Home / Allianz Australia / Determination 888746

Determination 888746

Storm damage claim: roof and guttering declined; make safe works, mould and settlement amount disputed

FirmAllianz Australia
Decided2023-02-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,000
Non-financial loss$2,000
Amount claimed$40,662
SourceAFCA PDF

Summary

The complainant claimed storm damage to her home after the insurer declined roof and guttering damage and disputed its settlement. AFCA found the insurer's make safe works contributed to further water ingress and mould, and ordered additional settlement amounts, mould reimbursement, and $2,000 non-financial loss compensation, while upholding the roof and guttering decline.

Storm and rainwater cover applies without a storm-created opening requirement, but wear, tear, gradual deterioration and lack of maintenance are excluded; the insurer's inadequate make safe works caused further loss.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 888746 Financial firm Allianz Australia Insurance Limited Determination | Case number: 888746 Page 1 of 10 Case number: 888746 10 February 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy (policy) with the financial firm (insurer). On 2 March 2022, the complainant lodged a claim for storm damage to the insured property. The insurer accepted the internal damage caused by the storm. However, it declined to cover damage to the external roof, box gutter and damage in the sunroom. The insurer says this damage relates to gradual deterioration, lack of maintenance, faulty workmanship and wear and tear. The complainant disputes the insurer’s assessment of its liability. She wants the insurer to cover the damage to the roof, internal damage in the sunroom, mould remediation expenses and two additional blinds. The complainant says the insurer ’ s make safe works and delays have caused further damage to the property. She is seeking compensation for her poor experience under the claim. 1.2 Issues and key findings Is the insurer entitled to decline cover for the roof and box guttering? Yes. The available information does not show that the storm damaged the roof and box guttering. The recommended works being claimed include repairs to some minor rusting and wear tear as well as upgrades to the structure and pitch of the roof. This is not covered under the policy. Did the make safe works cause or contribute to further damage? Yes. On balance, a failure by the insurer to complete adequate make safe measures has resulted in pooling of water, additional water ingress and a contribution to the mould infestation within the home. The insurer is to reimburse the complainant for the additional mould remediation measures she was required to authorise. Has the insurer accurately assessed its liability under the claim? No. In addition to its claim settlement offer of $18,826.56, the insurer is to increase its settlement to include the following:  an additional 20% contingency payment ($3,765.31 ) on the insurer’s cash settlement amount of $18,826.56  the cost to replace the asbestos ceiling in the sunroom  the additional mould remediation expenses for the sunroom and lower level rooms. If the complainant has incurred these expenses, the insurer is to reimburse the complainant for these costs on being provided proof of payment by the complainant  the insurer is to arrange restoration of the two blinds. However, if this is not possible or the blinds have been disposed of, the insurer is to pay the complainant for the cost to replace the blinds. Determination | Case number: 713109 Page 2 of 10 On arranging the above, the insurer will have fulfilled its liability for the claim related damage to the insured property. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer is to pay the complainant $2,000 for her poor experience under the claim in line with the AFCA Rules (Rules). Why is the outcome fair? The outcome is fair because the insurer’s assessment of its liability under the claim did not fulfil its policy obligations. However, the insurer is not required to cover all the loss or damage claimed by the complainant. The outcome sets out what a fair settlement should be having regard to the expert reports and policy provisions. Finally, the complainant had a poor experience under the claim and non-financial loss compensation is awarded in line with the Rules. 1.3 Determination This outcome is in favour of the complainant. The insurer is to increase its level of indemnity under the claim to include:  an additional 20% contingency payment ($3,765.31 ) on the insurer’s cash settlement amount of $18,826.56  cover the cost to replace the asbestos ceiling in the sunroom  the additional mould remediation expenses for the sunroom and lower level rooms. If the complainant has incurred these expenses, the insurer is to reimburse the complainant for these costs on being provided proof of payment  the insurer is to arrange restoration of the two blinds, however, if this is not possible or the blinds have been disposed of, the insurer is to pay the complainant for the cost to replace the blinds. The insurer is not required to cover the costs associated with the repair/replacement of the roof and box guttering. Within 14 days of the insurer receiving notice of the complainant ’s acceptance of this determination, it is to pay the complainant $2,000 in non-financial loss compensation. Further, in line with Section 57 of the Insurance Contracts Act 1984 (Act), the insurer is to pay interest on any payments made by way of reimbursement of payments already made by the complainant towards the mould remediation works and other repairs to be accepted under the claim. Determination | Case number: 713109 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer entitled to decline cover for the roof and box guttering? Yes. The available information does not show the roof and box guttering has sustained any damage because of the storm event giving rise to the claim. Rather, the repair/replacement of the roof and guttering is due to maintenance related issues and recommended upgrades, which is not covered under the policy. The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including Storm, cyclone, rainwater or run-off . Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. In seeking cover under the policy, the complainant has the obligation to show that the loss she is seeking cover for is of a type covered under the policy. Further, even if she is successful in showing this, cover for such loss or damage is still subject to the terms, conditions and exclusions of the policy. Complainant must show damage to roof and guttering covered under the policy The complainant believes the insurer is obliged to cover the cost to replace a section of insured building’s roof. The complainant has provided a quote from consultants ‘AM’ dated 4 July 2022 in the amount of $23,276 for these works. The complainant says the roof was in good condition and never leaked prior to the event which suggests it was damaged by the storm. Having considered this quote, I note it includes:  a provision to increase the pitch of the roof  upgrade the trusses to current building codes  upgrade the ceiling insulation; and  to increase the size of the box gutters to prevent future water ingress. The insurer says there was no storm damage to the roof and it relies on reports by its consultant ‘P’ and refers to the AM report as well. P, in its report dated 24 March 2022, says it found rusting to the box gutter and to 5%-10% of the roof sheeting. Having considered the information from AM, I am not persuaded that this assessment found any storm damage to the roof or guttering. Rather, it simply recommends replacement and additional upgrades to assist with prevention of water ingress in the future. Given this, whilst I acknowledge the complainant ’ s position, I do not accept it. This is because there is no information that establishes the roof or guttering has sustained damage because of the storm event. I accept water ingress did occur resulting in internal damage. However, in my opinion this was not because of storm damage to the roof. Rather, it was because of the gutters overflowing and allowing water to enter the roof cavity during the significant rainfall event. Determination | Case number: 713109 Page 4 of 10 Insurer entitled to decline cover for the roof and guttering I am satisfied the insurer has shown any damage to the guttering and roof in the form of rusting existed before the storm event. Further, that this relates to gradual deterioration, wear, tear and a lack of maintenance. Loss or damage of this nature is excluded under the policy. Relevant policy provisions have been provided in section 3 of this determination. Accordingly, for these reasons, I am satisfied the insurer is entitled to decline cover for the roof and guttering under the claim. 2.2 Did the make safe works cause or contribute to further damage? Yes. On balance, a failure by the insurer to complete adequate make safe measures did result in further water ingress into the home. Make safe works were not adequately completed by the insurer There is no dispute the insurer arranged for make safe works which included installing a tarp over the sunroom area to prevent further water ingress damage. I accept the purpose of make safe works is not to provide a permanent solution, but rather they are works intended to mitigate further loss or damage until repairs are completed. T he insurer’s consultants were required to attend the home on multiple occasions because of concerns with the make safe works. Further, the information shows additional instances of water ingress into the home occurred due to the failure of the make safe works completed by the insurer. I am satisfied these repeated instances of water ingress and water pooling on the roof (on top of the tarp), did increase the storm water damage and mould infestation within the home. I ac cept the complainant’s opinion that the insurer failed to ensure adequate make safe measures were put in place. I acknowledge the insurer’s position that once the complainant was told cover for the roof had been declined, the responsibility to mitigate further loss shifted to the complainant. However, in my opinion it would not be fair in all the circumstances for the insurer to have no responsibility for the damage. Although the insurer told the complainant it would not cover the roof, the issue of cover for the roof remained in dispute between the parties. Given the insurer had arranged the make safe works, I consider the insurer was required to ensure the measures were adequate and reasonably long lasting. Failure of make safe measures resulted in further loss or damage Having considered the available information, I am satisfied it is reasonable to accept the failure of the insurer’s make safe works did contribute to further water ingress damage and associated mould within the home. T he reports from the insurer’s consultants ‘RS’ show ongoing high moisture levels and the presence of mould within the home over multiple visits to the property. I am satisfied that this relates to and/or at the very least is significantly contributed to by poor make safe works completed by the insurer. Determination | Case number: 713109 Page 5 of 10 The impact of this in terms of the insurer’s liability under the claim for this failure will be considered in more detail in section 2.3 below. 