Home / Allianz Australia / Determination 886358

Determination 886358

Impact damage settlement amount disputed; insurer's cash settlement offer maintained

FirmAllianz Australia
Decided2023-02-22
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$12,533
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord claimed that a vehicle impact damaged his home and sought settlement based on three builder quotes. The insurer's cash settlement offer of $12,533.17, based on a structural engineer's scope, was found to correctly reflect the covered damage, and the panel required payment of that offer.

The structural engineer's report was the most detailed and persuasive evidence, and the complainant's additional damage was unrelated to the impact event.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionpay claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 886358 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 886358 Page 1 of 7 Case number: 886358 13 February 2023 1 Determination overview 1.1 Complaint The complainant holds a Landlords insurance policy with the financial firm (insurer) and lodged a claim for impact damage after a vehicle collided with the home on 8 August 2021. The insurer initially offered $27,715 to settle the claim. The complainant rejected the offer and obtained three quotes of his own for $114,821, $120,886.70 and $122,130.25. The insurer says the scope of works were not consistent with the claimed event and appointed (TB) to assess the extent of impact damage. TB appointed a structural engineer (PD) to investigate the damage. PD found the impact damage was limited to the brick veneer, timber column, the downpipe at the front left of the dwelling and approximately six floor tiles at the front patio. TB provided a quote for repairs for $9,082.01 based on PD’s scope of works (SOW) . The insurer offered an additional 15% due to increased work costs and a 20% uplift for contingencies to bring the final settlement offer to $12,533.17. The complainant rejected the offer and seeks settlement based on quotes provided by him. Issues and key findings Is the insurer required to increase its settlement offer? No. Based on the evidence provided by the parties, the insurer is entitled to maintain its offer to settle the claim for $12,533.17. The panel is not satisfied the quotes provided by the complainant are an accurate reflection of the impact damage sustained to the home. Why is the outcome fair? This outcome is fair because the insurer has settled the complainant has per its policy obligations. The insurer is not required to increase its settlement offer as on balance, the additional damage claimed is unrelated to the incident. 1.2 Determination This determination is in favour of the financial firm. The insurer is not required to increase its settlement offer to the complainant and is entitled to maintain its settlement offer of $12,533.17. Within 14 days of the complainant’s acceptance of this determination the insurer, if it has not already done so, is to pay the complainant $12,533.17 in settlement of the claim. Determination | Case number: 886358 Page 2 of 7 2 Reasons for determination The complainant is being represented by a family member. For the purposes of this determination both the representative and the complainant will be referred to as the complainant. 2.1 Is the insurer required to increase its settlement offer? Policy provides cover for impact damage The policy provides cover for loss or damage caused by ‘Impact’ as set out on page 24 of the Policy Disclosure Statement (PDS) this includes but is not limited to damage caused by impact by a motor vehicle. The policy defines impact damage as follows: Covered Loss or damage caused by a collision with your building and/or contents by:  Falling tree branches,  Any vehicle or load, except to the extent that the vehicle was in your control, […] The policy also provides the follow relevant exclusions under impact: Not covered […] Loss or damage that is predominantly caused by or arises from:  acts by you, or someone acting with your consent, which are intended to cause loss or damage to your property,  […]  Wear and tear or gradual deterioration Loss or damage to the extent that it is caused by or arises from:  defects in design, structure, materials, workmanship or construction at the insured site (or strata site if your home is under a strata title or similar plan) which you knew about or should reasonably have known about at the time of the loss or damage arising, or  failure to take reasonable steps to keep the insured property well maintained, structurally sound and secure (refer to Tips to keep your property in great shape on page 3 for examples of some of the steps you can take). Circumstances of claim There is no dispute that the complainant has a valid claim for impact damage after a vehicle ran off the road and collided with the house on 8 August 2021. The insurer’s builder (MK) assessed the damage on 13 August 2021. MK identified impact damage to the face brickwork on the northern and western elevations of the home, PVC stormwater pipe, a timber support post, ceramic tiles on the patio, a glazed aluminium window and some internal damage. MK provided a repair estimate for $27,715. The complainant rejected the offer and advised the insurer that there was damage to the following areas which were missed:  Exposed patches of concrete at the tiled patio floor;  Displacement and outward rotation of left-hand veneer wall at rear side of the property; Determination | Case number: 886358 Page 3 of 7  Internal damages to wall and ceiling linings. The complainant provided the following quotes to repair the home:  (BS) - $120,886.70 inc GST  (RG) - $122,130.25 inc GST  (BM) - $114,821 plus GST The insurer says the quotes do not match the scope of works consistent with impact damage. The insurer says the quotes include repair work for unrelated damage that falls outside the scope of cover. The panel agrees Structural Engineers report persuasive The insurer arranged a second builder TB to assess and quote on the repairs. TB organised PD, a structural engineer to attend the property on 31 March 2022. The report is summarised in section 3 of this determination. PD