Determination 888212

Storm and hail damage claim: insurer limited liability for roof replacement on alleged defective workmanship, sought further assessment and delayed settlement

FirmSuncorp Group
Decided2023-05-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants' storm and hail damage claim was cash settled at a reduced amount by the insurer, which also sought further assessments after about three years. AFCA found for the complainants, requiring a fresh quote for full roof replacement with a 15% uplift, reimbursement of unnecessary works, $4,000 NFL and a written apology, but refused a premium refund.

The insurer did not discharge its onus to show defective workmanship excluded or reduced cover, and its poor claim management caused unreasonable delay warranting non-financial loss compensation under Rule D.3.3.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disastercorrect recordspay claimpay compensationpay non financial lossrefund fees or charges

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 888212 Financial firm AAI Limited Determination | Case number: 888212 Page 1 of 12 Case number: 888212 26 April 2023 1 Determination overview 1.1 Complaint The complainants hold a home building and contents policy (policy) with the financial firm (insurer). In March 2020, the complainants lodged a claim for storm damage to the insured property including the roofs (multiple level roof design) and internal water ingress. The insurer accepted the claim, however, originally limited its liability to the internal water ingress damage. Further, the insurer said cover under the claim was subject to the complainants arranging recommended repairs to the roofs. The complainants arranged for these works and the appointed consultant confirmed evidence of hail damage to the roofs, which had been declined by the insurer. The complainants raised this with the insurer. The insurer arranged various additional assessments and finally accepted the roofs were hail damaged and required replacement. The insurer instructed the complainants to lodge a second claim for the hail damaged roofs and offered a cash settlement for the repairs less what it says are pre-existing defective workmanship issues with the roofs, which the complainants dispute. The insurer is now seeking a further assessment which the complainants say is unreasonable and a tactic for the insurer to further minimise its liability and delay settlement of the claim. The complainants are very dissatisfied with the insurer’s management of the claim, resultant delays and cash settlement offer. They say due to the delays additional water ingress damage has occurred and all these concerns have impacted on the family’s health a nd caused stress and inconvenience. The complainants are seeking for the insurer to:  cover the roof replacements  reimburse policy premiums since 2020  reimburse expenses incurred in arranging obviously unnecessary works to the roofs  a formal written apology from the insurer’s Chief Executive Office r (CEO)  non-financial loss compensation (NFL); and  removal of any negative remarks that may have been noted against them in their insurance records. 1.2 Issues and key findings Is the insurer ’s request for further assessment(s) fair? No. The available information shows the insurer has had adequate access and opportunity to investigate the cause and extent of hail damage to the insured building. This includes appointing building consultants, engineering consultants and its internal assessors to complete several onsite and desktop assessments since the claim was lodged in January 2020. It would not fair to allow the insurer to now seek further opportunity to assess and therefore delay settlement of the claim. Is the insurer’s final claim settlement offer fair? No. The insurer’s assessment of its liability and associated cash settlement offer to the complainants is not fair. The insurer has not shown an entitlement to reduce its liability based Determination | Case number: 888212 Page 2 of 12 on alleged defective workmanship or otherwise relating to replacement of the hail damaged roofs. The insurer is to settle the claim as provided in section 2.2 of this determination. Is the insurer required to reimburse the policy premium payments? No. It is reasonable to accept the complainants have had a poor experience under the claim. However, it would not be fair to require the insurer to refund the claimed policy premium payments given the insured property has remained covered under the policy for the entire period in question. Is the insurer required to pay NFL and offer a formal apology? Yes. The insurer’s overall management of the claim has been poor. It is has caused unreasonable delays and resulted in the claim remaining unresolved for close to three years. The complainants have experienced undue levels of stress, anxiety, inconvenience and delays over the life of the claim. It is fair that the insurer be required to pay the complainants $4,000 in NFL as per the AFCA Rules. Further, it is reasonable that the complainants be provided with a formal written acknowledgement and apology for its poor management of the claim. However, this does not have to be from the insurer’s CEO as demanded by the complainants. Why is the outcome fair? The determination is fair because the available information shows the insurer has failed to manage the claim or assess its liability in a reasonable and timely fashion. It is fair that the insurer be required to cover the cost to replace all the hail damaged roofs as well as reimburse the complainants for repair expenses they would not have incurred but for the insurer’s failure to appropriately assess its liability in the first instance. Given the poor experience and unreasonable delays experienced by the complainants for close to three years, it is fair the insurer pays them $4,000 in NFL as well as provide a formal written apology. 