Insurer limited liability for leaking stormwater pipe damage, attributing part to excluded causes; complainant sought settlement on her engineer's scope of works
Text of the determination
Determination
Case number 888869
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 888869 Page 2 of 11
Case number: 888869 28 February 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (the insurer) in October 2018 for
damage to her property, after water was discovered leaking from multiple stormwater drains.
The insurer has sought to limit liability based on a scope of works (SOW) prepared by its
structural engineer SW and quote from buildings services company UB. The insurer accepts
damage has been caused by leaking pipes but says surface drainage issues, the reactive
foundation soils and faulty design and workmanship contributed to the remaining damage.
The complainant relies on several engineering reports from her structural engineer RB and
plumber C to say the SOW relied on is inadequate and most of the damage should be
covered.
1.2 Issues and key findings
Should the insurer increase its settlement offer?
Yes. The panel is satisfied that the insurer should increase its settlement of the claim based
on the report from the complainant ’ s engineer RB as set out in section 2.1 of this
determination.
Is the insurer required to contribute to the complainant’s professional costs?
Yes. The insurer is to contribute up to $5,000 to the complainant’s professional costs
Why is the outcome fair?
The available information indicates the proximate cause of most of the damage has been
caused by the leaking pipes. It is fair in the circumstances that the claim be settled based on
a SOW prepared by RB covering the agreed damage.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of the complainant’s
acceptance of this determination the insurer is to:
appoint RB to prepare a SOW to cover the repairs to the areas of influence shaded in pink
and green as identified in the sketch in RB ’s report
on receipt of the SOW, appoint two independent builders to provide actionable quotes for
completion of the repairs as per the SOW. The insurer may then cash settle the claim
based on the higher of the quotes plus a 15% uplift to cover contingencies
under AFCA rule D.5 pay the complainant up to $5,000 contribution to the complainant’s
professional costs incurred subject to the provision of the relevant invoices or receipts.
Determination | Case number: 888869 Page 3 of 11
2 Reasons for determination
2.1 Should the insurer increase its settlement offer?
Yes. The panel is satisfied that the insurer should increase its settlement of the claim based
on the report from the complainant’s engineer RB as set out in this determination.
No dispute property sustained damage due to leaking stormwater pipes
The complainant has the onus to establish on the balance of probabilities (that is more likely
than not) that the loss or damage falls within the terms of the policy.
The complai nant’s Home and Contents policy was incepted in December 2012 and provided
cover for a series of listed events including water and oil leaks. Particulars of cover are set
out in section 3.3 of this determination.
There is no dispute that there was water leaking from the storm water service. The
complainant provided a report from her plumber RP dated 18 October 2018 confirming the
CCTV inspection revealed the stormwater service to be in bad condition with water easily
able to leak into the trenches under the house.
The insurers engineer RC reported on 19 February 2019 that water had been escaping for an
unknown period resulting in differential movement of the footings and damage to the property.
The insurer accepts the water leaks contributed to the damage claimed. The insurer, relying
largely on reports from engineers RC and SW says the damage was contributed to by
inherent long-term foundation movement and general building movement. Such damage is
excluded under the terms of the policy. The insurer has also suggested damage caused by a
kitchen waste pipe had occurred prior to inception of the policy.
The panel accepts the complainant has established the claim falls within the terms of the
policy. To the extent the insurer seeks to limit its liability the insurer must show, on balance,
the damage was caused by a policy exclusion or it is otherwise entitled to decline the claim.
No evidence the kitchen waste pipe was leaking prior to policy inception
While the insurer says the kitchen waste pipe started leaking prior to the policy inception in
2012, there is no substantial evidence to demonstrate this.
The plumbers report from CDC confirms a broken pipe was identified under the kitchen area.
CDC referred to it as an old stormwater pipe. Initially it was considered a possible source of a
leak and likely poor workmanship. CDC has since confirmed it had been disconnected. It was
not connected to anything and has not been connected to either the sewerage or stormwater
lines. The pipe had concrete poured into it to stop any water getting in.
The panel is satisfied there is no persuasive evidence to establish the pipe was a source of a
leak pre-dating 2012 or the claimed damage to the property.
Insurers reports differ as to cause of damage
While there is no dispute there was damage caused by the leaking pipes, the expert reports
differ as to the extent of that damage. Significantly however, both the insurer’s expert RC and
the complainant’s expert RB are in broad agreement that about 70% of the damage is
attributable to the leaking pipes.
