Claim denial for upstairs bathroom water damage; cash settlement amount for downstairs bathroom

FirmBlue Zebra
Decided2022-11-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,980
Non-financial loss$500
Amount claimed$12,980
SourceAFCA PDF

Summary

The complainants claimed for water damage to two bathrooms after a waterproof membrane failed. AFCA found the upstairs damage was excluded as gradual deterioration, but required the insurer to pay the downstairs repair cost based on the complainants' quote, plus interest and $500 for a delayed complaint response.

Accidental damage policy excludes gradual deterioration and wear and tear; cash settlement must reflect the cost to the complainants of repair, per the Code's requirement to act fairly.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Blue Zebra determinations · Find similar determinations

Text of the determination

Determination Case number 886938 Financial firm Blue Zebra Insurance Determination | Case number: 886938 Page 1 of 8 Case number: 886938 18 November 2022 1 Determination overview 1.1 Complaint The complainants hold a home insurance policy with the financial firm (the insurer). The waterproof membrane in their upstairs bathroom failed, and water leaked into the downstairs bathroom. They lodged a claim for the damage to both rooms. The insurer denied cover for the damage to the upstairs bathroom, and offered to pay $3,444.16 for the damage to the downstairs bathroom. The complainants say the insurer:  should cover the damage to the upstairs bathroom  should pay more for the damage to the downstairs bathroom  has caused stress, inconvenience, and delay by mishandling the claim. 1.2 Issues and key findings Does the policy cover the upstairs bathroom damage? No. The damage was caused by gradual deterioration of grout and sealant. This led to gradual deterioration of the waterproof membrane. The policy excludes cover for gradual deterioration. The insurer is not required to cover the damage to the upstairs bathroom. Should the insurer pay more for the downstairs bathroom damage? Yes. The best available estimate of the cost of repairing the downstairs bathroom is the quote obtained by the complainants dated 11 December 2021 totalling $12,979.56. The insurer’s settlement payment should be based on this quote. Are the complainants entitled to further compensation? Yes. The General Insurance Code of Practice says insurers will make a decision about a complaint within 30 days. The insurer took 59 days to make a decision about the complainant’s complaint. The insurer should pay $500 compensation for this delay. 1.3 Determination This determination is mostly in favour of the insurer. The insurer is not required to cover the damage to the upstairs bathroom. The insurer must pay $12,979.56, plus interest at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth) from 11 December 2021, for the cost of repairing damage caused by water leaking from the upstairs bathroom. The insurer must pay $500 compensation for non-financial loss. Determination | Case number: 886938 Page 2 of 8 2 Reasons for determination 2.1 Does the policy cover the upstairs bathroom damage? Onus on complainants to establish claimable loss When making a claim, an insured party has the onus of establishing they suffered a loss for which their insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. Policy covers accidental damage The cover provided by the policy is set out in the product disclosure statement. Relevant policy terms are quoted in section 3.2 of this determination. The policy is an ‘accidental damage’ policy, meaning it covers all accidental damage unless it is specifically excluded. The insured property was accidentally damaged. Therefore, the complainants have established a claimable loss. The insurer must accept the claim, unless it can establish the application of a relevant policy exclusion. The policy excludes cover for damage caused by wear and tear or gradual deterioration. Complainants lodged claim for leak On 28 September 2021, the complainants emailed their insurance broker and said their upstairs shower was leaking. They said water was leaking through the floor of the upstairs bathroom and the roof of the downstairs bathroom. They said a leak had occurred in the same location in 2019. The complainants provided an invoice dated 1 August 2019. The invoice said water was getting behind the wall and floor tiles, and this could cause further damage if left untreated. The invoice said the shower and bathroom were regrouted, resin was injected behind the loose tiles, and silicone was installed on the shower screen and wall-floor and wall-wall joints. Expert reports say damage caused by gradual deterioration On 4 October 2021, the broker lodged the claim with the insurer. The insurer appointed a plumber, who inspected the home on 12 October 2021. The plumber said:  the upstairs shower had perished grout and sealant  sealant applied in 2019 had not adequately bonded, allowing water to leak behind it  the waterproof membrane had perished due to long-term exposure to moisture  water leaked to the lower floor due to the lack of a functional waterproof membrane. The insurer appointed an engineer, who inspected the home on 1 February 2022. The engineer said:  the damage was caused by a ‘compromised bathroom shower floor waterproofing system’  tiles in the upstairs bathroom were drummy, which was evidence of a long-term water leak  damage to the grout, sealant, and waterproof membrane was ‘consistent with age related wear and tear and deterioration’ . Determination | Case number: 886938 Page 3 of 8 The parties have not provided any other expert reports commenting on the cause of damage. The expert reports indicate the damage occurred because of the gradual deterioration of grout and sealant, leading to gradual deterioration of the waterproof membrane. The policy