Text of the determination
Determination
Case number 885447
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 885447 Page 1 of 10
Case number: 885447 17 February 2023
1 Determination overview
1.1 Complaint
The complainant holds a farm insurance policy with the financial firm (the insurer). A claim
was lodged for loss and damage when the complainant’s home , was inundated with water
during the catastrophic weather events of February/March 2022.
The insurer accepted the damage to the wall of one of the bedrooms was caused by storm
water (entered through the ceiling) but says the inundation of the remainder of the home was
flood, which the policy excludes.
The complainant says the initial inundation to the home was storm water run-off and escape
of effluent (sewer water), therefore the insurer is liable for the entire claim.
In addition, the complainant also says the insurer’s claim process was unreasonably delayed
resulting in high levels of stress and inconvenience to him and further damage to the insured
property.
1.2 Issues and key findings
Should the insurer increase its settlement offer?
Yes. With the exception of the bedroom two wall and the ceilings in the kitchen and bedroom
four, the insurer is entitled to decline the remainder of the claim. This is because based on the
available material, the panel is satisfied the insurer established the application of the flood
exclusion.
Is the complainant entitled to compensation for the claim handling?
Yes. This is because the complainant suffered high levels of stress and inconvenience
because of the claim handling process.
Why is the outcome fair?
It would not be fair to require an insurer to pay a claim for damage which does not fall within
the scope of cover provided by the policy. The policy is clear and unambiguous, and it
excludes damage resulting from flood.
It is also fair the complainant receives compensation for non-financial loss, given his claim
experience in already difficult circumstances.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to deny the bulk of the complainant’s claim in a ccordance with the
provisions of this determination.
However, the insurer is required to increase its offer of repairs for bedroom two, in the amount
of $1,959.38, by 20%, to account for contingencies. The total amount is $2,351.26.
Determination | Case number: 885447 Page 2 of 10
In addition, the insurer is to obtain a scope of works and quotation for the removal of mould in
the kitchen and ceilings of bedroom four. The insurer is to cash settle the complainant based
upon this quotation, together with a 20% uplift for contingencies.
The insurer is required to pay $2,500 non-financial loss compensation to the complainant.
Determination | Case number: 885447 Page 3 of 10
2 Reasons for determination
2.1 Should the insurer increase its settlement offer?
Policy excludes flood damage
T he policy provides accidental cover for the complainant’s home and contents. However,
damage caused by flood is excluded, unless the optional flood cover offer is purchased.
The panel is satisfied that the complainant did not select the optional flood cover.
Flood is defined in the product disclosure statement as:
Flood
Means the covering of normally dry land by water that has escaped or been
released from the normal confines of any of the following:
(a) a lake (whether or not it has been altered or modified);
(b) a river (whether or not it has been altered or modified);
(c) a creek (whether or not it has been altered or modified);
(d) another natural watercourse (whether or not it has been altered or modified);
(e) a reservoir;
(f) a canal;
(g) a dam.
The insurer has partially accepted the claim but denies the balance of the claim, based upon
the policy exclusion for flood.
It is accepted insurance law that the insurer carries the onus to establish the application of its
policy exclusion for damage caused by flood.
The insurer is required to show that the remainder of the damage to the home, except for the
accepted bedroom damage, was caused by flood.
Circumstances surrounding the loss
It is not in dispute the home and a three-bay shed were inundated by water on 1 March 2022.
It is also not in dispute the area was impacted by a heavy rainfall event commencing days
prior to the inundation.
The weather event was severe, resulting in major flooding in New South Wales.
Determination | Case number: 885447 Page 4 of 10
The complainant provided the following relevant details surrounding the time of the
inundation:
the complainant’s partner S evacuated the home by road around 0230 hours, on the
morning of 1 March 2022
S says at the time of her evacuation, the road was covered in clear water
the complainant evacuated the home by boat
the complainant says sewer (effluent) entered the home at approximately 1600 hours, prior
to the river bursting its banks
the complainant also says rain water was running down the walls of the home during
heavy rain.
The complainant was unable to provide any material (i.e. time stamped photographs and/or
videos at the time of initial inundation) to show sewer water entered the home at the time
reported.
Parties disagree on cause of inundation
The complainant says the storm water and waste water (effluent) initially inundated the home,
followed by the flood water from the nearby river.
With the assistance of the complainant’s broker (D), the complainant provided detailed
information saying that during the night of the 28 February 2022, and/or the early hours of 1
March 2022, the property’ s sewage pipes backed up. The complainant indicated this occurred
due to the volume of ground water present and the local treatment facility turning off their
pumps.
In support, the complainant relies on the fact the home was rendered uninhabitable due to the
presence of raw sewage contamination.
The complainant also provided commentary on the findings of the insurer’s hydrologist WT.
