Claim declined for water pipe burst on the basis of gradual deterioration exclusion

FirmHollard
Decided2023-07-04
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded$70,500
Non-financial loss—
Amount claimed$414,500
SourceAFCA PDF

Summary

The landlord insurer declined a building claim for a burst water pipe as gradual deterioration. AFCA found the claim valid, ordered the insurer to accept it, settle on engineer's scope, pay $70,000 repair costs, loss of rent and report costs, but no non-financial loss.

The complainant established a valid claim of a burst pipe and the insurer failed to prove the gradual deterioration or workmanship exclusions with expert evidence.

Issues

Subjects and remedies

home or building damagepay claimpay compensationreassess claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 887514 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 887514 Page 2 of 11 Case number: 887514 29 June 2023 1 Determination overview 1.1 Complaint The complainant holds a landlord policy with the insurer for her property. She lodged a claim on 10 October 2019 for a water leak which was discovered on 12 April 2019. She argued pressure from the Sydney water system broke her pipe, thus causing the “burs ting, leaking, discharge or overflow of water or liquids” event. The insurer declined the claim on 25 November 2019. It stated the claimed damage was assessed to be caused by gradual deterioration, which means the complainant was not covered by her policy for the loss. The complainant provided her own expert reports to counter the insurer‟s position and escalate the claim. On 1 June 2022, the insurer elected to uphold its decline of the claim after reviewing the new information. The complainant is dissatisfied with the outcome of her claim. She wants the insurer to pay her the full sum insured, loss of rent, ongoing repairs, and costs to obtain her reports. The insurer maintained its decision is correct upon review. It stated a reputable plumber should have installed the water lines properly, so the gradual occurrence of the leak leading to the current damage would mean the complainant has not established a valid claim. 1.2 Issues and key findings Is the insurer required to accept the complainant’s claim? It is an accepted procedure of the insurance claims process for the complainant to bear the burden of establishing a valid claim. If the complainant succeeds, the burden then moves to the insurer to apply its exclusions to deny the claim. If they apply, the claim can be excluded. The Panel is satisfied the complainant has established a valid claim. The information available shows the damage occurred from a burst water pipe causing the leak. The Panel finds that they damage is not excluded under the long term gradual leak. Therefore, the insurer is required to accept the claim under the terms and conditions of the policy. Loss of rental The insurer is to pay loss of rental under the terms of the policy. Other costs The insurer is to pay the complainant‟s plumbers costs of $500 and the complainant‟s engineers of $3,850. Determination | Case number: 887514 Page 3 of 11 Is the insurer required to pay the complainant for non-financial loss compensation? The AFCA approach awards a cap of $5,400 for an extraordinary degree of inconvenience during the claims handling process by the insurer. Length of time and stress are an expected part of a normal insurance claim. Available information on file shows ongoing communication between the parties and no egregious errors committed by the insurer. The insurer is not required to make payment non-financial loss towards the complainant. Why is the outcome fair? The complainant has provided supportive expert information and the panel is satisfied that the insurer has been given the opportunity to address all matters raised. Due to the delay, the complainant has sought to partially mitigate her loss and it would be unfair that she be penalised for this decision. The determination provides a fair outcome to both parties. 1.3 Determination This determination is in favour of the complainant. Upon acceptance of the determination the insurer is to settle the claim as set out in 2.2 hereof under: “Settlement of claim”, “Loss of rental” and “Other costs” Determination | Case number: 887514 Page 4 of 11 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party had the opportunity to address any issues raised by the other. This complaint is determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and past decisions where relevant. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only. 2.1 Claim is assessed within the parameters of the policy The complainant is covered for home and contents under her landlord policy Please note the complainant‟s Certificate of Insurance (COI) shows she did not purchase any optional covers. The Product Disclosure Statement (PDS) also confirmed the optional cover of „accidental damage‟ is unavailable for landlord policies lik e the one held by the complainant as shown on page 22 of the document. The relevant pages for the complainant are on page 17 and 58 of the PDS: Insured events – You are covered for loss or damage to your building or contents (as applicable) caused by ‘Bursting, leaking, discharge or overflow of water or liquids’ from pipes, taps, dishwashers, washing machines, baths, spas, sinks, toilets, basins, hot water systems, water tanks, refrigerators, air conditioners, roof gutters, rainwater downpipes, drainage and sewerage systems or aquariums at your home. Note: We will pay up to $500 to search for the unknown source of a leaking pipe but only if the water or liquid from the leaking pipe is causing permanent damage to your building or contents. You are not covered for – The cost to repair to the item from which the water leaked or escaped. Loss or damage caused by:  The gradual seepage of water or other liquids;  A leaking or faulty shower recess or base; and/or  An inadequate drainage system. We do not cover loss or damage to retaining and freestanding outdoor walls. Claims for your building – If your building is destroyed or damaged as a result of an Insured event and we accept your claim which occurs during the period of insurance, we will rebuild or repair your building as new, or pay you the cost of rebuilding or replacing it, at our discretion up to the building sum insured shown on your Certificate of Insurance. The general exclusions mentioned by the insurer regarding the claim are on 43 – 44: The following general exclusions apply to all covers under your policy. You are not covered for any loss or damage caused by or resulting from, or the costs incurred from or of:  Gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light;  Inherent defects, structural faults, faulty workmanship, or faulty design. Determination | Case number: 887514 Page 5 of 11 Expert Reports The complainant obtained a report from plumber (AA) who carried out the repairs and, in the invoice, dated 19 April 2019 stated: “ Attend concealed water leak to find it to be on a 20mm water service cold line at entry point to dwelling as per Invoice 23856 Retuned to site to excavate and remove dirt to expose 20mm copper water service, found burst section of pipe to be on the main line to the house at entry to the dwelling Removed dam aged section of pipe and installed new section of copper pipe and connections ” AA Stated further: “ Burst section of the pipe has no underlying imperfections or damages, leak was likely caused by sudden surge of pressure.” The complainant also provided a copy of the water bill which showed the daily average usage had increased from 472 litres to 9583 litres in the water bill dated 14 May 2019. The complainant obtained a report by an engineer(S) who provided a report dated 14 April 2021 as follows: Based on our inspection and review of the information, we agree that the settlement to the building is as a result of the failed water pipe. The location and severity of the settlement is concentrated around the areas where the pipe had burst. The severity of the settlement is consistent with this cause of failure/damage. A geotechnical study of the surrounding area indicates that the site would be classified as Class M, a moderately reactive soil. This is not consistent with the damage that has occurred to the dwelling and therefore we do not believe that the settlement and damage is as a result of the reactive soil. The plumber inspected the failed supply water pipe and advised that the pipe was found to be a copper pipe and in reasonable condition. The plumber advised that the failure is due to fluctuations in pressure from the municipal source. Copper is a suitable material for ground water pipes and typical for a house of this age. Copper pipe are used due to the corrosive resistance and high strength. The pipe was found to be in acceptable condition and therefore we agree with the plumbers finding that the pipe failure was due to water pressure surge. The current condition of the dwelling, following the settlement, is poor and we believe that repairing should be completed as soon as possible. We would recommend that the below works are completed. However, prior to any works being completed, we would recommend that the existing floor structure and footings is re-supported and raised using resin injection techniques. Once the dwelling has been leveled again and the structure is supported, the remaining repair works shall be completed. - External works o The cracked render shall be removed and replaced to the extent of the crack plus an additional 30mm each side. The render should be patch with rendering mesh to Determination | Case number: 887514 Page 6 of 11 help prevent future cracks. It also recommended that joints are placed in the render at the windows to help prevent future cracking. o The front porch ceiling shall be re-supported as required and the trims replaced. o The front door shall be removed and the frame corrected to prevent jamming. o All cracked external paving shall be removed and replaced. o All cracked external tiles shall be removed and replaced. o All cracked eaves shall be removed and replaced. o Expansion joints shall be resealed. o All damaged external window trims and seals shall be replaced. - Internal works o All cracked and/or damaged plasterboard walls and ceiling shall be removed and replaced. All damaged skirting shall be removed and replaced. o All