excludes cover for damage caused by gradual deterioration. Therefore, the insurer is entitled to deny this aspect of the claim. No information to refute experts’ findings The parties agree that the waterproof membrane in the upstairs bathroom failed. The complainants do not accept that the waterproof membrane failed due to wear and tear. However, they have not offered any other explanation for why the membrane failed. There is no evidence that the membrane was damaged by any sudden event. The complainants say the insurer’s assessor suggested the damage may hav e been caused by an earthquake. There was an earthquake about 150 kilometres from the home on 22 September 2021, about a week before the complainants reported the damage. However, the engineer said this would not have caused any structural damage to the home, and would not have affected the waterproof membrane. The complainants say no one has visually inspected the waterproof membrane (which is covered by tiles), so any conclusion about the cause of its failure are ‘speculative’. The plumber said invasive t esting was required for ‘further substantiating findings’. Further testing may provide more information about the cause of the damage. However, the insurer is only required to establish the application of an exclusion on the balance of probabilities (i.e. that it is more likely than not). The available information shows it is more likely than not that the waterproof membrane failed because of gradual deterioration. 2.2 Should the insurer pay more for the downstairs bathroom? Insurer agreed to pay for downstairs bathroom The insurer denied the part of the claim relating to damage to the upstairs bathroom. However, it agreed to pay for the damage to the downstairs bathroom. The insurer has offered to pay a cash settlement for the cost of repairing the downstairs bathroom. It has not offered to arrange repairs. Insurer should pay what repairs would cost complainants The policy says the insurer will ‘ pay for the cost of repair ’. It does not say whether the ‘cost of repair’ is the cost to the complainants or the cost to the insurer. Repairs may be more expensive for the complainants than the insurer, because the complainants do not have the insurer’s industry knowledge and bargaining power. If the insurer only pays what it would have cost the insurer to repair the damage, it may not be enough for the complainants to repair the damage. The General Insurance Code of Practice (to which the insurer subscribes) requires insurers to act fairly to their customers. The insurer must act fairly when deciding how to settle a claim. The insurer decided to cash settle the claim, and did not offer to repair the damage. It would not be fair to apply discounts that would have been available to the insurer, but will not be Determination | Case number: 886938 Page 4 of 8 available to the complainants. To be fair, the insurer must pay what it would cost the complainants to repair the damage. Settlement should be based on complainants’ quote The insurer appointed a claims adjuster, who inspected the home on 7 October 2021. The claims adjuster provided a scope of works for the repair of the downstairs bathroom. The scope of works was costed at $3,444.16. The complainants obtained a quote dated 11 December 2021 for $12,979.56 to repair the downstairs bathroom. The quote listed the work to be done, but the insurer noted it did not list the price of each item. The insurer did not say any of the listed work items were unnecessary, or that the amount quoted was unreasonable. On 27 October 2022, the complainants’ builder provided a list of prices for each work item, which added up to $16,260. The insurer has not commented on the updated quote. The claims adjuster’s scope of works is more detailed than the complainants’ builder’s quote. However, the claims adjuster’s est imate of $3,444.16 was not actionable. The complainants were not given the option of having the downstairs bathroom repaired for $3,444.16. The insurer offered to settle the claim by paying $3,444.16 (less excess) and did not offer to repair any damage. Th e complainants’ builder’s quote is more likely to reflect what it would cost the complainants to repair the damage. Therefore, the cash settlement should be based on this quote. Insurer not required to pay for delay The complainants’ builder’s quote was $1 2,979.56 on 11 December 2021 but increased to $16,260 by 27 October 2022. The complainants say the cost of building work has increased due to market conditions. Throughout the claim, the insurer has told the complainants it will not arrange repairs. This means it is the complainants ’ responsibility to arrange repairs. The complainants have not been made to wait for the insurer to arrange repairs. The insurer has not prevented the complainants from repairing the home. Therefore, the insurer is not required to pay for any loss caused by a delay in starting repairs. The insurer should pay $12,979.56 (less excess), plus interest from 11 December 2021, for the cost of repairing the downstairs bathroom. 