Determination | Case number: 888869 Page 4 of 11
R C’s initial report says the lack of drainage a long the southern wall caused the founding soil
to swell, contributing to damage. After receipt of further reports, RC revised its conclusion in
March 2020 and considered 70% of the damage due to plumbing issues, 20% due to
ineffective drainage and 10% due to natural sol movement.
The insurer’s engineer SW provided reports in August 2022 and October 2022. SW
considered the breakage in the wastewater pipe adjacent to the kitchen has caused water
ingress to the surrounding soil, spreading to the subfloor, and subsequently flooding the
subfloor. The escape of water from the breakage within the pipe has contributed to differential
movement and damage to the allocated rooms in the radial influence zone indicated including
the kitchen, living, dining, laundry & lounge.
SW considered the damage in the remaining rooms about the eastern side of the property
was unaffected by the escape of water and pre-existing in nature. This included damage to
bedroom 3, bathroom, toilet, master bedroom & ensuite, bedroom 2, hallway and entry. SW
says the damage to this area is outside the radial influence zone and attributable to factors
such as foundation reactivity, inherent thermal movement, age-related wear and tear &
deterioration and insufficient drainage/subfloor ventilation.
Complainant ’s reports more persuasive
The complainant’s plumber, RP, noted multiple pipe breaks below the property. This first was
under the driveway in the north side. The second pipe was at the rear west of the property.
The complainant’s engineer RB first attended the property in April 2021 at which time he had
access to the various plumbing reports and engineering reports from RC. RB did moisture
testing 300m below the pipes revealing moisture of 36%. This confirms a substantial and
continuous leak, which would have initiated heave and most of the failures within the
plumbing. The borehole testing confirms the degree of movement within the middle of the
property. RB provided a sketch with the area he thought was influenced by the leak shaded in
pink and green. The area not influenced but likely due to natural soil movement was shaded
in blue.
In response to SW’s report dated 14 October 2022, RB noted that the highest location is in
fact the south-east corner as is the whole south side of the building. Most of it is away from
the zone of influence that they wish to believe is accurate. The reality is that water does not
flow uniformly through soils, it flows through trenches far more quickly than it does through
normal soil. It was RB’s firm opinion that the leaks that have been prolific in the property have
flowed the trenches and have influenced the building beside those trenches. The sketch in
the original report indicates the area’s most lik ely influenced by the leak being in pink.
RB ’s findings are based on extensive soil and moisture testing. RB ’s level survey identified
the highest points to be at the south-east corner of the dwelling, being the furthest location
away from the leaking pipe. This is consistent with water flowing through the trenches and
influencing the building near these trenches. If the damage had been due to the factors
identified by the insurer, it is likely the type of ground movement would not have been heave.
The panel is satisfied RB ’s findings support the view the leak was substantial and has
affected the founding soils beyond the areas identified by SW.
Wayne Tank principle does not apply
The panel has considered whether the Wayne Tank principle applies. Basically, that principle
provides that if there are two or more causes of damage of equally proximity, one an insured
Determination | Case number: 888869 Page 5 of 11
event and one an excluded event, the exclusion will apply to defeat the claim.
The panel acknowledges and accepts that some of the damage as identified by RB and SW
was not related to the events. That damage is identified in the area shaded blue in the sketch
provided by RB.
The panel is satisfied however that the Wayne Tank principle does not apply to the remaining
damage. There is no evidence the damage existed prior to the water leaks. While there is
some information to suggest the natural soil movement contributed to some of the damage,
there is no evidence that natural soil movement had caused any damage prior to the water
leaks. Exactly how long the water had been leaking is unknown, but it is clear the water leaks
had been substantial. Multiple leaks have been identified. These leaks caused the damage
claimed. This is consistent with:
RB ’s explanation about water flowing through the trenches and the level survey results
the house having stabilised following the drying out period (this indicates the damage was
caused by the leaks)
the fact substantive damage should have been observed before 2018, if the damage was
caused by a leak before inception in 2012
the report from RB shows the ground is very wet, consistent with leaks being the cause.
Based on the information available, including the reports from RC and RB, the panel accepts
that the proximate, that is the dominate or effective cause of the damage was the leaking
pipes. The panel does not accept the surface drainage issues or reactive foundation soils
were of equal proximity in causing the damage identified by RB and RC.
Insurer is liable to increase settlement offer
The panel is persuaded by the report from RB dated 11 May 2020 that damage shaded pink
and green in the sketch provided by RB (section 3.4 of this determination) should be covered
under the terms of the policy. The area shaded blue is likely due to foundation movement and
excluded from cover.
