why is the outcome fair?
The available information shows the damage to the insured building is not because of the
earthquake. Further, that the water ingress damage relates to the pre-existing poor condition
of the roof. Therefore, it is fair that the insurer be permitted to decline cover for the damage in
line with the policy provisions. It is fair the insurer pays the complainant non-financial loss
compensation for her poor experience under the claim.
Determination | Case number: 889283 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Add supporting detail if needed
What we don’t cover
…
• loss or damage that occurs more than 72 hours after the earthquake or tsunami;
• loss or damage caused by erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover
damage to the building caused by a landslide or subsidence proved to have
occurred within 72 hours of, and directly because of, an earthquake or tsunami
and not because of erosion, structural fault or design fault.
Determination | Case number: 889283 Page 7 of 7
...
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability
caused by, connected with or arising from:
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events: ...
…
Wear, tear and gradual deterioration
any part of the building that has wear, tear, rust, fading, rising damp, corrosion,
rot, action of light, atmospheric or climatic conditions or gradual deterioration such
as, but not limited to:
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.. .
3.3 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to
compensate the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.