2.3 Are the complainants entitled to further compensation? AFCA can award compensation for non-financial loss Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. The complainants say the insurer has caused them stress and inconvenience by taking an unreasonably long time to settle the claim. Determination | Case number: 886938 Page 5 of 8 Insurer took too long to respond to complaint On 4 October 2021, the broker lodged the claim with the insurer. The insurer appointed a plumber, who inspected the home on 12 October 2021. On 5 November 2021, the insurer told the broker it was denying cover for the damage to the upstairs bathroom. It offered to pay $3,444.16 for the damage to the downstairs bathroom. On 20 January 2022, the insurer’s notes say the complainants said the damage could have been caused by an earthquake. The insurer appointed the engineer, who inspected the home on 1 February 2022 and completed their report on 14 February 2022. On 22 February 2022, the insurer sent a copy of the engineer’s report to the broker. It said the engineer’s report indicated the damage was not caused by an earthquake. It maintained its offer to settle the claim for $3,444.16 (less excess). On 18 March 2022, the broker asked the insurer to review the claim through its IDR (internal dispute resolution) process. The insurer reviewed the claim and provided its IDR response on 16 May 2022. The General Insurance Code of Practice says insurers will make a decision about a complaint within 30 days. The insurer took 59 days to provide its IDR response. The insurer did not tell the complainant its IDR process was delayed and did not give any reason for the delay. In my view, this delay warrants compensation for non-financial loss in the sum of $500. Earthquake investigation did not affect outcome The complainants say the insurer’s assessor suggested the damage may have been caused by an earthquake, and they should mention this to the insurer. The complainants say the assessor’s suggestion was inapp ropriate, and it led to the insurer disproportionately focusing on whether the damage was caused by an earthquake. Before the earthquake issue was raised, the insurer assessed the claim based on the plumber’s report, which said the damage was caused by gra dual deterioration. After the earthquake issue was raised, the insurer appointed the engineer, who also said the damage was caused by gradual deterioration. The appointment of the engineer did not affect the outcome of the claim. Assessing the property for earthquake damage did not cause the complainants to suffer a loss. The insurer is not required to compensate the complainants for this. Insurer not responsible for delay in starting repairs The damage to the complainants’ home has not been repaired. The c omplainants say this is causing stress and inconvenience because they are only able to use one bathroom, and they are concerned that the potential cost of repairs will increase over time. As stated above, it is the complainants ’ responsibility to arrange repairs, and the insurer has not prevented the complainants from repairing the home. Therefore, the insurer is not responsible for the delay in starting repairs. The insurer offered to pay $3,444.16 for the cost of repairing the downstairs bathroom. For the reasons stated above, it should have offered to pay $12,979.56. This determination awards the complainants interest from 11 December 2021, the date of the quote for the repair of the downstairs bathroom. AFCA considers that if a complainant is Determination | Case number: 886938 Page 6 of 8 entitled to money, and there is a delay in receiving payment, an award of interest will usually be sufficient to compensate for the delay. Insurer not required to pay further compensation As stated above, the insurer took too long to respond to the complainants’ comp laint and provide its IDR response. The insurer should pay $500 compensation for this. Other than this, the insurer’s claim handling has been reasonable. Therefore, the insurer is not required to pay further compensation outside the policy terms. Determination | Case number: 886938 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy terms Product Disclosure Statement How we settle your claim - buildings (page 12) How we settle your claim - buildings When your buildings are destroyed or damaged during the period of insurance we will pay for the cost of repair or replacement with new material without deducting an amount for wear and tear and depreciation. … If you request a cash settlement or if reinstatement is not carried out, we will only pay the equivalent of the cost of repair or replacement with similar material less a reasonable amount for wear and tear and depreciation. Any rebuilding or repairing of your buildings must commence wit hin 6 months of the date that the destruction or damage occurred. If it does not commence within 6 months (or any other period which we agree with you in writing) you may have to pay any increase in cost caused by the delay. WHAT YOU ARE COVERED FOR (pages 30 – 31) What you are covered for – buildings and/or contents Subject to the terms, conditions, limits and exclusions of the policy, your buildings and/ or content s as set out on your policy schedule will be covered if they are accidentally destroyed, accidentally lost or accidentally damaged during the period of insurance. What you are not covered for – buildings and/or contents In addition to the ‘General exclusions’ section (beginning on page 60 ) we will not provide cover for your buildings or contents when they are destroyed, lost or damaged by any of the following events: Determination | Case number: 886938 Page 8 of 8 …  rust, corrosion, gradual deterioration, depreciation, wear or tear; …  a defect in an item, faulty workmanship, structural defects or faulty design that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e.g. if there are signs that a defect previously c aused damage, we will not pay a later claim for further damage from this defect); … GENERAL EXCLUSIONS (pages 60 – 61) You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves any of the following: …  a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e. g. if there are signs that a defect previously caused damage, we w ill not pay a later claim for further damage from this defect); …  wear, tear, gradual deterioration (including scratching and denting over time), fading; …  rust, corrosion, oxidisation, mould or mildew; … 3.3 One complainant represented both complainants One complainant made submissions on behalf of both complainants. In this determination, statements by one complainant are treated as if they were made jointly by both complainants.