2.3 Has the insurer accurately assessed its liability? No. The in surer’s assessment of its liability under the claim and associated final claim settlement offer does not fulfil its obligations under the policy. The insurer is to increase the claim payment in line with this determination. The complainant says the insurer is liable for additional internal repairs The complainant says the insurer’s assessment of its liability under the claim is not consistent with its policy obligations. Further, that the insurer should be required to cover additional damage caused because of the defective make safe works and delays in bringing the claim to conclusion. The insurer says it ’s consultant’s assessment and associated scope of works represent all the claim related damage. Further, that any additional items the complainant is seeking to claim are unrelated to the claim. The insurer has cash settled the complainant in the amount of $18,826.56 based on ‘P’s’ quote. This quote, and therefore the settlement, does not include any internal repairs to the sunroom. Significant remodelling works to the sunroom not covered The complainant provided a quote from consultants ‘W’ dated 24 August 2022 in the amount of $40,661.87. The complainant says this quote represents works left out of the insurer’s settlement including significant works to the sunroom and replacement (including upgrades) to the roof and guttering. I do not agree the insurer is liable for the significant works quoted by W, other than the cost to replace the sunroom ceiling as discussed below. There is no compelling information which shows these works arise from any of the insured events covered by the policy or a failure by the insurer or its appointed consultants. Rather, I accept, on balance, these works relate to replacement of and upgrades to the roof, which are not covered under the policy. Replacement of the sunroom ceiling to be accepted under the claim I am satisfied it is fair that the insurer be required to cover the cost to replace the asbestos sunroom ceiling. I accept the available information shows, on balance, the ceiling had been damaged by the storm event and subsequent instances of water ingress because of the failed make safe works. The insurer in declining cover for the roof and sunroom repeatedly refers to the term ‘ no storm created opening’ . However, having carefully reviewed the policy wording, there is no such term included in the policy provisions. The policy does not require a storm created opening to trigger cover for storm water ingress damage. The PDS provides cover for loss or damage to the building and contents caused by:  storm  cyclone  rainwater  run-off (provided run-off is not combined with floodwater). Determination | Case number: 713109 Page 6 of 10 I accept, in the specified exclusions under the storm damage benefit, the PDS says there is no cover for loss or damage caused by rain entering the insured property through an open door, window or other opening. However, there is nothing in the PDS that says a storm created opening is necessary and/or a requirement to trigger an entitlement to cover. I am aware there are contracts of insurance which do require this (storm created opening), however, such a requirement is clearly specified in the provisions, which is not the case in this instance. I acknowledge the insurer’s reliance on the reports from P and AW to say the water in gress damage in the sunroom is because of the rusted box gutter, roof sheets and a connection of metal roofing to the main tile roof. However, having considered the information, I am not of the same view because:  the report and photos from P do not actually show any holes in the guttering or roof sheets from rusting and deterioration  P refers to only 5%-10% rusting which is quite minor and, in my opinion, does not establish this to be the dominant cause of the water ingress  AM’s report provides no informati on of assistance to show any wear and tear related openings in the roof sheets or guttering. In my opinion, a fair interpretation of the available information establishes the original water ingress damage is because the gutters were not able to cope with the significant amount of rainfall during the insured event. This has caused the gutters to overflow which in turn allowed water to leak into the sunroom ceiling cavity damaging the asbestos ceiling sheets. Further, subsequent additional instances of water ingress and associated damage also occurred because of the insurer’s failure to arrange adequate make safe measures. This has further exacerbated the damage to the ceiling and presence of mould. I am of the opinion it is fair in the circumstances to require the insurer to cover the complainant for the cost to replace the sunroom asbestos ceiling. I consider that replacement of the ceiling is appropriate, rather than repair because the ceiling sheets are asbestos. It is not recommended to repair, or handle asbestos given the associated dangers of the product, so the ceiling is to be replaced. Mould remediation The complainant, given the health concerns and to mitigate further damage, has arranged for mould remediation works to be completed. The complainant is seeking reimbursement of the below amounts under the claim:  invoice dated 28 July 2022 from ‘W’ in the amount of $350  quote from mould remediation from ‘BM’ dated 28 July 2022 in the amount of $10,021 for the downstairs area  quote for mould remediation works in the sunroom in the amount of $5,414.60 including GST. This includes the cost to remove the asbestos ceiling of $2,200 including GST. The insurer says it is not liable for these costs because it’s consultants RS had already completed mould remediation works in April 2022. RS reports show that it attended the home on 22 April 2022, 4 May 2022 and 10 May 2022. RS confirms seeing mould relating to the water ingress caused by the storm in the sunroom and through the lower level of the home. I accept the RS reports show it applied anti-microbial to sanitise the mould affected areas on 22 April 2022. However, I do not accept the insurer’s position that these works remedied the mould infestation within the home. This is because RS’s subsequent reports confirm mould Determination | Case number: 713109 Page 7 of 10 continued to grow within the home. This is also confirmed in BM’s investigations arranged by the complainant. I accept the complainant’s position that this was a health threat and that she allowed the insurer adequate time and opportunity to arrange the required mould remediation, which did not occur. Accordingly, subject to the complainant providing the insurer with evidence of her having paid all the claimed expenses, the insurer is to reimburse the complainant for these mould remediation costs. Blinds The complainant says the insurer has accepted to replace two blinds. However, four blinds where damaged and the insurer needs to settle the remaining two blinds at $600 each. The P report confirms two blinds were unsalvageable and the other two could be restored. The complainant says the blinds are no longer restorable