Home / Suncorp Group / Determination 883621
Determination 883621
Earthquake damage claim declined by insurer
Summary
The complainant claimed under home and contents insurance for earthquake-related cracking damage to his property after the insurer's assessor recommended an engineer's causation report. The engineer attributed the damage to long-term differential foundation movement, and AFCA found the insurer entitled to deny the claim.
The complainant bears the onus of establishing that earthquake damage occurred, and the insurer's engineering evidence, together with the general exclusion for ground movement, was not displaced.
Issues
- Claim denial primary · not upheld
“I am satisfied that the insurer is entitled to deny the claim.”
- Inadequate claim investigation secondary · not upheld
“The insurer has provided sufficient information to show that, on balance, the earthquake did not cause the damage and further that the engineer's report has strongly confirmed this.”
Subjects and remedies
no remedy
Text of the determination
Determination
Case number 883621
Financial firm AAI Limited
Determination | Case number: 883621 Page 1 of 6
Case number: 883621 30 January 2023
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm (insurer).
In October 2021 he lodged a claim, following an earthquake. The insurer assessed the claim
and following the assessor’s statement that the damage may have been caused by an
earthquake, appointed an engineer to determine the matter. The engineer rejected the claim
on the basis that the damage was a result of differential settlement of the foundations of the
building.
This matter has been the subject of a preliminary assessment which is in favour of the
insurer. The complainant rejects this, and the matter has been referred for determination.
1.2 Issues and key findings
Why the insurer entitled to deny the claim?
On the information provided to me, on balance, I am satisfied as follows:
the assessor (PB) accepted there was possible earthquake damage, but an engineer
should be appointed
the insurer’s engineer (M) found that the damage was because of differential settlement of
the foundations of the building and not earthquake
the complainant holds an insured events policy including earthquake
nothing has been provided which disputes the engineer’s finding.
On the information provided I am satisfied that the insurer is entitled to deny the claim.
It is noted that damage to a ceiling in the wardrobe was reviewed under a separate claim with
the insurer agreeing to cover the costs of repairing for the damage. This claim has not been
dealt with in this determination.
Why is the outcome fair?
The complainant has been given the opportunity to address all matters raised by the insurer.
Whilst I accept that PB did consider the possibility of the damage being related to the
earthquake he also recommended that an engineer be appointed to provide a causation
report.
Whilst the complainant may have considered that this indicated the damage was earthquake
related, the engineering report rejects this.
The insurer has accepted other damage not the subject of this claim. In the circumstances it
would be unfair to require the insurer to compensate the complainant.
1.3 Determination
This determination is in favour of the insurer. The insurer is not required to undertake any
further action.
Determination | Case number: 883621 Page 2 of 6
2 Reasons for determination
The complainant holds home and contents insurance with the insurer. Following an
earthquake, a claim was lodged in October 2021 in relation to cracks at the property. The
insurer assessed the property which indicated that the damage observed was consistent as a
result of the earthquake , however, recommended that an engineer’s opinion should be
obtained. The engineer did not support the claim on the base of an earthquake. The insurer
rejected the claim.
2.1 Was the insurer entitled to deny the claim?
Onus on complainant
The complainant must establish, on balance of probabilities, that he suffered a loss caused by
an event to which the policy responds this is as known as a prima facie or valid claim. The
complainant’s policy provides cover for loss or damage caused by listed events. Included in
listed events are earthquake.
If the complainant can establish a valid claim the responsibility is then on the insurer to show
that an exclusion applies.
It is therefore up to the complainant to establish in the first instance that earthquake damage
occurred to the property.
Product Disclosure Statement (PDS)
The insurer has referred to the PDS as follows:
…..
Determination | Case number: 883621 Page 3 of 6
Expert Reports
The insurer initially obtained a report from an assessor (PB).
PB recommended:
‘ An engineer be appointed to provide Causation Report on possible earthquake
damage to the insured’s property, and a repair SOW should resultant damage be
identified.’
SOW is an abbreviation for Scope of Works.
PB obtained the information by a site visit on November 4, 2021.
The insurer appointed an engineer (M). M attended the property on 11 February 2022 and
provided a report with large number of attached photographs of damage. M dealt with the
issues in relation to the earthquake and stated:
‘Had 22 September 2021 earthquake event caused or contributed to the cracking
damage to the house, we would have expected to observe more wide spread
damage to the walls on the building throughout, and not predominantly confined
to the few locations observed during the inspection.’
M referred to Geosciences Australia website and in particular to the shaking intensity map. M
stated that the earthquake event was light in the area that the complainant lived. And stated:
‘Li ght ground vibrations from an earthquake would not, in our opinion, cause the
damage to the building, as observed during our site inspection.’
M then dealt with the issue of differential foundation soil movements. M noted that part of the
cracking damage due to vibrations from earthquake most commonly present as clean and
sharp and are of a jagged appearance. He noted that the internal cracking observed which
were generally occurring in straight lines indicated the cracks extend along common crack
propagation routes.
Determination | Case number: 883621 Page 4 of 6
He also noted that multiple cracks observed to the cornices presented signs of previous
repairs which he said further indicated that long term and ongoing movement-related cracking
has occurred to the building. He also noted that there was no indicated movement to the roof
tiles above the area in the walk-in robe which had sustained ceiling.
M came to the conclusion:
‘In our opinion, the damage observed to the building has not been caused or
contributed to by the earthquake event on 22 September 2021, or any other single
definable event.
It is M opinion that the approximate cause of the cracking and movement – related
damage to the building is due to the combination of long-term and ongoing
differential foundation movements due to underlying reactive soils and long-term
thermal building movements. ’
Insurer entitled to deny claim
The complainant says that the assessment report confirmed the damage was consistent with
a new earthquake and that ground movements is what happens with earthquakes.
Whilst I accept the complainant may have been confused by the initial statement by the PB, I
am satisfied by reading the report that PB provided an initial assessment but, as stated in the
report this was subject to a final determination being undertaken by an engineer to determine
the causation.
The report by M dismisses the causation being the earthquake and instead refers to long-
term and ongoing differential foundation movement.
Whilst the policy provides coverage for earthquake I am not satisfied that the complainant has
established that the earthquake caused the damage and I have taken into account both
reports provided by the insurer in making this assessment.
The PDS provides cover for damage to the building caused by landslides or substance
proved occurred in 72 hours.
However, the general exclusions under the policy exclude ground movement including
shrinkage or other ground movements.
On the information provided, on balance, I am not satisfied that the complainant has been
able to show that the damage was caused by events which are included under the policy.
The insurer has provided sufficient information to show that, on balance, the earthquake did
not cause the damage and further that the engineer’s report has strongly confirmed this.
In the circumstances the insurer is entitled to deny the claim.
2.2 Why is the outcome fair?
The complainant has been given the opportunity to address all matters raised by the insurer.
Whilst I accept that PB did consider the possibility of the damage being related to the
earthquake he also recommended that an engineer be appointed to provide a causation
report.
Determination | Case number: 883621 Page 5 of 6
I have considered the provisions of the policy and nothing the complainant has raised
convinces me the damage to the property was caused by the earthquake. I am satisfied that
PB’s report required the engineer to further examine the property.
The engineer rejected the damage as earthquake related.
The insurer has accepted other damage not the subject of this claim. In the circumstances it
would be unfair to require the insurer to compensate the complainant.
Determination | Case number: 883621 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.