Home / Suncorp Group / Determination 884834

Determination 884834

Insurer denied most of the movement damage claim as excluded ground movement; complainants said it was caused by escape of liquid from a burst stormwater pipe

FirmSuncorp Group
Decided2023-06-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer denied most of the complainants' home movement damage claim as excluded ground movement. AFCA found the damage was more likely caused by escape of liquid from a broken stormwater pipe. It required the insurer to cover the damage, reimburse completed repairs, plumber and engineer fees (up to $5,000), and pay interest.

The complainants showed a claimable escape of liquid loss, so the insurer bore the onus of proving the ground movement exclusion applied and did not discharge it.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 884834 Financial firm AAI Limited Determination | Case number: 884834 Page 1 of 7 Case number: 884834 7 June 2023 1 Determination overview 1.1 Complaint The complainants hold home and contents insurance issued by the financial firm (insurer). In July 2018, the complainants lodged a claim for movement damage which they attributed to an earthquake. The insurer denied the claim on the basis that the damage was due to unrelated ground movement so excluded from cover under the policy terms. In March 2021, the complainants lodged a new claim for the damage after a burst stormwater pipe was identified. The insurer agreed to cover some cracking damage. However, it declined to cover most of the damage, maintaining it was due to excluded ground movement. The complainants consider that the entire claim should be covered as the movement damage was caused by escape of liquid (EOL) from the burst stormwater pipe. 1.2 Issues and key findings Is the insurer entitled to deny the disputed damage claim? No. Except for the driveway, driveway wall and eastern side path damage, the complainants have shown a claimable EOL loss and the insurer has not established an exclusion applies. Further, it is more likely than not that the EOL has been occurring since at least July 2018. Are the complainants entitled to costs reimbursement? Yes. The insurer is to reimburse costs the complainants paid to plumber RP to locate the source of the EOL, as covered exploratory costs. DG, the complainants’ engineer, assisted them in establishing a covered claim. The insurer is to reimburse up to $5,000 of DG’s fees . Why is the outcome fair? The complainants have shown a claimable loss and the insurer has not established the EOL damage is excluded, so it is fair that the insurer covers that damage. As DG assisted the complainants in proving a covered claim, it is fair that the insurer reimburses DG’s fees . 1.3 Determination This determination is in favour of the complainants. If the complainants accept this determination, the insurer is required to:  cover the EOL damage. If the insurer elects to pay a cash settlement for outstanding repairs, it must do so based on a reasonable quote for repairs, actionable by a retail customer and which reflects current prices, and include a 15% contingencies uplift  within 14 days of receiving proof of payment, reimburse the cost of completed repairs and RP’s fees , and pay interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth) on each amount from 28 days after the invoice was paid until the reimbursement  within 14 days of receiving proof of payment, reimburse DG’s fees up to a maximum amount of $5,000. Determination | Case number: 884834 Page 2 of 7 2 Reasons for determination The parties provided numerous submissions to AFCA. While this determination does not refer to them all, I have taken each submission into account in reaching my decision. 2.1 Is the insurer entitled to deny the disputed damage claim? No. Except for the driveway, driveway wall and eastern side path damage, the complainants have shown a claimable EOL loss and the insurer has not established an exclusion applies. Further, it is more likely than not that the EOL has been occurring since at least July 2018. Complainants have shown a claimable loss under the policy The complainants are required to show, on the balance of probabilities (that it is more likely than not), that they suffered a claimable loss under the policy. This means they must show the loss was caused by a risk for which they are insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the complainants’ policy covers damage to the insured property caused by a listed insured event. Those events include ‘Earthquake and tsunami’ and ‘Escape of liquid’. On 9 July 2018, the complainants lodged a claim for movement damage to their home, following an earthquake. The insurer determined the damage had occurred due to localised subsidence of the building’s footings, rather than th e earthquake. The claim was denied. On 11 March 2021, the complainants informed the insurer that they had identified a leaking stormwater pipe and believed it was causing the movement damage. The insurer agreed to cover some minor cracking to brickwork and offered a cash settlement. Accordingly, the insurer accepts that the complainants have shown a claimable EOL loss. However, the insurer maintains the majority of the damage to the home is due to excluded ground movement and differential settlement. Once the complainants prove the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says the disputed damage claim is excluded Following lodgement of the earthquake claim, the insurer appointed builder KB. KB inspected the insured property on 19 July 2018. The complainants advised KB that after earthquakes in the area earlier in the year, they had noticed cracking in their home and garage. KB confirmed the presence of internal cracking (particularly affecting the kitchen, the adjoining hallway and garage) and external brickwork cracking. Due to a concern that EOL could be causing the cracking, KB arranged for a plumber to inspect the propert y’s pipework. T he plumber, CP, identified that a stormwater pipe on the western