Home insurance claim for earthquake damage declined as earthquake not proximate cause

FirmSuncorp Group
Decided2023-01-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed home and contents damage she attributed to the 22 September 2021 Victorian earthquake, which the insurer declined. AFCA found the earthquake was not the proximate cause of the damage, so the denial stood, but ordered $500 non-financial loss for claims-handling delays.

Under an insured events policy, the insured must show on balance that the damage was proximately caused by earthquake; the engineers' evidence on cracking pattern, intensity and pre-existing cracks was unrefuted.

Issues

Subjects and remedies

pay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 885485 Financial firm AAI Limited Determination | Case number: 885485 Page 2 of 6 Case number: 885485 5 January 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). She lodged a claim for damage she says was due to the Victorian earthquake on 22 September 2021. The insurer declined the claim because it says the damage is not consistent with the earthquake. The complainant disputes this. 1.2 Issues and key findings Can the insurer deny the claim? Yes. This is because the available information does not show the proximate cause of the damage is earthquake. Should the insurer pay non-financial loss? Yes. There were some delays in the insurer’s control. This would have caused an unusual degree of inconvenience or interference. The insurer should pay $500 in non-financial loss for this. 1.3 Determination This determination is mostly in favour of the insurer. The insurer can deny the claim. The insurer should pay $500 in non-financial loss. Determination | Case number: 885485 Page 3 of 6 2 Reasons for determination 2.1 Can the insurer deny the claim? Complainant has initial onus to establish a valid claim The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid (or prima facie ) claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. Information must show the proximate cause of the damage is earthquake The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. Earthquake is an insured event. When an insurance policy uses the term ‘caused by’, this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Therefore, to establish a valid claim, the available information must show the cause of the damage claimed is earthquake. Insurer’s engineers say earthquake was not the proximate cause The insurer is relying upon reports from two engineers. Both concluded the proximate cause of the damage was not the earthquake. They considered the proximate cause was long term differential movement. In support of this, they noted the following factors:  the Modified Mercalli Intensity (MMI) was too low to cause the damage claimed  the cracking is generally from vertical movement, which is consistent with differential movement, rather than lateral movement which is normally expected from earthquakes  wall and ceiling cracks were observed to the extension near the building – this is likely due to poor workmanship as evidenced by building mortar widths being wider than building standards  paint in the cracks suggests these are pre-existing the earthquake The complainant disputes this. She says the engineers’ opinion are unsubs tantiated. She says:  they have not done any testing of the plumbing as recommended  the home was not damaged prior to the earthquake, which refutes the presumption it was improperly constructed in any way  there is no evidence the home was not built to standards at the time of construction  the insurer agreed to replace a broken glass as it accepted it was damaged by the earthquake. Insurer can deny the claim Two qualified experts have concluded the earthquake was not the proximate cause of the damage. Their reasoning is compelling. For instance, they have highlighted the nature of the Determination | Case number: 885485 Page 4 of 6 cracking is more consistent with differential settlement rather than lateral forces. Some of the cracking was pre-existing. One engineer highlighted a deficiency in the mortar which was demonstrated by the photos included and appeared inconsistent with building standards. That explanation is plausible. All of these factors are inconsistent with the position the earthquake is the proximate caus e. I also note their opinions are unrefuted by any other expert. Whilst the complainant says all of the cracking is new, there is no objective evidence to support this. For example, there are no pre-existing photos of the property. I also note at least one of the engineers has highlighted some of the cracking may be pre-existing. Even if I accept all the cracking was new, this does not mean the proximate cause was the earthquake. Instead, it is more likely a contributing cause with the proximate cause being other factors, such as long term differential movement due to pre-existing issues in the building. I note this is consistent with the opinion of at least one of the engineers. For the broken glass, I note the policy covers ‘Accidental breakage of glass’. There is no dispute this occurred. Therefore, the complainant had a valid claim for this aspect, hence why it was likely accepted by the insurer. This is distinguishable from the other damage claimed where the available information does not show it was proximately caused by any insured event. Therefore, after careful consideration of all the available information, I am not persuaded the proximate cause of the damage being claimed was the earthquake. On this basis, the insurer can deny the claim. 2.2 Should the insurer pay non-financial loss? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $500 in non-financial loss The complainant is dissatisfied with the insurer’s claims handling. She says there was not a timely, transparent or reasonable and fair process. The insurer provided a brief chronology of the claims handling. Having reviewed it, there appeared to be some delays. For instance, the initial builder’s report was received on 13 October 2021. The insurer says a decision was made to engage an engineer on 28 October 2021. It is not clear why it took almost two weeks to make this decision. Further, the insurer said it then engaged an engineer on 23 November 2021. This was about four weeks later. It is not clear why this took so long. I also acknowledge there was a delay in the engineer issuing the report as they did not do so until 28 January 2022. However, this period encompassed Christmas and New Year. This is the likely explanation behind this delay and outside the insurer’s control. Determination | Case number: 885485 Page 5 of 6 I also note the insurer engaged a second engineer in response to the comp lainant’s concerns. This was fair and reasonable in the circumstances. Overall, I consider the insurer’s claims handling was fair although there were some delays which appeared to have been in its control. I also accept these delays likely caused an unusual degree of inconvenience. However, I do not accept it would have been substantive. This is because the damage was not significant and the insurer has otherwise handled the claim reasonably. Given this, it is fair the insurer pays $500 in non-financial loss. Determination | Case number: 885485 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.