The panel notes the complainant has completed all relevant maintenance work to the sewer
and stormwater service (completed by CDC in 2020) and that the recommended to year
drying out period has now lapsed. Accordingly, the panel determines that within 14 days of
the complainant’s acceptance of this determination the insurer must:
engage RB to provide a SOW to cover the damage identified in the areas shaded pink and
green in the sketch provided in the report of 11 May 2020,
on receipt of the SOW, appoint two independent builders to provide actionable quotes for
completion of the repairs as per the SOW.
the insurer may then cash settle the claim based on the higher of the quotes plus a 15%
uplift to cover contingencies including the transfer of risk.
interest is not payable given the settlement will be based on a current quote.
If the parties are unable to agree on the quantum, the complainant can lodge a new complaint
at AFCA for a decision on this point.
2.2 Is the insurer requi red to contribute to the complainant’s
professional costs?
Yes. The insurer is to contribute up to $5,000 to the complainant’s professional costs
Determination | Case number: 888869 Page 6 of 11
The insurer is to contribute to the cost of the complainant ’s expert reports
Under Rule D.5, AFCA may determine an insurer contribute to legal or other professional
costs incurred by a complainant during a complaint. Unless exceptional circumstances apply,
AFCA will not require an insurer to contribute more than $5,000 to these costs.
When determining whether an insurer should contribute to the payment of professional fees
incurred, AFCA will consider the complexity of the complaint, whether the advice was
reasonably needed and whether the costs incurred were because the expert advice was
genuinely required.
In t he panel’s view, the complainant’s engineering and plumbing reports were necessary to
assist in establishing her case. The complainant provided reports from RP, CDC and RB (x3).
The panel is satisfied the insurer should reimburse the complainant for the costs incurred in
obtaining those reports.
The panel considers it fair in the circumstances the insurer contributes up to $5,000 in total
for all the professional costs incurred by the complainant during this complaint, subject to the
complainant providing the insurer with the relevant invoices for the reports.
2.3 Why is the outcome fair?
The available information indicates the proximate cause of most of the damage has been
caused by the leaking pipes. It is fair in the circumstances that the claim be settled based on
a SOW prepared by RB covering the agreed damage.
Determination | Case number: 888869 Page 7 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy, a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Expert reports
Record Key points
Insurer ’s enginee r (RC )
Report
12 - 02 - 2019
Garden beds are allowing water to migrate to the soil below the dwelling.
Civil drainage did not exist along one or more walls.
A wastewater pipe l eft uncapped has been discharging water onto the
subfloor soil for an unknown period .
The discharged water migrated through the founding soil in the area,
causing stumps to subside and stumps further away to swell.
Determination | Case number: 888869 Page 8 of 11
Record Key points
The lack of civil drainage along the sou thern wall caused the adjacent
founding soil to swell, contributing to the damage in the laundry and
western - most bedroom and causing damage near the southern wall.
The damage to the driveway has been caused by natural seasonal
movement and settlement of t he subbase.
The l eak under the kitchen would not have resulted in water finding its
way to the underside of the pavement.
Insurer ’s engineer (RC)
Report
24 - 03 - 2020
The level surveys indicate relatively little movement has occurred over
the last 12 months.
The aesthetic damage appeared unchanged in most cases.
The founding soil has not reached a new moisture equilibrium, as
defects are still present in the plumbing systems.
In effective drainage and a tree were sighted during the reinspection.
Insurer’s builder (LO)
Report
24 - 03 - 2020
T he stormwater plumbing was in a bad condition and had been leaking
water under the house, which the plumber believed has contributed to
the movement issues.
The property had evidence of existing movement - related is sues within
both the conc rete driveway and the brick veneer of the property.
Despite this , a CCTV inspection has shown water escaping from the
stormwat er plumbing underneath the property.
Complainants plumber
( RP )
Report
18 October 2018
There are two poi nts of legal discharge on the property .
One through the driveway to the north with a discharge into a pit , and
another one locat ed to the rear of the property.
Water is easily able to escape the current damaged drain and has been
leaking into the trenc hes under the house.
Insurer’s builder ( SP )
Report
20 - 07 - 2020
During inspection of the stormwater system, SP found the entire
stormwat er system has been renewed with PVC. T he new lines are in
good condition, with no areas of concern.
There is no evidence of any cracks or breaks within the pipes and no
signs of any blockages.