due to further damage which has occurred because of the delays experienced under the claim. The complainant has not provided any information in support of her position that the blinds are beyond restoration. The insurer has not provided an estimate as to the costs involved in restoring the blinds. Without supporting information from either party regarding the two blinds in question, I am of the opinion it is fair that the insurer be allowed the opportunity to restore the blinds. However, if this is not possible and/or the blinds have since been disposed of because of the mould damage, the insurer is to cover the additional two blinds at $600 each. Painting, plastering and concreting costs The complainant is seeking cover/reimbursement for costs for plastering, painting and concreting over and above t he insurer’s claim settlement payment of $18,826.56. The complainant has provided:  two quotes for additional painting, the first from TK dated 22 August 2022 for $5,712.65 and the second from AC dated 20 September 2022 for $11,247.17  an invoice from LN for $4,840 to complete plaster repairs. The invoice does not provide a breakdown of what works were completed  a quote from CN for $5,533 to repair the concrete under the external gate runner. I acknowledge the above documents have been provided. However, I am not satisfied the insurer is required to pay these expenses in addition to its claim settlement payment of $18,826.56 based on P’s scope of works and quote. I am satisfied that the works included in these quotes and invoices do not relate to damage that has been shown to have been caused by the insured event, whilst other works form part of P’s quote and have already been accepted and cash settled by the insurer. There is no persuasive information which shows P’s scope of works and associated cash settle ment were not sufficient to cover the damage accepted under the claim, including the concreting works. 2.4 Is the complainant entitled to compensation for non- financial loss? Yes, the insurer is to pay the complainant $2,000 in non-financial loss compensation under the claim. Determination | Case number: 713109 Page 8 of 10 Insurer to pay the complainant $2,000 non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The complainant says the insurer ’s mishandling of the claim created a significant amount of stress to her family and is seeking the maximum entitlement ($5,400) in non-financial loss compensation. The insurer says it has not mismanaged the claim with its decisions consistent with its experts’ reports and the policy provisions. The claim arose from a significant event. I acknowledge under the circumstances it is understandable that a certain degree of delay is to be expected in relation to the insurer completing its assessment of the insured property. I also acknowledge the insu rer’s position that it completed its assessment and provided the complainant with its claim assessment decision in June 2022, within approximately three months. The insurer says the responsibility for the delays experienced under the claim and additional damage to the insured property rests with the complainant. I do not agree, given the available information shows the insurer’s assessment of its liability under the claim was not accurate or in line with its policy obligations. The information shows the i nsurer’s level of communication over the life of the c laim was poor and it has failed to accept the inaccuracies of its assessments despite the complainant’s concerns in this regard. The insurer ’s failure to arrange adequate make safe works and continued denial of this has been a significant contributing factor for the delays experienced. I accept these failures on the part of the insurer will have caused the complainant and her family to experience undue levels of stress, anxiety and physical inconvenience over the course of the claim. In saying that, I believe it is fair to say it is not the insurer alone that has contributed to all the delays experienced under the claim. I accept the insurer’s position that the complainant’s refusal to accept its position on matters such as the roof and guttering being excluded has also contributed to the delays. Having considered the parties ’ positions and available information, I do not accept it would be reasonable to require the insurer to pay $5,400 in non-financial loss compensation, as claimed by the complainant. However, I am satisfied that it is fair that the insurer be required to pay the complainant $2,000, within 14 days of receiving notice of her acceptance of this determination. 2.5 Why is the outcome fair? The outcome is fair because the insurer’s assessment of its liability under the claim did not fulfil its policy obligations. However, the insurer is not required to cover all the loss or damage claimed by the complainant. The outcome sets out what a fair settlement should be having regard to the expert reports and policy provisions. Finally, the complainant had a poor experience under the claim and non-financial loss compensation is awarded in line with the Rules. Determination | Case number: 713109 Page 9 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy wording Product Disclosure Statement Storms, cyclone, rainwater or run - off What is covered ? ✔ Loss or damage caused by: • storm • cyclone* • rainwater • run - off (provided run - off is not combined with flood waters). * A 72 hour exclusion period applies for loss or damage caused by cyclone – see page 3 for details. Determination | Case number: 713109 Page 10 of 10 What is not covered? Loss or damage caused by :  ...  rainwater, run - off, hail, wind or water that enters your buildings through an open door, window or other opening (this exclusion does not apply to openings made by the storm or cyclone, or, if you’ve selected the optional cover Accidental damage and it is shown on your policy schedule). General Exclusions: Always excluded Wear and tear Includ ing depreciation, gradual deterioration, wear and tear or lack of maintenance. Inherent defects Including faulty design or materials, structural defects or poor workmanship.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.