1.3 Determination This determination is in favour of the complainants. Within 14 days of receiving notice of the complainants’ acceptance of this determination:  the insurer is to arrange for an actionable quote from a suitably qualified repairer as detailed in section 2.2. The quoted amount is to be increased by a 15% uplift to allow for contingencies and transfer of risk to the complainants for arranging the repairs  subject to being provided with proof of payment, the insurer is to reimburse the complainants for payments they were pushed to pay towards make safe and/or maintenance works. These works would not have been required had the insurer correctly assessed its liability under the claim in the first place.  the insurer is to pay the complainants $4,000 in NFL in line with the AFCA Rules  the insurer is to provide the complainants with a written acknowledgement and apology for its poor management of the claim. However, this does not have to be from the CEO as suggested by the complainants The insurer is not required to reimburse the complainants for the policy premium payments received since lodgement of the claim. Determination | Case number: 888212 Page 3 of 12 2 Reasons for determination The available information shows this complaint mostly relates to the external damage caused to the insured building. There is no dispute the insurer has accepted to cover and authorise the repairs to the internal stormwater ingress damage. However, this has not been possible because of the issues in dispute between the parties regarding the external damage to the insured building. This determination will be limited to considering the parties’ positions re garding damage to the external roofs and concerns relating to the insurer’s management of the claim . 2.1 Is the insurer ’s request for a further assessment(s) fair? No. The available information shows the insurer has had adequate access and opportunity to investigate the cause and extent of hail damage to the insured building over the last three years. The insurer has had adequate opportunity to assess its liability After the claim was lodged in March 2020, the insurer appointed building consultants ‘R’ to assess the cause and extent of damage to the insured property. R has provided a report dated 25 March 2020, which confirms internal water ingress damage. With respect to the roofs, R says it found multiple issues/faults with the roofs’ design and installation at original build. In R’s opinion these works to the roofs were maintenance issues and/or should be considered under builder’s warranty. R says the complainants were reasonably unaware of the issues resulting in the damages. The insurer has provided a further report from R, this report is incorrectly dated providing the same date (25 March 2020) as its original report. In this further report, R says the internal water ingress issues relate to the roofs installation issues. R says the roof sheets were not turned down at the gutter ends and could be allowing water to run back into the ceiling cavities. With respect to the external damage, R says there is very little hail damage to the roof sheets, flashing and parapet capping and this is not the cause of the water ingress. R recommended a new claim be lodged for the hail damage as this is a separate event. R says the roof leaks are a long-term issue and not due to one event. Also, that the home is three years old and should not be experiencing such issues. The information shows the insurer accepted to cover the internal water ingress damage subject to the complainants arranging works to the roof recommended by R. The complainants arranged these works and the consultant that completed these works is said to have told the complainants there was clear evidence hail damage to all the roofs. The complainants raised this concern with the insurer who instructed R to re-attend and compete another assessment of the roofs. Following this assessment, R has provided a report (this report is also not correctly dated with the date being the same as the original report). The report refers to additional internal damage after the complainants had completed the required repairs. The report also confirms R’s acceptance of hail damage to the roofs of the dwelling, pool pump shed and rear pergola. The report also refers to hail damage to the evacuated tube hot water system on roof, storage tank and the solar pool mat on roof. In R’s opinion the hail damage was not the reason for the stormwater ingress but accepts there exists a claim for replacement of the roofs and flashing due to hail damage. R has Determination | Case number: 888212 Page 4 of 12 provided a scope of works and repair quote for the external damage included the roofs, pergola, hot water system and pool pump shed totalling $67,672.65. R recommended a cas h settlement under the claim as it would not be able to complete the repairs given the defective workmanship issues with the main dwelling’s roofs . The insurer appointed engineering consultants ‘M’ who, after completing a site inspection, have provided a report dated 23 October 2021. M notes there are four different roof levels which the complainants indicated had sustained damage due to an event. M noted but did not inspect the hot water system, fans, antenna’s, solar heating components, cables and light fittings. With respect to the roofs, M:  did not inspect the top roof as the complainants indicated this had already been repaired  says the ground floor roof appeared to have sustained some hail damage as well as foot traffic damage. M notes the insurer’s assessors report from approximately 12 months ago confirms hail damage to this roof  says damage to the lower ground level roof was consistent with the assessor ’ s report and is due to hail damage  says the damage to the pergola roof is consistent with the assessor ’ s report and is attributed to the hail event. M notes previous information suggests this damage is associated with the storm and hail event in January 2020. However, that there were concerns that the damage has at least in part, been impacted by building defects that may be better dealt with through builder’s warranty. The information shows the original builder had gone into bankruptcy with no option to seek cover under builder’s warranty. M has