damaged floor tiles shall be removed and replaced. o Bathrooms shall have the waterproofing replaced. All tiles shall be removed and floor/walls prepared for new waterproofing. Following completion of the waterproofing, all floor and wall tiles shall be replaced. o All doors shall be removed and the frame corrected to prevent jamming. We would also recommend that the front steps and concrete that have also settled and cracked due to the failed water pipe be removed and replaced. The complainant‟s builder (EC) provided a report dated 10 August 2022 as follows: - I have inspected the building at the above property with my engineer - The building is in unrepairable state due to structural damage and has major cracks to the walls, floorings and ceiling. - Cost to rebuilt similar house would cost approximately $700,000 excluding GST. - the cost excludes any council costs, demolition, removal of debris, architectural costs and preparation of the site prior to building. The insurer arranged an assessment of the property by JL who stated that an engineer was required to assess the property but found: The damages sustained to the residence are a direct result of escape of water. The incident was a water leak happening for nearly 6 months. Insured mentioned that the tenant did not noticed any leakage until mould starting to grow inside of the property. Insured engaged a private plumber to investigate and fix the problem, however, after they exposed the brick piers and joists they noticed that the piers had sunk into the mud leaving the joists, over 400mm overhanging and without any support, which caused multiple cracks to the whole property. SCE engineer provided a report, on behalf of the insurer, dated 15 November 2019 as follows: OPINION o CAUSATION Determination | Case number: 887514 Page 7 of 11 o Based on our observations, the left side of the dwelling has experienced significant subsidence (21 mm). The movement, based on the Insured‟s chronology and evidence of repairs has pre-dated the Insured‟s purchase of the dwelling. o It is likely the existing flooring to the left side of the dwelling experienced extensive long-term wet rot of timbers, due to inadequate subfloor ventilation, and the render covering the end bearer. This historic deterioration of flooring is likely to be cause of the floor sag. This damage has pre-dated the Insured‟s ownership based on the Insured‟s chronology. o The floor framing repairs in their current state do not comply with Australian Standards due to the unsupported cantilever length of the floor joists supporting the roof load over. These joists are likely to be experiencing some long-term creep deflections. o The leaking pipe which is understood to have been below the slab is not considered to have caused any building movement. Leaking pipes typically give rise to a swelling response (clays absorb moisture) rather than a subsidence response. We also note that had the 20 mm of subsidence have been the result of the damaged pipe; extensive cracking would have been present at the time of our inspection. o Rot was noted to the end bearer in areas not proximate to the damaged pipe suggesting the principal cause of the movement as a building defect and long-term deterioration. CONCLUSIONS i. The subsidence of the dwelling is the result of long-term deterioration, wear/ tear and inadequate repairs of the floor framing, pre-dating the Insured’s purchase of the dwelling. ii. The leaking pipe is not considered to be the cause of the subsidence of the left side bedrooms of the dwelling. 2.2 Insurer is required to overturn its claim decline Insurer based its claim decision on available information on file. The complainant said she wants the full building sum insured for $414,500 in accordance with her COI for her claim. To do so, the complainant needs to establish a valid claim for her insured event, which is the „bursting, leaking, discharge or overflow of water or liquids‟ from a leaking pipe. JL confirmed the existence of a water leak, mould, and cracking around the property. The panel notes that JL acknowledged the claimed loss is a direct result of escape of water which has been leaking for about six months. However, it could not ascertain the cause of this leak, and so recommended an engineer to investigate. S, the engineer, concluded the leaking pipe is not the cause of building movement (sagging) on the left side of the property. Rather, the cause of damage is more consistent with long- term deterioration and inadequate repairs of the floor framing. CoreLogic indicated the house Determination | Case number: 887514 Page 8 of 11 was built in 1960, bought by the complainant in 2001, and no structural floor repairs were done since she purchased it until the leaking pipe was discovered in early 2019. The insurer appears to accept that some of the damage is related to the burst water pipe contending “it is a matter of professional practice for a plumber to be fami liar with the pressure and variations thereof coming from a municipal water source when designing and installing water lines at the property, and the failure of such lines is indicative of a failure on a design or workmanship level”. The insurer has maintained its