Home / Allianz Australia / Determination 886935

Determination 886935

Flood inundation above 300mm declined; no flood cover; non-financial loss sought

FirmAllianz Australia
Decided2022-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home was inundated after heavy rain and she sought cover for damage up to 90mm above floor level plus non-financial loss. AFCA found the inundation above 300mm was flood, which is excluded without flood cover, but ordered $2,500 for non-financial loss due to the insurer's misleading acceptance and delays.

Without optional flood cover, damage from inundation mixed with overflow from a watercourse is excluded as flood, and the complainant bore the onus to show the damage was from stormwater runoff.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 886935 Financial firm Allianz Australia Insurance Limited Determination | Case number: 886935 Page 1 of 6 Case number: 886935 30 November 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim on 3 March 2022 on her home and contents policy held with the financial firm (insurer) after her home was inundated following a significant rainfall event. The insurer appointed hydrologist WT determined the property was damaged by stormwater runoff up to 300mm above ground level. Damage over 300mm and up to 90mm above floor level was considered flood. Based on the hydrologist report, the insurer accepted liability for damage up to 300mm above ground level, including contents but declined liability for damage above that level. The complainant says all the damage is from stormwater runoff and backflow. The complainant says the insurer initially accepted damaged up to 300mm above floor level and it took 20 days to change this advice, which caused her to suffer financial loss. The complainant seeks cover for damage due to inundation of the property to 90mm above floor level plus compensation for non-financial loss caused by the insurer’s handling of the claim. 1.2 Issues and key findings Is the insurer’s settlement of the claim fair in the circumstances ? Yes. The available information establishes that most likely the inundation of the home over 300mm above ground level was caused by flood which is not covered under the terms of the policy. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer ’ s handling of the claim has caused the complainant an unusual degree of physical inconvenience or loss of enjoyment or peace of mind. It is fair that the insurer pays compensation of $2,500. Why is the outcome fair? The outcome is fair because the available hydrology supports a finding that the inundation over 300mm above ground level was flood which is not covered under the terms of the policy. The insurer has met its liability for this damage and other than pay compensation for non- financial loss it is fair for the insurer to deny liability for the balance of the claim. 1.3 Determination This determination is in favour of the insurer. Within 14 days of the complainant’s acceptance of this determination the insurer is to pay the complainant $2,500 for non-financial loss. The insurer has otherwise met its liability under the terms of the policy and need take no further action. Determination | Case number: 886935 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s settlement of the claim fair in the circumstances? Yes. The available information establishes that most likely the inundation of the home over 300mm above ground level was caused by flood which is not covered under the terms of the policy. Complainant has onus to establish claim falls within terms of the policy It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is, more likely than not) that the loss or damage claimed falls within the terms of the policy. This is commonly called a prima facie claim. The complainant ’ s home and contents policy provides cover for loss or damage caused by a series of defined events including storm, rainwater or runoff, provided the runoff is not combined with flood waters. Cover under the insured event of storm excludes cover for flood unless the additional optional cover for flood is taken out. Flood is defined in the policy as: The covering of normally dry land by water that has escaped or been released from the normal confines of any of the following:  a lake (whether or not it has been altered or modified);  a river (whether or not it has been altered or modified);  a creek (whether or not it has been altered or modified);  another natural watercourse (whether or not it has been altered or modified);  a reservoir;  a canal; or  a dam. The complainant did not take out the optional cover for flood. As flood damage is therefore excluded from cover, the onus is on the complainant to establish all the damage claimed was due to stormwater runoff. Circumstances of the loss There is no dispute that significant heavy rainfall was recorded in the complainant’s area for almost two weeks prior to the inundation. The complainant lodged the claim on the 3 March 2022 after being evacuated from her home on 27 February 2022 due to the home being inundated by water. The complainant first observed water pooling in the backyard of the property at about 6.00am on 27 February 2022. By 1500 on 27 February 2022 water was at the second step into the property at which time the complainant was evacuated. At 1700 on 27 February 2022 the complainant returned to the property by paddle board and found the water had risen and was at the top step. The complainant returned to the house on 28 February 2022 to find the water had inundated the house and risen approximately 90mm above finished floor level. Immediate action was taken to mitigate further damage with carpet and rugs removed. There is no dispute that the initial inundation of the property was due to stormwater runoff. The Insurer’s hydrologist confirmed that the initial inundation occurred because the stormwater runoff from the local catchment area was unable to effectively discharge via the Determination | Case number: 886935 Page 3 of 6 local storm water drainage network. The inundation was assessed at a height of 300mm above ground. The insurer has subsequently settled the complainant for the building damage for $73,652.90 and loss of contents for the sum insured $37,494.78 including GST. The insurer also paid $33,600 in temporary accommodation for 19 April 2022 to 24 June 2022 plus contents storage of $3,916. The complainant has confirmed acceptance of these amounts in settlement of this aspect of the claim. In the complainant’s initial complainant to AFCA the complainant raised that she had not been paid for temporary accommodation from 27 February 2022 until 12 April 2022. The complainant’s representative has advised she is no longer seeking cover for this peri od. The issues that remain in dispute relate to the insurer ’ s liability for the damage caused by the inundation over 300mmm above ground level and the inconvenience caused by the insurer’s handling of the claim. Insurer says damage due to flood The insurer provided a report from its hydrologist (WT) dated 10 May 2022, which was prepared following a site inspection on 28 March 2022. A second version of this report was provided with amendments made. WT noted the property is approximately 300 metres to the east-southeast of BC. The ground level of the property is 1.85mAHD to 2.43mAHD with the floor level of the home 1.22m above the natural ground level or 3.59mAHD. AHD is the height measured above sea level. WT advises peak water level at the property was approximately 90mm above the finished floor level or 3.59mAHD, based on observed inundation marks at the site. WT considered:  Brisbane City Council’s (BCC) Flood Awareness Mapping show the Subject Property to be inundated by floodwater from BC during a 1 in 100 (1%) AEP event and by overland flow during a 1 in 50 (2%) AEP event.  