provided a detailed scope of works and quote in the amount of $129,4714.76, however, says $73,899.76 of this damage relates to the hail event while $55,572.00 is non- event damage (defective workmanship). The scope of works confirms the need for total roof replacements. The insurer has provided reports from its internal assessors who were tasked with undertaking site assessments as well as desktop assessments. An internal assessor report dated 30 October 2020 refers to completing a dual assessment with R. The assessment confirms hail damage to the upper level, middle level, lower level and patio roofs. Damage was also noted to the solar hot water and pool heating systems. The assessor notes major concerns with the construction of the roof flashings and poor workmanship around the middle level roof. The assessor says R cannot complete the repairs as it will not be able to warrant the works due to original poor construction. The assessor accepts R’s quote for $67,672.65. In the internal assessor report dated 2 November 2021, the assessor has considered M’s report and notes the event related damage is estimated at $73,899.76. He says this is $6,227.11 more than the insurer’s cash settlement to the complainants and so he is happy to allow a further payment to the complainants. He notes the accepted repairs cannot be completed without having to repair the defective workmanship. The assessor says the insurer can only cash settle based on M’s scope of works and pricing. The final internal assessor report dated 10 February 2022, refers to an internal assessor ‘J’ attending the insured property and meeting the complainants to discuss their concerns. J listened to their concerns and explained that the claim would proceed based on M’s report and not R’s. However, the defective workmanship will not be covered under the claim. Further, that he would offer a 10% contingency on the settlement to assist with obtaining private contractors. Determination | Case number: 888212 Page 5 of 12 The complainants say over the next several months they found it extremely difficult to find any builder that was prepared to complete the works for the amount cash settled under the claim. Also, due to the delays caused by the insurer some builders that may have been interested, walked away. However, the complainants were able to obtain building inspection report dated 8 June 2021 and r epair quote from building consultants ‘AB’. The AB report concludes the roofs have hail damage and water leaking into the home. For the roof sheets to be replaced, the cladding and foam needs to be removed, sheets replaced, new flashing installed properly, and the cladding/foam recompleted. The flashings are currently secured to the studwork behind the cladding. AB’s quote to replace the roofs is $168,278.00, however, it has since expired. It would not be fair to permit the insurer to further delay finalising the claim I acknowledge the insurer’s position that it wants to arrange a further assessment of the insured building to determine its liability under the claim. I also note the complainants’ view that this is not reasonable given the insurer has had adequate time and opportunity to assess its liability. I accept the complainants’ concerns and am of the view it would not be fair to allow the insurer to continue with its assessment process in the circumstances. I am satisfied the insurer has been given reasonable time and opportunity to assess its liability and obtain information in support of its position. The insurer has arranged and completed multiple assessments through builders, engineers and its internal assessors. It has also received rel evant information from the complainants’ consultants. I believe the information from these consultants is reasonably consistent in identifying the extent of damage and required repairs to the roofs, solar pool and hot water systems, pool shed and pergola roof. It would not be fair to allow the insurer to now, after three years, seek further information that may assist it in limiting its liability and/or at the very least cause further delays in finalising the claim. 2.2 Is the insurer’s final claim settlemen t offer fair? No. The insurer’s assessment of its liability and associated cash settlement to the complainants is not fair. The insurer has not shown an entitlement to reduce its liability based on the alleged defective workmanship or otherwise relating to the roofs replacement works. The policy covers accidental damage as well as damage from listed events The insurer provided the complainants with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events , including ‘ Storm ’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the PDS. The complainants have also paid an additional premium to include the optional benefit of accidental damage to the insured property. The policy defines accidental damage as loss or damage that occurs without intent. Cover under this benefit is also subject to the conditions, limitations and exclusion provided in the PDS. Determination | Case number: 888212 Page 6 of 12 The complainants have established an entitlement to cover under the policy The complainants are first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainants can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. There is no dispute the insured building and contents suffered loss or damage due to a significant storm event, which included hail. This is an insured event and therefore, I accept the complainants have shown, on balance, damage that is covered under the policy. The insurer says it is entitled to limit its liability by excluding cover for repairs it says are unrelated to the storm event. The insurer says these works arise from defective workmanship completed at the time of original construction in or around 2017. The onus rests with the insurer to show it more likely than not that the damage it seeks to exclude from cover is due to defective workmanship or construction. Insurer is to consider and settle its liability under the one (original) claim I note there seems to be three claims lodged against the policy