Home / RACQ / Determination 888425

Determination 888425

Claim denial for damaged swimming pool after insurer reversed initial acceptance

FirmRACQ
Decided2023-02-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed$7,785
SourceAFCA PDF

Summary

The complainant lodged a claim for storm-related damage to his pool, which the insurer initially accepted by mistake before later denying it after investigation. AFCA found the damage was likely due to excluded causes, but ordered the insurer to pay $500 non-financial loss compensation and to reimburse expert report fees up to $5,000.

The complainant bears the onus of proving a claimable loss from an insured event, and the damage was likely caused by excluded wear and tear and gradual deterioration, while claim handling delay and error caused stress warranting non-financial loss compensation.

Issues

Subjects and remedies

pay non financial lossprovide documents

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 888425 Financial firm RACQ Insurance Limited Determination | Case number: 888425 Page 2 of 8 Case number: 888425 30 January 2023 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance issued by the financial firm (the insurer). On 24 April 2022, the complainant lodged a claim after as his pool was damaged. On 9 May 2022, the insurer advised the claim had been accepted and would be cash settled for $6,520. However, later on 9 May 2022, the insurer told the complainant that an error had been made, the claim may not be for acceptance and further investigation was required. The insurer eventually denied the claim as the damage was not due to an insured event but was caused by wear and tear and gradual deterioration. The policy excludes damage from those causes. The complainant says the claimed damage is storm related or the result of the insurer’s delays. He wants the insurer to cover the cost of replacing the pool. He is also dissatisfied with the insurer’s claim acceptance withdrawal and conduct generally. 1.2 Issues and key findings Is the insurer required to cover the claim? No. The complainant has not proven the damage has been caused by an insured event under the policy. Rather, the damage is likely due to excluded factors. Further, while the insurer was responsible for some delay and initially told the complaint the claim was covered, these issues did not materially worsen or prejudice the complainant’s position. Is the complainant entitled to any payments? Yes. As the insurer asked the complainant to obtain a report and quotes, it is required to reimburse fees charged (upon proof of payment being provided, capped at a $5,000 maximum). Further, the insurer’s claim handling has unreasonably caused the complainant stress and frustration. It is to pay him $500 in non-financial loss compensation. Why is the outcome fair? The complainant has not shown he has suffered a loss claimable under the policy or that the insurer has caused further damage. Accordingly, it would not be fair to require the insurer to cover the claim. As the insurer asked the complainant to obtain a report and quotes, it is fair that it reimburses fees he incurred, if any. It is also fair that it pays $500 in compensation for the stress it’s claim handling caused. 1.3 Determination This determination is substantially in favour of the insurer. If the complainant provides written notice he accepts this determination, the insurer must:  within 21 days, pay the complainant $500 in non-financial loss compensation  within 14 days of receiving from the complainant proof of payment, reimburse him any fees (up to $5,000) he incurred in obtaining the report and quotes the insurer requested. Determination | Case number: 888425 Page 3 of 8 Determination | Case number: 888425 Page 4 of 8 2 Reasons for determination 2.1 Is the insurer required to cover the claim? No. The complainant has not proven the damage has been caused by an insured event under the policy. Rather, the damage is likely due to excluded factors. Further, while the insurer was responsible for some delay and initially told the complaint the claim was covered, these issues did not materially worsen or prejudice the complainant’s position. Complainant is required to show a claimable loss under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. The complainant and his wife hold home and contents insurance with the insurer. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers damage to their home (including its fixed swimming pool) caused by a listed insured event. One of the listed events is ‘Storm’. Further, the complainant added optional accidental damage cover to the policy. However, the PDS specifies that cover does not extend to accidental damage to swimming pools. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Complainant says the insurer should cover the claim When he lodged the claim on 24 April 2022, the complainant told the insurer that earlier that day he had noticed a big tear in the pool’s lining. He was unsure whether the tear was due to recent rainfall or pool chemicals. The complainant said that he had emptied the pool down to a safe level to avoid water entering the pool walls and potentially causing them to collapse. The insurer asked the complainant to obtain a damage report and quotes. On 3 May 2022, he provided a report and two quotes from AG, aboveground pool specialist. AG concluded: the cause of damage to the pool is consistent with the pool being empty for a short time waiting liner membrane repair, in the meantime due to no water the storms of late have damaged the pool beyond repair, I recommend full replacement of the swimming pool is most certainly the safest option. I feel the structural integrity of the pool has been greatly compromised, the water flow from the storm has undermined the structural support frame dramatically affecting their ability to safely support the weight of the water, this dislodgement of the structural support, has buckled and kinked the supporting wall of the pool, and in turn rendering it unsafe to support the weight of the water also. AG quoted $7,785 to supply a new pool and liner and $7,520 for installation. On 9 May 2022, the insurer’s claim representative informed the complainant the insurer had accepted the claim and proposed to pay him $6,520 (AG ’s installation quote less the $1,000 policy excess). The insurer emailed him a cash settlement fact sheet confirming the offer. Determination | Case number: 888425 Page 5 of 8 The complainant accepted the installation cost offer but queried why the other quoted amount was not included. A few hours after saying it accepted the claim, the insurer told the complainant a mistake had been made, the claim may not be one for acceptance, and further investigations were required. It was not until mid September 2022, that the insurer completed its investigations and denied the claim. The complainant says that the insurer took too long to make a claim decision and that the pool (especially its liner) continued to deteriorate in the meantime. He also says the report by CR (the insurer’s expert builder) is unreliable as it was prepared months after the claim was lodged, by which time the deterioration was advanced. Further, he submits that AG’s views should be preferred as AG is an aboveground pool specialist with 30 years’ experience . The complainant is also concerned that CR is biased as the insurer paid it. Additionally, the complainant says that the insurer has acted unreasonably in telling him the claim was accepted and would be cash settled then changing its position and denying the claim. However, he acknowledges that he did not rely to his detriment on the insurer’s initial indication (for example, by incurring financial costs). Insurer disagrees with the complainant CR inspected the pool on 18 July 2022 and reported:  the initial tearing of the pool liner was a result of normal wear and tear, not heavy rainfall  the liner had reached the end of its serviceable life  the liner had further deteriorated after the pool was emptied due to UV exposure  part of the pool frame had moved  in 2018, the complainant had made a claim concerning movement in the same area  historical aerial images showed the movement had been present since 2017, so it was not due to recent heavy rainfall but was pre-existing. Based on CR ’s report, the insurer says the complainant has not proven the damage claimed was due to a storm. Further, it says that CR’s repo rt shows the damage is due to wear and tear and gradual deterioration. The PDS states on pages 79 and 80 that it does not cover loss or damage caused by, arising out of or in connection with:  ‘ Rust, corrosion, rot, mould or gradual deterioration’, and  ‘Loss or damage caused by wear and tear through normal use’. The insurer notes that AG has suggested that the pool frame’s structural integrity had been compromised by rainwater flow (runoff). It notes that the Storm insured event does not cover loss or damage caused by: • rain, hail or snow after it reaches the ground (but we may cover that under the insured event ‘Flood’ as flood or water runoff). The ‘Flood’ insured event provides cover for loss or damage caused by a flood or water runoff but specifically excludes loss or damage to swimming pools. The insurer concedes that CR did not inspect the pool until 2.5 months after AG did so. It also accepts that the damage may have been exacerbated during that period. However, the insurer says that is irrelevant given that AG had already concluded that the pool was beyond repair and required replacement. Determination | Case number: 888425 Page 6 of 8 The insurer acknowledges the complainant was initially told on 9 May 2022 that the claim had been accepted. It says this was incorrect and the result of human error. It submits that it identified and corrected the error the same day it was made. The insurer says in the circumstances and as the complainant did not suffer a loss due to the error, it acted fairly in correcting the error, concluding investigations and denying the claim. Insurer is not required to cover the claim I am not satisfied that complainant has