Home / Terri Scheer Insurance Pty Ltd / Determination 884005

Determination 884005

Insurer declined several disputed items of a flood claim (driveway, re-wiring, shower combinations, flashing, external painting)

FirmTerri Scheer Insurance Pty Ltd
Decided2023-04-27
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$8,420
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord policyholder disputed the insurer's refusal to cover several items of a flood claim. AFCA found the insurer liable for shower combinations and flashing ($8,420.30 plus interest) but not the driveway, re-wiring or external painting.

The complainant must show the damage falls within policy cover; the driveway was excluded and re-wiring and painting were unsupported, while shower combinations and flashing were necessary repairs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Terri Scheer Insurance Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 884005 Financial firm Terri Scheer Insurance Pty Ltd Determination | Case number: 884005 Page 2 of 6 Case number: 884005 19 April 2023 1 Determination overview 1.1 Complaint The complainant held a landlord policy with the financial firm (insurer) for an investment property with four units. The complainant lodged a claim after the units were flood damaged. The insurer accepted liability for most items. A dispute arose about various items, some of which were subsequently resolved. However, the parties currently dispute the driveway, re- wiring of the property, shower combinations, flashing and painting of the external walls (‘disputed items’). The complainant says the insurer should cover the disputed items. The insurer disagrees. 1.2 Issues and key findings Should the insurer cover the disputed items? The insurer is liable for the shower combinations and flashing. The insurer is not liable for the other disputed items. 1.3 Determination This determination is partially in favour of the complainant. The insurer should settle the claim in the manner set out in section 2.1. Determination | Case number: 884005 Page 3 of 6 2 Reasons for determination 2.1 Should the insurer cover the disputed items? Complainant has initial onus to establish a valid claim The onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. The policy is an ‘insured events’ policy. This means not all los s and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. Flood is an insured event. In this regard, I note the following. Driveway The complainant says this was affected by the flood. He has provided an email in support from MS which says a couple of sections of the driveway had risen, likely due to ground swelling from the floods. Even if I accept the driveway was affected by the flood in the way, the policy contains this specific exclusion within the flood cover: We do not cover: … Loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage caused by a landslide or subsidence that is proved to have occurred within 72 hours of, and directly because of, flood and not because of erosion over time, structural fault or design fault; There is no information to show the damage occurred within 72 hours. For instance, damage to the driveway was not reported contemporaneously to the event. On this basis alone, the driveway is not covered. Further, and in the alternative, MS’s email does not consider other possible causes. For example, long term movement or construction techniques. Given this, I am not persuaded by MS’s email alone that the flood was the cause of the driveway damage. Re-wiring of the property The complainant says the re- wiring was necessary because the insurer’s contractors fail ed to support the wiring when replacing the ceiling. He refers to a verbal conversation with an expert who supported this. He also noted his builders said they could not use the existing wiring. The insurer provided a report from 2E. 2E did a desktop review and was not satisfied the w iring was damaged by either the event or the insurer’s contractors. 2E did not accept the wiring needed to be replaced as part of the other accepted work. Based on the exchanged information, there is insufficient basis to accept the complainant’s position. No information has been provided by the complainant’s contractor to confirm why they could not use the existing wiring. It is difficult to place weight on a verbal conversation the complainant had with an expert without that expert setting out their reasons in writing. The Determination | Case number: 884005 Page 4 of 6 insurer provided an expert report that does not support the complainant’s position. The photos provided do not show it was necessary to replace the wiring. Given this, I am not persuaded the insurer is liable for the re-wiring of the property. Shower combinations The complainant says each bathroom in the units were stripped out. Once this occurred, he says the shower combinations also should have been replaced. The insurer relied on loss adjuster S’s opinion. S said the shower combinations did not require replacement as they were not affected by the flood. S also referred to a conversation with the complainant’s contractor (MS). MS allegedly said the combinations were replaced because of their age and are ‘nearly at the point of fail’. The insurer provided a plumber report from SB. SB said the following about the bathroom:  if any of the shower combinations were found to be old with any brass pipe, replacement was necessary  if the combinations were full copper but original from 1970, replacement was prudent and would be considered good workmanship  if any internal timber stud walls were replaced, then the shower combination replacement cannot be faulted It is not cle ar from the insurer’s submissions if any of these factors were present. The insurer is relying upon a conversation between S and MS. However, nothing was received from MS directly to confirm why they replaced the shower combinations. It is not clear if there was a misunderstanding about the reasons MS provided in replacing the shower combinations. For instance, MS’s reference to their age may have been due to the above factors. The available information shows the complainant incurred the costs to replace the shower combinations. He has also said they were working up to the point of the flood. There is nothing to dispute this. SB provided several reasons as to why their replacement may be necessary when stripping out the bathroom, none of which has been investigated and could have been applicable. On balance, I accept the shower combinations required replacement as part of the repairs necessary to fix the claim related damage. The available information does not show they were failing or were simply replaced as an opportunity to upgrade them. Therefore, the insurer is liable for this. Flashing As part of the bathroom works, the plumbing had to be re-routed. This was done externally. The complainant says flashing to this external plumbing should be included to cover the hot water lines for safety reasons. The complainant also referred to the insurer’s expert, P, who said: Also the job that was carried out on re running these pipes has caused a fair bit of damage to the outside paint work. The pipes them self are quite intrusive and stand of the wall quite a lot. This making it not a neat and tidy job. The insurer initially disputed the re-routing of the plumbing lines. However, this was subsequently accepted and paid. The insurer has not articulated why it should not pay for the Determination | Case number: 884005 Page 5 of 6 flashing recommended by P or to rectify the damage caused by the re-routing and to ensure the area is neat and tidy. I consider it fair that this be paid. P recommended good practice would be to include flashing to ensure the work is tidy and neat. I do not accept such works would be considered an upgrade. This is instead good workmanship. Also, if such works were not done, it is likely to negatively affect the property’s aesthetic value compared to its pre-existing state. Painting of external walls (other than carport) The complainant refers to a builder saying that given the walls sat in black water for over a week, they should be repainted. This builder also noted other properties having this done. The insurer’s experts disagreed. They s aid pressure washing would be sufficient, particularly given the external material is concrete blocks. The photos do not show painting is required due to the floodwater. The insurer’s experts provided a compelling reason as to why the flood was unlikely t o have affected the paintwork. Therefore, beyond the carport, the insurer is not liable for this. Claim to be settled in this way The insurer is liable for:  the shower combinations, and  flashing for the re-routed plumbing. The insurer is not liable for the re-wiring, paintwork or driveway. The complainant has proved invoices for the shower combinations ($5,140.30) and a quote for the flashing ($3,280). Given all this, it is fair for the insurer to pay the complainant $8,420.30 for the shower combinations and flashing. The insurer should also pay interest on the both amounts pursuant to section 57 of the Insurance Contracts Act 1984. For the amount of $5,140.30, interest is payable from the time the complainant incurred this cost until payment is made. For the flashing, interest is payable from 20 June 2020, being one month after the quote was issued, until payment is made. Determination | Case number: 884005 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.