over the period relevant to the consideration of this complaint. These being ‘Claim 058’, ‘Claim 388’ and ‘Claim 322’, of which I note Claim 058 and Claim 322 relate to storm/hail damage, while Claim 388 relates to water ingress caused by a damaged hot water system. Having considered all the information, I am not satisfied it was reasonable to require the complainants to lodge three separate claims, which would then be subject to three separate excess and be recorded as three claims against their claims history. I accept the available information shows, on balance, the damage subject of these claims can be traced back to the January 2020 significant storm event. Therefore, it is fair that the damage be considered under the one claim (Claim 058). Accordingly, the insurer is to arrange for the two other claims to be removed from the complainants’ claim history as well as refund any excess which may have been collected under these claims. The insurer has not established an exclusion applies to defeat the claim The insurer has sought to reduce it liability under the claim. It says not all the damage or issues noted with roofs and flashing are due to the insured event. Rather, that the consultants had determined there existed defective workmanship by the original builders and which is not covered under the policy. I acknowledge the consultants’ reports provided by the insurer do refer to concerns regarding the construction of the roofs. However, having carefully considered the various reports from R, M and the insurer’s internal assessor reports, not one of these reports provides any information which can reasonably be relied on to establish the presence of defective workmanship. Other than referring to defective workmanship, the insurer has not provided any information such as but not limited to the relevant Australian Standards (standards), building codes (codes) or industry practices in place at the time the insured home was constructed. There is no information to establishing how and if the construction is defective and did not meet the relevant standards, codes and practices applicable at the time of construction. I am satisfied, and consistent with AFCA’s approach on such matters, that in making such assertions to limit liability under a claim, the insurer is required to provide reasonably Determination | Case number: 888212 Page 7 of 12 compelling information in support of its decision to decline/limit its liability. In the absence of such information, it would not be fair to accept an insurer has fulfilled the onus to show an entitlement to rely on the policy exclusions to decline/limit liability under a claim. Accordingly, I am not satisfied the insurer has shown, on balance, an entitlement to limit its liability under the compl ainants’ claim based on the alleged presence of defective workmanship or otherwise. The insurer’s cash settlement does not fulfil its obligations under the policy For the reasons discussed above, I am not satisfied the insurer’s claim settlement offer ba sed on R’s quote and an additional payment of $6,227.11 ( as per M’s quote ) is fair. I believe it is fair that the insurer cover all the costs required to replace the roofs and any associated necessary works under the claim. The insurer is to also cover the cost to replace the other damaged items noted i.e. solar pool and hot water systems, shed roof, pergola roof and any other items which have previously been accepted under the claim. Within 14 days of receiving the complainants’ acceptance of this determi nation, the insurer is to:  arrange for fresh and actionable quote from a suitably qualified repairer who is prepared to honour the quote even if approached privately by the complainants. The instructions provided to the chosen repairer are to be clear i.e. they are not providing an assessment report for the purpose of liability but rather they are to provide a scope of works and quote to include: - replacement of all the roofs, other than the top roof if this has been repaired, including all works necessary to replace the roofs. If the top roof has not been replaced, this is to also be included in the quote - the costs associated with the repair/replacement, remove and installation of the hail damaged solar pool and hot water systems, shed roof, pergola roof  the insurer is to increase its settlement based on this quote by a further 15% to allow for contingencies and the transfer of risk to the complainants in arranging the repairs. The insurer is entitled to reduce its cash settlement for the above noted repairs by the amount that it has already cash settled the complainants under the claim. In the interest of efficiency, I believe it would be beneficial to instruct the repairer to also provide a scope of works and repair quote for all the internal water ingress damage as well. However, I leave this to the insurer’s discretion as to whether it arranges this now or chooses to address this once the external roof repairs have been completed given it has already accepted to cover and arrange the internal repairs under the claim. 2.3 Is the insurer required to reimburse the policy premiums? No. The insurer is entitled to the policy premium payments received over the period in question, as it remained on risk over this entire period. Complainants say the insurer should refund all policy premiums since 2020 The complainants believe the insurer should be required to refund all the policy premiums it has received from them from January 2020 onwards. They say the insurer failed to provide them with a level of service deserving of the policy premium payments. I accept the complainants have had very poor experience under the claim and this will be considered further under section 2.4 below. However, this does not mean the insurer is not entitled to the policy premium payments received from the complainants. Determination | Case number: 888212 Page 8 of 12 I am satisfied the insurer remained on risk for the insured property over the period in question. This means had the insured property suffered accidental loss or damage or from the listed insured events over this period, the complainants would have been entitled to seel cover for such additional damage. Therefore, despite the complainants ’ justified disappointed with the insurer’s management of this claim, it would be unfair to require the insurer to refund the policy premium payments to which it is entitled under the contract of insurance. I am satisfied he insurer is not required to refund the claimed policy premium payments in the circumstances. 