Relevantly, amongst other things, the complainant says:
the report contains incorrect information
there is insufficient detail pertaining to the daily rainfall figures and the data from the
closest rainfall gauge at MV (8km) is omitted
there is no reference to the property being inundated with storm water through the roof and
the septic effluent
in contradiction to the report, the septic system relies on a float system and it is not
pressurised
varying date ranges are noted which skews the data that is being represented
only four out of 13 complainant provided photographs were used in the report
no swabs of the internal walls were taken to confirm the point of the initial sewage
contamination.
The insurer accepted the water marks on a bedroom wall resulted from the rainwater running
down the ceiling, as described by WT in its report.
However, the insurer maintains the waters inundating the property were flood waters coming
from the local river and spilling onto the land surrounding the site and inundating the dwelling
above floor level.
In support, the insurer relies on WT’s hydrologist report issued on 11 July following a site
assessment on 29 June 2022.
Determination | Case number: 885447 Page 5 of 10
Loss was caused by flood
The complainant’s home is a single level home constructed on a slab foundation with a metal
roof and brick siding. It is surrounded by farm land with a network of interconnected drains.
The home is located on a raised fill platform adjacent to the banks of the Richmond River,
one of the New South Wales’ largest coastal rivers.
The elevation of the fill platform is approximately 3.3m AHD (Australian Height Datum), while
the ground level of the surrounding area is 2.2m AHD.
WT says the data shows the insured property is within the flood extent of 2% Annual
Exceedance Probability (AEP) as per the Richmond River flood study model. WT says the
data indicates the flood was a 1 in 100 AEP events.
The panel considered the complainant’s submission with respect to the sewerage water and
storm water run-off entering the property prior to the flood waters from the Richmond River.
Strom water run-off typically occurs contemporaneously with the highest intensity of rainfall.
While the data contained in WT’s report indicates there was rain falling in the area between
28 February and 1 March 2022, the peak rainfall intensities (that being 51mm/hr) had
occurred several days earlier. Somewhere between 1700 to 1800 hours on 23 February
2022.
If there was any inundation by stormwater runoff, the panel is satisfied that it is likely it would
have occurred at this time or soon after. This includes the filling of the sewer pump station
(located at the ground level 2.2m AHD of the insured property) causing sewer back-up into
the home.
The panel also considered the information contained in WT’s report that s hows the second
rainfall peak of approximately 40mm/hr occurred around 0000 hours on 28 February 2022.
This corresponds with the information S reported when she says at the time of evacuation the
roads were covered in clear water. However, this does not assist the complainant as there is
no material to suggest this water inundated the home.
Further, the available data contained in the WT report relating to the Richmond River’s water
levels shows water levels peaked:
at approximately 6.36m AHD at 2230 hours on 1 March 2022 at the (WCS) gauge (58061-
1), located nearly 24 km upstream from the insured property
at approximately 2.19 m AHD at 0900 hours on 2 March 2022 at the (BBP) gauge
(558044-1) located approximately 10 km downstream.
In addition, the complainant also provided information to show the levels of the Richmond
River at the (WOO) gauge (58061) peaked at 7.17 metres around 0000 hours on 2 March
2022. The distance between this river gauge location and the property is unknown.
The panel has considered the parties submission carefully and considers based on the
available information the initial cause of inundation above ground level was due to flood.
This is because when the complainant evacuated at 0230 on 1 March 2022, the property had
not yet been inundated from the ground. After S evacuated there was minimal rainfall
recorded yet the WOO gauge located upstream from the complainant’s property continued to
rise before peaking at 6.36m AHD, some 20 hours after S evacuated.
This peak level is almost 3m AHD above the height of the subject property. When the above
is considered the panel is persuaded the initial cause of inundation from ground level was
Determination | Case number: 885447 Page 6 of 10
flood water, as after S evacuated there was no significant rainfall that would have caused
inundation from storm water runoff alone.
Rather, on balance, it is more likely that the river overtopped its banks and mixed with the
storm water, therefore becoming flood water which then ultimately inundated the property.
Based upon the onsite evidence from the complainant, it is reasonable to conclude that the
inundation of the property occurred some-time between 2230 hours 1 March 2022 and 0900
hours on 2 March 2022.
Insurer is entitled to deny the bulk of the ground up inundation
Bearing in mind the elevation of the dwelling is approximately 1 to 1.2m above the ground
level, the panel is satisfied that it is more likely that the building was inundated at a time when
the nearby watercourses were already in flood, which means the water that arrived at the
property would have been considered floodwaters.
The panel confirms that if floodwater is mixed with water from other sources (such as
stormwater run-off) then this is considered floodwater.
The panel also notes the peak rainfall had occurred days before the initial time of inundation.
The second peak rainfall, that was less intense, occurred in the early hours of 28 February
2022. This is also some time prior to the reported time of the home inundation.
As to the complainant’s argume nts, the panel is not satisfied the report’s date of issuance
and/or Richmond River referenced water peak level data, is incorrect.