denial based upon the failure in the pipe being due to the excursions in the policy: - Gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light - Inherent defects, structural faults, faulty workmanship or faulty design Sufficient evidence from complainant to establish valid claim The panel is satisfied on the information provided, upon balance, that the complainant has established a valid claim. It accepts that the damage to the house was caused by the bursting pipe. The water usage shows that there was a sudden increase in water consumption which was consistent with a sudden failure of the copper pipe. The panel is satisfied a valid claim has been established by the complainant as the result of the bursting pipe. Burden of proof has moved to the insurer in the circumstances It is up to the insurer to show that the claim is excluded under the policy or otherwise. The insurer has based its rejection of the claim based upon the gradual deterioration and/or inherent defects, structural faults, faulty workmanship or faulty design, which it says is excluded under the policy. The report by AA, the plumber who carried out the repairs, that there were no imperfections or damages to the pipe is compelling. The panel is not satisfied that the insurer has provided sufficient information to show that the condition of the pipe or the workmanship was the cause of the bursting. The contention by the insurer that the failure is an indicative failure of design or workmanship has not been supported by any expert advice. The panel accepts that the broken water pipe is covered under the terms of the policy. Insurer to accept the claim The panel found the report by S more compelling that by SCE. The panel accepts that the majority of damage is due to the settlement of the property caused by the failed water pipe and not due to reactive soil. The panel does not accept EC builders statement that the property should be replaced. The report failed to provide sufficient information to reach such a conclusion. The panel, however, does accept the works including the raising of the floor and internal and external works as set out in S‟s report should be the basis for assessment Determination | Case number: 887514 Page 9 of 11 Settlement of claim. The insurer is to obtain an up to date actionable quotation for the repairs based upon the works set out in S‟s report. The repairs should be able to be commenced within 3 months of acceptance by the complainant. The panel considers that this claim would be appropriate to cash settle at the discretion of the complainant. If the matter is cash settled the claim is to be uplifted by 15% to cover contingencies and loss of guarantee. Should the cost of repairs exceed the insured sum, the insurer is entitled to settle the claim of the total sum insured, subject to the terms and conditions of the policy. The complainant has paid $70,000 towards repairs to make the premises habitable. The panel accepts that this payment was undertaken by the complainant to help mitigate the loss and make the premises inhabitable and rentable. Fairness requires the insurer is to refund this sum, within two weeks of presentation of the itemised bill and proof of payment It is fair that this sum is be independent and in addition to the amount established by the actionable quotation or any amount paid in settling the total sum insured. Loss of Rental The policy provides loss of rental being: The lesser of: - 12 months rent; or - 10% of your building sum insured; or - the actual rent you lose The panel considers that the complainant suffered the loss of more than 12 months rental due to the insurer‟s denial of the claim. In the circumstances it is fair that the insurer pays the lesser of 12 months rental or 10% of the building sum insured as set out in the policy. Other costs. The insurer is to pay AA‟s cost of finding the damaged pipe of $500 and the cost of S ‟ s fee of $3.800. The complainant is to provide a copy of the invoices together with proofs of payment. The insurer is to pay the amounts within two weeks of receipt of the information. 2.3 Why is the outcome fair? Insurer not required to pay non-financial loss compensation The insurer is not required to make payment non-financial loss towards the complainant. Length of time and stress are an expected part of a normal insurance claim. Available information on file shows ongoing, responsive communication between the parties and no Determination | Case number: 887514 Page 10 of 11 egregious errors committed by the insurer against the complainant to delay the claim or suchlike. The panel acknowledges the complainant provided a letter of support from her husband/co- insured ‟s psychologist, detailing the stress this claim has put him under. The letter recommends a prompt completion of the insurance claim to resolve the matter. Respectfully, this has been a complaint which follows the AFCA process from start to finish which would naturally require time since the complainant wants the final stage of an ombudsman decision on her case. Determination | Case number: 887514 Page 11 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in industry We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.