2.4 Is the insurer to pay NFL and provide an apology? The insurer is to pay the complainants $4,000 in NFL as well as acknowledge and provide the complainants with a formal written apology for its failures in managing their claim. The AFCA Rules allow for an award of NFL in certain circumstances The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainants to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. Insurer to pay the complainants $4,000 in NFL in line with the AFCA Rules Having considered the information and AFCA’s approach to NFL, I am satisfied it is fair that the insurer be required to pay the complainants $4,000 in NFL. This is because of the unreasonable extent or degree of stress, anxiety, inconvenience and delays the complainants have experienced since the claim was lodged three years ago. I am satisfied the information shows the insurer’s overall management of the claim was not to a reasonable standard with poor communication, repeated changing of representatives appointed to the claim, incomplete assessment reports, failure to meet commitments by its assessors and inadequate assessments by its consultants in the early stages of the claim. Further, I note in June 2022 the insurer informed the complainants it would not be offering renewal of the policy. The reason provided was that the complainants had not confirmed the property had been repaired. I accept this will have only added to stress and anxiety already experienced given the complainants may not have been able to source alternative insurance cover given the existing damage in dispute. I find this especially concerning given the insurer was well aware the damage was in dispute. I accept the insurer’s poor management is the significant cause for the unreasonable extent of time it has taken to bring the claim to conclusion. Further, that this contributed to the difficulties faced by the complainants being able to find and retain consultants to assist with providing supporting information. Therefore, within 14 days of receiving notice of the complainants’ acceptance of this determination, the insurer to is to pay the complainants $4,000 in NFL. It is fair the insurer acknowledges and issues an apology for its conduct The complainants are seeking a formal written apology from the insurer’s CEO. I accept it is reasonable that the complainants expect a formal acknowledgement of their poor experience Determination | Case number: 888212 Page 9 of 12 and acceptance by the insurer of its poor management of their claim. However, I am not of the opinion this necessarily needs to come from the CEO. I accept a formal written acknowledgement and apology from a suitably senior representative from the insurer is adequate and reasonable in the circumstances. The insurer is to arrange this within 14 days of receiving the compla inants’ acceptance of this determination. 2.5 Why is the outcome fair? The determination is fair because the available information shows the insurer has failed to manage the claim or assess its liability in a reasonable and timely fashion. It is fair that the insurer be required to cover the cost to replace all the hail damaged roofs as well as reimburse the complainants for repair expenses they would not have incurred but for the insurer’s failure to appropriately assess its liability in the first instance. G iven the poor experience and unreasonable delays experienced by the complainants for close to three years, it is fair the insurer pays them $4,000 in NFL as well as provide a formal written apology. Determination | Case number: 888212 Page 10 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approac h is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions Words with special meanings Accidental loss or damage means loss or damage that occurs without intent. ... If an unknown defect is the cause of the damage If an incident covered by your policy damages your home and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the Determination | Case number: 888212 Page 11 of 12 unknown defective part of your home is also damaged by the same incident, we will fix this as well. We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at your home that you knew about (or should have reasonably known about). We will only pay you what it would have cost us to fix the damage from the incident covered by your policy or if we agree, you can pay us the extra amount it costs to rectify the structural or design fault at your home. If undamaged defective parts of your home will not support repairs If undamaged defective parts of your home you knew about (or should reasonably have known about) will not support repairing the damage caused by an incident covered by your policy, we will only pay what it would have cost us to repair the damage had your home not been defective. ... General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Defect, structural fault or design fault a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e.g. if there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defect). ... Optional Covers Accidental damage at the home We cover When you have home insurance, we cover your home for accidental loss (e.g. losing something) and accidental damage (e.g. breaking or damaging something) at the insured address during the period of insurance. When you have contents insurance, we cover your contents for accidental loss (e.g. losing something) and accidental damage (e.g. breaking or damaging something) at the insured address during the period of insurance. Determination | Case number: 888212 Page 12 of 12 3.3 Relevant AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.