This is because WT’s report shows date of issuance as 1 1 July not 8 June 2022 as
suggested by the complainant. In addition, WT refers to a different river gauge location data,
than the one suggested by the complaint (as detailed above). In addition, the references from
WT of the gauge heights are recorded in meters AHD and not meters as noted by the
complainant.
Further, the panel is satisfied the MV rainfall gauge does not contain rainfall data for February
2022, as per the record data supplied by the complainant.
The panel accepts WT’s report lacks some detail, such as the modelled water level at the site
for a 1 in 50 AEP events. While this is not ideal, this is not sufficient to deem the report as
inaccurate and/or misleading.
As a result, the panel is satisfied the insurer is entitled to rely on the content of WT’s report
and decline the remainder of the complainant’s cl aim.
Bedrooms two and four and the kitchen
The insurer has accepted the claim for damage to bedroom two and offered $1,959.38. It is
the panel’s view that the offer itself is fair and reasonable but should be increased by 20% to
allow for any contingencies, given it is the complainant who will to need to complete the
repairs.
The insurer has denied the claims for the mould in the kitchen and bedroom four ceilings and
says that the mould is the result of maintenance issues, which are excluded from coverage
under the policy.
The insurer relies upon a report that says the mould has been caused by condensation from
the air conditioner and a ridge over bedroom four.
Determination | Case number: 885447 Page 7 of 10
The complainant says that the air conditioner was not in use at that time.
Further, the panel accepts that this was a significant weather event, with intense rainfall and
despite the insurer’s insistence that there were maintenance issues, it does not accept that
maintenance issues, if any, were the cause of the mould.
The insurer is to obtain a scope of works and quotation for the removal of mould in the
kitchen and ceilings of bedroom four. The insurer is to cash settle the complainant based
upon this quotation, together with a 20% uplift for contingencies.
2.2 Is the complainant entitled to compensation for the claim
handling?
Compensation may be awarded in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss (capped at $5,400)
where there has been an unusual amount of physical inconvenience, time taken to resolve
the situation or interference with a complainant’s expectation of enjoyment or pe ace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim.
The complainant is entitled to compensation for non-financial loss
The complainant provided information showing the claim was lodged on 4 March 2022,
however, a claim number and manager was not assigned until 8 April 2022.
The panel accepts the insurer failed to appropriately manage this aspect of the complainant’s
claim. The panel also accepts this would have made the situation more difficult for the
complainant, resulting in high levels of stress and inconvenience caused by the insurer’s lack
of action.
The panel accepts the progression of the claim and delays in arranging for assessments were
outside of its control due to the catastrophic nature of the weather event. However, the panel
considers this should not have precluded the insurer from lodging the claim in a timely
manner and actively updating the complainant on the status of the claim.
Therefore, the panel is satisfied it is appropriate that the insurer pays the complainant $2,500
compensation for non-financial loss.
Complainant obtained government grant
Amongst other things, the complainant’s submission to this service includes information
indicati ng the insurer’s clam proce ss prevented the complainant from applying for numerous
Government grants.
The complainant reported he obtained a Back to home government grant In September 2022
and has been unable to use the funds until a final claim decision is made by the insurer.
On the exchanged material the panel is satisfied the insurer’s claim decisions was made on 8
August 2022. As a result, whilst the panel accepts waiting for a claim decision was stressful,
the panel is not satisfied the complainant was unable to obtain and or use the Government
grant as he was informed of the decision prior to receiving the payment.
Determination | Case number: 885447 Page 8 of 10
Insurer offered emergency make safe
The complainant says the insurer failed to complete a make safe of the property.
A review of the exchange material shows on 8 April 2022, by a way of email, the insurer
provided the complainant with a phone number to call if make safe was required. In the
absence of material showing make safe was requested, the panel is not satisfied the insurer
breached its duty to the complainant.
This is particularly so as the available information indicates an emergency make safe of the
home was carried out by the fire department.
2.3 Why is the outcome fair?
It would not be fair to require an insurer to pay a claim for damage which does not fall within
the scope of cover provided by the policy. The policy is clear and unambiguous, and it
excludes damage resulting from flood.
On the other hand, damage to bedrooms two and four and the kitchen is covered under the
policy.
It is also fair the complainant receives compensation for non-financial loss, given his claim
experience in already difficult circumstances.
Determination | Case number: 885447 Page 9 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 885447 Page 10 of 10
3.2 Relevant policy provisions
PDS page Provi sion
7 Flood
Means the covering of normally dry land by water that
has escaped or been released from the normal confines
of any of the following:
(a) a lake (whether or not it has been altered or modified);
(b) a river (whether or not it has been altered or modified);
(c) a creek (whether or not it has been altered or modified);
(d) another natural watercourse (whether or not it has been altered
or modified);
(e) a reservoir;
(f) a canal;
(g) a dam.