Observed water levels rising on the Subject Property prior to their evacuation from the property at 1500 Sunday 27 February 2022. This is generally consistent with the recorded water levels in BC which reached a peak level of 4.53 mAHD at the BH gauge at approximately 2045 on Sunday 27 February 2022.  The initial inundation would have occurred because of stormwater runoff from the local catchment that was unable to effectively discharge via the local stormwater drainage network, due to elevated water levels in BC. This alone, would not have reached the observed depth of inundation of 90mm above the finished floor level.  The overland flow flood modelling completed by BCC estimates depths of up to 300mm at the front of the property during a 1 in 50 (2%) AEP event, which is consistent with the observed rainfall intensities.  The data indicates peak rainfall intensity occurred at 1300 to 1400 on 27 February 2022.  The maximum depth of inundation over the natural ground level of 1.3 metres at the property coincided with peak water level in BC and the Brisbane River. This resulted in water overflowing from BC into the north-western floodplain areas of Windsor and surrounding areas  the peak water level at the Bowen Hills Alert gauge was approximately 4.52mAHD at 8:45pm on Sunday 27 February 2022. Determination | Case number: 886935 Page 4 of 6 While WT concludes the inundation up to 90mm above floor level was caused by flood water overflowing from BC, WT does not say when it is likely the water commenced overflowing for BC to combine with the stormwater runoff and become flood water. Complainant says the damage was caused by storm water runoff The complainant, while not providing an alternative hydrology report says:  the water inundation was because of stormwater run-off and backflow flooding  WT’s report is inconclusive, contains several inaccuracies, contradictions and omissions  WT’s summary of the insured’s recollections is blatantly incorrect  WT used topography from 2014 despite significant earthworks in the area since then  the area is known to residents to have backflow flooding and be susceptible to storm water run-off  water inundated the property above finished floor level at approximately 5:30pm on 27 February 2022  the peak flood level recorded at BC wasn’t until approximately 9:00pm that day, nearly four hours after the inundation. Inundation above floor level most likely flood The panel accepts the hydrologist report was not the most comprehensive and the actual timing of the inundation hadn’t been provided . The failure to provide data to confirm the time the BC overflowed is not ideal and limits the value of the hydrology report in determining this matter. The panel accepts that inundation by stormwater runoff usually correlates with the maximum intensity period for rainfall. That likely occurred between 1300 and 1400 on 27 February 2022. The data suggests that the rainfall intensity reduced after that time. Any increase in the level of stormwater runoff after that time is likely to be limited, although there is nothing to say the stormwater runoff would not continue to rise as it could not effectively discharge. In assessing the likelihood of the inundation to 90mm above floor level the panel takes into consideration of the location of property, watercourses, rainfall timing, peak levels, time delay between peak and inundation, watercourse levels, ground levels and floor levels, and from that we reach a conclusion. In this instance, when those matters are considered alongside the hydrology, the panel is satisfied that the inundation above floor level was more likely than not caused by a combination of stormwater runoff and water that overflowed BC. Such inundation would be considered flood and excluded under the terms of the policy. The panel accepts the hydrology statement that stormwater alone could not have reached a level of 1.2m above ground level based on the rainfall analysis. The panel is satisfied the insurer is entitled to rely on the terms of the policy to deny liability for damage to the property for inundation over 300mm above ground level. 2.2 Is the complainant entitled to compensation for non- financial loss? Yes. The insurers handling of the claim has caused the complainant an unusual degree of physical inconvenience or loss of enjoyment or peace of mind. It is fair that the insurer pays compensation of $2,500. Determination | Case number: 886935 Page 5 of 6 Complainant entitled to an award of non-financial loss compensation Under its Rules, AFCA can award non-financial loss compensation of up to $5,400 in circumstances where actions or errors of the insurer has caused an unusual degree of physical inconvenience or time taken to resolve a situation. The panel accepts the complainant was misled by the insurer ’s error at a time when the complainant would have been under significant stress due to the flood damage to her home. On 13 May 2022 the insurer verbally accepted the claim for damage to 300mm above floor height. It confirmed this in writing on 20 May 2022. The complainant was entitled at that stage to believe her claim had been accepted in full. It took the insurer two weeks until the error was corrected and it confirmed its liability was limited to damage 300mm above ground level. The complainant says she has been prejudiced by the insurer misleading information although there is no evidence that she has incurred any further financial loss due to this error. Cleaning costs and other costs associated with remediation of the above floor area would have necessarily been incurred regardless of the insurer’s action. The panel notes it took three months from lodgement before the partial decline was issued. Further the complainant was not provided with any temporary accommodation relief immediately following the event, causing significant inconvenience. The insurer has otherwise, in settling the other aspects of the claim, acted fairly. It has cash settled the complainant for the sum insured for contents, cash settled for the damage to the lower section and cash settled for approximately eight weeks temporary accommodation. In the circumstances the panel considers the insurer ’ s offer to pay compensation of $2,500 for non-financial loss is fair. 2.3 Why is the outcome fair? There is no dispute the complainant had been provided with the relevant policy documents or that the complainant’s policy does not include flood cover. As the available information establishes that most likely the damage caused by inundation over 300mm above ground level was flood then it is fair for the insurer to rely on the terms of the policy to deny liability for that aspect of the claim. Determination | Case number: 886935 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive industry experience We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.