Home / Hollard / Determination 883079
Determination 883079
Insurer's settlement of machinery breakdown claim by compressor replacement rather than full unit replacement
Summary
The complainant's business air conditioner compressor burnt out and he replaced the whole unit at a cost of $11,220, then sought full replacement cost from the insurer, which had offered the cost of the compressor. AFCA decided the unit could have been repaired and the insurer's liability is limited to the damaged parts, but required it to add a 20% contingency to its $4,740 estimate.
The policy limits the insurer's liability to the cost of repairing or replacing the damaged machinery parts where replacement parts are available, and full unit replacement was a mitigating step driven by age rather than the damage.
Issues
- Claim amount dispute primary · upheld
“The insurer is required to add 20% contingency to its offer; within 14 days pay $5,688 (excluding GST) being $4,740 plus $948 contingency less policy deductibles.”
- Claim denial secondary · not upheld
“Is the insurer liable for the replacement of the unit? No. The exchanged information shows the unit could have been repaired as replacement of the damaged parts was available.”
Subjects and remedies
business interruptionhome or building damagepay claim
Text of the determination
Determination
Case number 883079
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 883079 Page 1 of 4
Case number: 883079 8 December 2022
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under his business insurance
policy. This is for the damage sustained to the air conditioner unit.
The insurer accepted the claim and offered the complainant the cost of the compressor’s
replacement being the damaged part.
The complainant disagrees and seeks the replacement of the air conditioner unit.
1.2 Issues and key findings
Is the insurer liable for the replacement of the unit?
No. The exchanged information shows, on balance, the air conditioner unit could have been
repaired as the replacement of the damaged parts was available.
The insurer is required to add 20% contingency to its offer.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of the insurer receiving notification the complainant accepts this
determination, the insurer is required to pay the complainant $5,688 (excluding GST)
$4,740 for the replacement of the damaged parts
plus $948 being 20% contingency for the transfer of risk
less policy deductibles.
Determination | Case number: 883079 Page 2 of 4
2 Reasons for determination
2.1 Is the insurer liable for the replacement of the unit?
No. The exchanged information shows, on balance, the air conditioner unit could have been
repaired as the replacement of the damaged parts was available.
The insurer is required to add 20% contingency to its offer.
There is no dispute the air conditioner unit is damaged
There is no dispute:
the air conditioner ’s compressor has burnt out
the complainant established a valid claim under the terms and conditions of the policy
the complainant lodged the claim after he replaced the unit
the complainant paid $11,220 for the replacement of the entire unit.
The complainant says he followed his technician’s advice and replaced the unit. This is due to
the age and state of the unit.
The insurer says the compressor could be successfully replaced and this settlement method
is in line with the policy. The exchanged evidence shows the original compressor is no longer
available however there is a generic replacement compressor available. This is consistent
with the complain ant’s technician (LC) findings.
I note the insurer’s policy outlines how the claim should be settled. The insurer’s policy states
the insurer will pay the cost to repair or replace the damaged machinery. Further, if the
damaged replacement part is unavailable, the insurer will not pay more than the cost of the
similar parts which are available at the time. I note the Machinery Breakdown sum insured
shown on the policy is $10,000.
The insurer is required to increase its offer by 20%
The co mplainant’s main argument is that the unit should be replaced as suggested by LC. In
his letter, LC says the compressor can be replaced. However, LC recommends the
replacement of the air conditioner unit on the basis
the air conditioner is old
it is commercially viable to replace the air conditioner rather than maintain the old unit
other parts of the unit might fail given its age.
I am satisfied the evidence shows the unit required replacement due to its age, condition and
location rather than the nature and extent of the damage. I consider the replacement of the
entire unit is a mitigating step by the complainant given the age of the unit.
Having reviewed the exchanged evidence, I am satisfied the insurer is liable for the
replacement of the compressor.
The insurer’s assessor (ST) estimated the replacement of the damaged parts to be $4,740
(excluding GST). The insurer is required to add another 20% contingency given the quote is
not an actionable quote.
Within 14 days of the insurer receiving notification the complainant accepts this
determination, the insurer is required to pay the complainant $4,740 plus $948 being 20%
contingency for the transfer of risk totalling $5,688 (excluding GST) less policy deductibles.
Determination | Case number: 883079 Page 3 of 4
2.2 Why is the outcome fair?
The insurer is entitled to rely on the policy wording to establish the extent of its liability. The
policy limits the insurer’s liability to the damaged parts.
Determination | Case number: 883079 Page 4 of 4
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.