side of the home had an obstruction of mud. However, CP reported that it ‘ placed garden hose on roof over down pipe. Water runs freely out to road ’ . The insurer engaged engineer SE to comment on causation. On 21 September 2018, SE reported that the damage was not earthquake related but was a direct result of differential ground and footing movement. SE’s floor level survey showed Determination | Case number: 884834 Page 3 of 7 subsidence to the south-west (where the master bedroom and garage were located). SE said the movement was consistent with abnormal soil moisture conditions created by the drying effect of tree roots over time. On 2 October 2018, the insurer wrote to the complainants advising the earthquake claim was denied. The insurer relied on a general exclusion clause set out on page 76 of the PDS, under which the policy does not cover damage caused by, arising from or involving: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under [certain insured events that are not relevant] After the complainants reported the leaking stormwater pipe in March 2021, the insurer appointed builder RC. The complainants told RC they had repaired the previous movement damage, but cracks had reappeared. RC confirmed the presence of internal and external cracking damage, which it believed was consistent with the reported broken pipe. RC subsequently performed leak detection testing and confirmed the stormwater pipe on the western side of the home was broken. The insurer then engaged engineer DK to provide a causation report. DK inspected the property on 28 April 2021 and reported that:  the ensuite bathroom cracking is related to general building movement associated with environmental effects (such as temperature changes and wind loads on the roof frame)  the garage ceiling cracking was present in 2018, when the downpipe was understood to not be leaking. Consequently, the cracking is unlikely to be related to the recently located leak, but is likely due to inadequate plasterboard jointing preparation/detailing  the external garage wall cracking was also present in 2018, so the cracking is unlikely to be related to the recently located leak. It is likely due to localised differential foundation movement/settlement from seasonal soil moisture changes and lack of movement joints  the cracking to the laundry and master bedroom western external wall is relatively recent and may be attributed to foundation movement caused by the stormwater pipe leak  the driveway slab and eastern pavement cracking is consistent with drying shrinkage, and is unlikely related to the leak  settlement of the eastern low brick wall adjacent to the driveway is likely due to ongoing surface water runoff, potentially leading to localised saturation of the slab panel subgrade. On 20 October 2021, DK reinspected the property as the complainants said its prior slab inspection had been inadequate. DK confirmed its previous findings, noting there had been no changes to the cracking damage. DK said that the western stencilled concrete pavement had settled but this was due to poor subgrade preparation or ongoing subgrade compaction. In late November 2021, the insurer offered the complainants $4,862.55 to cash settle the laundry and master bedroom external wall cracking damage DK had said was due to the stormwater pipe leak. The offer reflected the cost of repairs quoted by RC on 13 May 2021. The insurer says it is entitled to deny the rest of the damage claimed as the ground movement general exclusion applies. It says this is shown not only by its expert engineering reports, but also the report dated 25 May 2022 by the complainant’s engineer, DG. Determination | Case number: 884834 Page 4 of 7 Complainants say the disputed damage claim should be covered The complainants rely on a report dated 14 March 2021 by RP, plumber. RP had undertaken a CCTV inspection on 10 March 2021, and found:  a failed joint in a stormwater pipe running along the west side of the house from a pit in the concrete path. The joint was damaged and did not contain water  on testing, water disappeared and could not be seen moving past the joint  under the nature strip, the stormwater pipe was blocked by rocks and soil which had cracked the pipe  there was also significant tree root intrusion between the cracked pipe and the dwelling. In its causation report dated 25 May 2022, DG concluded that the most likely cause of the brickwork cracking was foundation movement due to settlement and, to a much lesser extent, reactive soil movement. The settlement was probably due to:  the proximity of the house footing to the sewer service trench. Unless the footing had been piered, it was likely in the zone of influence of the sewer pipe and associated trench. This could lead to unexpected loading of the pipe and settlement of the footing  possible foundation saturation via the sewer service trench leading to footing settlement  possible locally soft foundation conditions leading to differential settlement of the footing. DG considered it unlikely that the complainants would have been aware of the issues until the cracking appeared. DG noted it understood that CCTV inspection had confirmed that there were no stormwater or sewer pipe leaks. DG provided a further report on 22 August 2022. DG said that a floor level survey included in a recent underpinning quotation from MM, engineers, showed floor levels fell generally towards the west, with the worst settlement near the master bedroom ensuite bathroom. DG said this was consistent with the findings set out in its report dated 25 May 2022. On 17 September 2022, DG provided a further report after receiving a copy of RP’s report dated 14 March 2021. DG said RP’s report corrected its previous understanding that CCTV investigations had found no leaks in the pipes near the brickwork cracking. DG also said: The floor levels found in the [MM] survey are consistent with foundation settlement. The cracking in the brickwork is consistent with foundation settlement. The plumber’s report removes