Insurer’s engineer (RC)
Report
02 - 10 - 2020
The temporary civil drainage has prevented water from ingressing to the
soil and migrating below the footings.
The drying out period has elapsed, and the repairs can now begin.
It is recommended graded concrete paving is installed around the
perimeter of the dwelling when possible.
Complainant’s engineer
(R B )
Report
11 - 05 - 2021
The garage is solid brick, using brick piers, timber rafters, and a
standard tin pitched roof. The main driveway into the garage is two strips
of concrete that are in average condition. Beside the hous e, the paving
is from the building to the fence.
As to the externals of the property we noted that the site is very flat and
by today's standards site drainage, i.e. the grading of the ground away
from the building, has not been initiated, thus there is some potential for
localised wetting up in some areas.
Determination | Case number: 888869 Page 9 of 11
Record Key points
There are no major trees in and aro und the property, save for the tree at
the neighbour's house, but it is at a sufficient distance away and unlikely
to be causing any effect (currently).
Complainant’s engineer
(R B )
Report
18 - 08 - 2021
The moisture levels in the two samples indicat ed a very high moisture
regime. Above 30% would indic ate a leak, and 36% moisture content
means a substantial leak.
Noting this was 300mm below the invert levels of the pipes and thus a
substantial and continuous leak initiating heave and possibly initiating
most of the failures within the plumbing.
The plumber CP indicated all static testing was initiated, and all found to
be perfect, thus all the leaks have been eliminated.
The major leak , picked up adjacent to the kitchen sometime back , has
now been corrected, b ut its effects i.e. water running in the trench has
moved all the ground on the southern side of the building and has
initiated most, if not all, of the high moisture content along that line.
This in turn has heaved the southern side of the building for i ts complete
length.
The stormwater line runs across the back of the kitchen area and down
the complete southern side of the building towards the front street.
The moment the failure existed adjacent the kitchen, the trench became
incredibly wet and remaine d so, causing heaving of the building.
There is heaving on the western side of the property and dislocation and
heaving along the southern length of the boundary.
T he northern portion of the lounge living area has also been heaved.
Complainant’s engineer
(R B )
Report
21 - 10 - 202 2
Plumber C Ps report defined the pipe as an old stormwater pipe and
correctly noted it has been disconnected.
The upstream and downstream ends go i nto dirt and/or are blocked off.
T hus, it cannot convey any moisture as it is not con nected to anything.
RI d is agrees with the interpretation that moisture moves in a uniform
circle from a given point. It does n ot , it moves along trenches as it is
willed and free to do.
Insurer’s engineer (SW)
Report
02 - 08 - 2022
E scape of water within the pipe has contributed to differential movement
and damage to the rooms , including the kitchen, living, dining, laundry &
lounge .
The damage in the remaining rooms in the eastern side are unaffected
by the escape of water and are pre - existing in nat ure . T hes e include
bedroom 3, bathroom, toilet, master bedroom & ensuite, bedroom 2,
hallway and entry.
The areas outside the zone of influence are unrelat ed to the wastewater
pipe breakage, and are attributable to the following factors:
> f oundation reactivity
> i nher ent thermal movement
> a ge - related wear and tear & deterioration
> i nsufficient civil drainage/subfloor ventilation/maintenance as outlined
by RC .
Determination | Case number: 888869 Page 10 of 11
Record Key points
Insurer’s engineer (SW)
Report
14 - 10 - 2022
Some of the highest points in RI’s level survey w ere at the s outh -
e asternmost corner of the dwelling, which is the furthest location away
from the claimed leaking pipe.
Given RI acknowledged ‘the site is very flat by today’s standard site
drainage’, the escape of liquid beyond the zone of influenc e would not
have been pla usible.
T he higher degree of fluctuation in foundation material moisture over the
las t six years has resulted in more severe foundation reactivity and
prominent movement and damage within the building fabrics.
SW reaffirms any damage outside of the zone of influenc e is attributable
to inherent foundation reactivity and general building movement and is
unrelated to the claimed leaking pipe event.
3.3 Relevant policy provision
Water and oil leaks
If loss or damage is caused by water or oil leaking or escaping from an item shown here.
Covered
water leaking or escaping from:
- house gutters, drainpipes or pipes
- sanitary fixtures – for example, baths or toilets
- appliances – for example, washing machines or dishwashers
…………..
Not covered
water leaking or escaping from a shower recess or shower base
costs to repair or replace the item that the water or oil leaked or escaped from
RB property damage sketch (17 August 2021)
Determination | Case number: 888869 Page 11 of 11