proven on the balance of probabilities that the damage was caused by an insured event. Rather, the available information indicates that the damage was likely due to excluded causes. The reasons for my finding include the following:  there is no information establishing the cause of the initial tear in the pool lining  the subsequent deterioration of the liner was due to UV exposure after the complainant emptied the pool, not a storm or any other insured event  while AG says the pool needs to be replaced due to stormwater runoff, the Storm insured event does not cover damage caused by rain once it reaches the ground and the Flood insured event does not cover damage to pools  CR has concluded the observed damage is not due to storm but the result of excluded wear and tear and gradual deterioration  CR’s report is supported by careful analysis and historical images  no expert evidence in response to CR’s report ha s been provided. I am unable to accept the complainant’s criticisms of CR. 2.5 months is not a significant amount of time and I am not satisfied that such a period means CR’s findings are unreliable. I also do not ag ree with the complainant’s submissions that CR lacks appropriate expertise and is biased. CR is an independent expert building consultant and is entitled to be paid for its expertise. I accept that the pool likely deteriorated in the months after the complainant lodged the claim. However, I do not consider that to be a material consideration given AG had examined the pool just over a week after lodgement and found it was already beyond repair. The insurer’s mistaken indications on 9 May 2022 that the claim had been accepted would be cash settled are regrettable. However, the complainant’s position was not prejudiced as a result. H e has conceded he did not rely to his detriment on the insurer’s initial indication. In the circumstances and as the insurer rectified its mistake within hours, I am satisfied that it is fair and reasonable to permit the insurer to alter its coverage position (as it did). 2.2 Is the complainant entitled to any payments? Yes. As the insurer asked the complainant to obtain a report and quotes, it is required to reimburse fees charged (upon proof of payment being provided, capped at a $5,000 maximum). Further, the insurer’s claim handling has unreasonably caused the comp lainant stress and frustration. It is to pay him $500 in non-financial loss compensation. AFCA may require in surer to contribute to a complainant’s professional costs The AFCA rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. Determination | Case number: 888425 Page 7 of 8 When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Insurer is required to reimburse expert fees proven to have been paid The insurer’s claim notes confirm that on 1 May 2022, it asked the complainant to obtain and provide a damage report and repair quotes. I am satisfied that it did so to assist with the cl aim’s assessment. As noted above, the complainant then obtained AG ’s report and quotes. AG ’s reports and quotes did not assist the complainant he is entitled to be covered. However, he obtained them at the insurer’s request, to assist it in assessing the claim. In the circumstances, I am satisfied it is reasonable to require that the insurer reimburse the complainant any fees he proves he has paid to AG for the report and quotes. The $5,000 maximum cap applies. AFCA can award compensation for poor claim handling Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Complainant is entitled to non-financial loss compensation The complainant says that the insurer was unacceptably slow in assessing his claim and acted immorally in telling him the claim was accepted and would be cash settled, only to change its position hours later. He says the insurer’s conduct has caused him stress, frustration and inconvenience. The claim was lodged on 24 April 2022. The insurer made its claim decision in mid September 2022, some four and a half months later. This is slightly outside the four month period referred to in the General Insurance Code of Practice. I have determined that the insurer’s change of position did not materi ally impact on the complainant’s position in terms of claim coverage. However, it is clear from the insurer’s claim notes and his submissions that the change of position caused the complainant confusion, stress and frustration. The insurer could and should have avoided making the mistake. In the circumstances, I am satisfied that the insurer should pay the complainant $500. 2.3 Why is the outcome fair? The complainant has not shown he has suffered a loss claimable under the policy or that the insurer has caused further damage. Accordingly, it would not be fair to require the insurer to cover the claim. As the insurer asked the complainant to obtain a report and quotes, it is fair that it reimburses fees he incurred. It is also fair that it pays $500 in compensation for the stress it’s claim handling caused. Determination | Case number: 888425 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.