any doubt tha t the cause of the movement was foundation settlement as a result of a water leak from the blocked and broken pipe. The complainants say that they are therefore entitled to be covered for all damage claimed pursuant to the EOL insured event. They also submit that the EOL was more likely than not the cause of the movement damage observed after the earthquake in 2018. They note their home was constructed in 1989 and did not show signs of movement damage until 2018. Insurer is not entitled to deny the disputed damage claim DK and DG say that the insured property has sustained damage from EOL. The insurer accepted that was so and offered to cash settle the cost to repair the damage it says had been caused by the EOL. It is clear the complainants have established a claimable loss. This means the insurer bears the onus of establishing on the balance of probabilities that an exclusion or other limiting provision applies, if it is to be able deny cover for the disputed damage. Determination | Case number: 884834 Page 5 of 7 I am not satisfied the insurer has shown the disputed damage is excluded. Further, it is more likely than not that the EOL has been occurring since at least 2018. This because:  RP confirmed on 10 March 2021 through CCTV inspection and investigations that the stormwater pipe on the western side of the house was broken and leaking  upon being advised of the presence of the stormwater pipe, DG unequivocally concluded that the foundation settlement was caused by the EOL  DK’s conclu sions about the denied western side damage rely heavily on an assumption there were no leaks in 2018. However, CP did not complete a full CCTV inspection and observing water flow out of the pipe does not rule out the presence of a leak  DK acknowledges that some of the claimed damage ‘ may be attributed to minor foundation movement associated with the recent stormwater pipe leak directly adjacent’  the settlement and related damage is concentrated in the south western corner of the house, which is where the leaking stormwater pipe was located  in 2021, the damage reoccurred in the same areas after the complainants rectified the 2018 damage. This tends to suggest an ongoing problem from a particular cause  as at 2018, the insurer was sufficiently concerned that EOL may be the cause of the damage said to have been from the earthquake that it commissioned CP to investigate. As noted above, CP’s findings were not definitive  the complainants would not have been reasonably aware of the EOL until the broken pipe was identified. If the complainants accept this determination, the insurer is to cover the EOL claim, including the disputed damage, in accordance with the policy terms. That is, the insurer is to cover all damage claimed except for the damage to the driveway, eastern driveway wall and eastern side path (uncovered damage). I am satisfied that the uncovered damage is not claim related as DK said it was not and explained why that was so, and DG did not comment on it. The insurer may elect whether to attend to repairs or pay the complainants the cost of repairs. If the insurer elects to pay a cash settlement for the outstanding repairs, it must:  do so based on a reasonable quote for repairs, actionable by a retail customer and which reflects current prices, and  taking into account the quote will reflect current pricing but allowing for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs, pay a 15% uplift on the quoted amount. For the sake of completeness, I confirm RC’s quote dated 13 May 2021 may not be relied on to cash settle the claim. It does not cover all EOL damage, does not reflect current prices and is unlikely to be actionable by a retail custome r given it is described as a ‘liability quote’. The insurer is also required to reimburse the complainants for the repairs they had completed after the 2018 earthquake claim was denied (except to the extent the repairs related to the uncovered damage), upon receiving proof of payment. It is to pay interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth) (the Act) on each invoice from 28 days after the invoice was paid until the date of reimbursement. 2.2 Are the complainants entitled to costs reimbursement? Yes. The insurer is to reimburse costs the complainants paid RP to locate the source of the EOL, as covered exploratory costs. DG assisted them in establishing a covered claim. The insurer is to reimburse up to $5,000 of DG’s fees. Determination | Case number: 884834 Page 6 of 7 Exploratory costs are payable The EOL insured event includes cover for exploratory costs, meaning the insurer will pay ‘ the reasonable cost of locating, at the insured address, the source of the escaped liquid ’ . Accordingly, on provision of proof of payment, the insurer is to reimburse the complainants the costs they paid RP to locate the stormwater pipe leaks. It is also to pay interest under section 57 of the Act from 28 days after the invoice was paid until the date of reimbursement. AFCA may require insurer to contribute to a complainant’s professional costs The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a tot al of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Insurer is to reimburse fees proven to have been paid to DG I am satisfied that DG’s involvement has assisted the complainants in proving an entitlement to cover. In the circumstances, I am satisfied it is reasonable for the insurer to reimburse the complainants the fees they paid DG for its reports. Within 14 days of receiving proof of payment from the complainants, the insurer is to reimburse to them the fees DG charged, up to a $5,000 maximum limit. 2.3 Why is the outcome fair? The complainants have shown a claimable loss and the insurer has not established the EOL damage is excluded, so it is fair that the insurer covers that damage. As DG assisted the complainants in proving a covered claim, it is fair that the insurer reimbur ses DG’s fees . Determination | Case number: 884834 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.