considered the impact damage was limited to the brick veneer with no signs of damage to the slab. PD noted significant and uneven subsidence to the pavement at the rear of the property, most likely caused by the reactive soil at the site. PD considered internal damage observed was most likely due to ongoing ground movement rather than impact. The panel notes the complainant has not provided any information to dispute these findings. The insurer says that a structural engineer is the most qualified person to comment on the cause and rectification of damage. The panel accepts the report from PD is most detailed and persuasive. The panel accepts that on balance, the additional damage claimed and quoted by the complainant’ s builders is unrelated to the claimed event. Insurer entitled to maintain cash settlement offer TB provided a quote for the repairs of $9,082.01 in-line with the scope of works outlined in the PD’s report. The insurer ’s Internal Building Consultant (IBC) assessed the reports, accompanying photographs and quotes. IBC recommended the insurer offer settlement of $12,010.96 considering likely increased construction costs and contingencies. The insurer has subsequently offered to cash settle the claim for $12,533.17 allowing a 15% increase in construction costs and a 20% uplift for contingencies. The complainant has not provided any information to show the additional damage is a result of the claimed event or that the insurer has incorrectly assessed its extent of liability. The panel is satisfied the insurer has correctly assessed its liability based on the findings of the structural engineer PD. In the circumstances the panel is satisfied the insurer is entitled to maintain its cash settlement offer of $12,533.17 and is not required to take any further action. 2.2 Why is the outcome fair? The outcome is fair in all the circumstances because the insurer has fulfilled its policy obligations to the complainant and provided adequate settlement for the claimed impact related damage as supported by its professional reports. Whilst the complainant provided quotes which were substantially higher to repair the home, the evidence does not support t he complainant’s requested settlement figure therefore, it would be unfair to the insurer to require it to increase its settlement offer. Determination | Case number: 886358 Page 4 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive general insurance experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 886358 Page 5 of 7 3.2 Relevant report extracts Record Key points Determination | Case number: 886358 Page 6 of 7 Financial firm’s expert (PD ) Structural Engineer’s Report 08 April 2022  Observations and Comments  During the inspection, the Insured explained that in October of 2021, a vehicle travelling along D Court left the road, crossed the front lawn of the property and struck the wall, timber patio column and downpipe at front left - hand corner of the dwelling (Refer Photos 1 and 2).  As a make safe, a single ac row prop and a temporary soft plastic downpipe had been installed at the damaged (removed) column location at the time of inspection (Refer Photo 1).  At the impacted area of the dwelling, damage appeared to be limited to the brick veneer and there were no visual indications, either externally or internally, that the slab, wall frame or roof frame had been compromised as a result of the event.  The damage to the brick veneer at the front of the dwelling ex tended along the left - hand veneer by way of a horizontal crack along the mortar joint atop approximately the fifth brick course (Refer Photo 3).  The pavement at the rear patio had undergone significant and uneven subsidence (Refer Photo 4) and the interio r floor was noticeably uneven underfoot.  The Insured claimed that the following issues at the property had also been caused by the impact event:  Exposed patches of concrete at the tiled patio floor adjacent (Refer Photos 1 and 2).  Displacement and out ward rotation of left - hand veneer wall at rear side of property (Refer Photo 5).  Internal damages to wall and ceiling linings (Refer Photo 6).  The tenant reported that several years ago, underpinning works were carried out at various locations, with particular emphasis on the left side of the dwelling. These works coincide with the exposed concrete at the patio and an apparent saw cut (Refer Photos 5 and 7) at the displaced veneer.  The natural ground of the site slopes moderat ely fro m right to left and it is expected that the left side of the dwelling has been constructed atop fill, whist the right side is founded on cut ground (Refer Photo 8). Di scussion and Recommendations Given the site location, the upper layers of the natural ground at the property are likely comprised predominantly of clay. This is supported by data from the CSIRO’s Australian Soil Resource Information System (ASRIS), which approximates the clay subsoil and topsoil content at the site to be bet ween 60 and 80% . Clay soils are considered reactive due to their tendency to swell and contract significantly in response to changes in moisture conditions. A common issue caused by this reactivity was observed at the rear patio, where the surface of the pavement had bec ome wavy due to uneven localised ground movements. These observations indicate that the soil at the site is highly reactive, and thus prone to significant moisture related expansions and contractions. On reactive sites, preventing water from making its wa y around foundations is of particular importance, as the accumulation of water can cause localised swelling and undesirable movement. It was noted during the inspection that no stormwater drains were present at the property, including at the rear left - hand side of the dwelling, where the surface grades of the property encourage water to flow and pond (Refer Photos 9 and 10). The prolonged and seasonally fluctuating wetting in is area is likely to have adversely affected the foundation in this area over the approximately 30 - year life of the dwelling. The evidence and report of prev ious underpinning work confirms an Determination | Case number: 886358 Page 7 of 7

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.