Insurer denied business property claim for earthquake damage to restaurant floor tiles
Text of the determination
Determination
Case number 882758
Financial firm Blue Zebra Insurance
Determination | Case number: 882758 Page 2 of 9
Case number: 882758 23 January 2023
1 Determination overview
1.1 Complaint
The complainant is a restaurant that held a business insurance policy with the financial firm
(the insurer). It lodged a claim saying its building was damaged by an earthquake.
The insurer denied the claim because it did not accept that the damage was caused by an
earthquake. It said the damage was long-term and gradual.
The complainant says the earthquake caused cracks in floor tiles, internal walls, and an
external wall. However, it has only claimed the cost of repairing the floor tiles.
1.2 Issues and key findings
Is the damage covered under the policy?
The policy covers sudden and unexpected damage during the period of insurance.
The available information does not show any damage was caused by an earthquake.
However, the available information indicates cracks in the kitchen floor tiles appeared
suddenly and unexpectedly during the period of insurance. The policy covers the cost of
repairing these cracks.
1.3 Determination
This determination is in favour of the complainant.
The insurer must pay the complainant:
$16,830 ($15,300 plus GST) for the cost of repairing the cracked tiles
$1,650 for the cost of appointing the complainant’s engineer.
Determination | Case number: 882758 Page 3 of 9
2 Reasons for determination
2.1 Is the damage covered under the policy?
Policy covers sudden and unexpected damage
The terms of the policy are set out in the policy schedule and the product disclosure
statement. Relevant policy terms are quoted in section 3.2 of this determination.
The complainant has cover under the policy section titled ‘property protection’. This se ction
provides cover ‘ for property that is damaged at the premises during the period of insurance ’.
The policy contains the following definitions:
‘d amage ’ or ‘damaged’ means accidental physical damage, destruction or loss
‘a ccidental ’ means an unforeseen, unintended and unexpected event, which occurs
suddenly and at a specific place and time.
Complainant lodged claim for earthquake damage
The policy provided cover from 1 September 2021.
On 22 September 2021, an earthquake occurred in Victoria. On 8 October 2021, the
complainant lodged a claim saying the earthquake caused cracking in the walls and floor of
the business.
The insurer appointed an engineer, who inspected the property and produced a report dated
24 November 2021 . The insurer’s engineer confirmed there were cracks in the floor tiles, but
said they were not caused by the earthquake. On 27 January 2022, the insurer denied the
claim.
The complainant appointed an engineer, who inspected the property on 19 April 2022. The
complainant’s engineer’s repor t included photographs showing cracks in floor tiles, internal
walls, and an external wall. The report said these cracks were caused by the earthquake.
The insurer’s engineer produced a letter dated 19 May 2022. The letter said they reviewed
the complainan t’s engineer’s report, but disagreed with its conclusion that the cracks were
caused by the earthquake.
The complainant has provided AFCA with copies of its engineer’s report, and the insurer’s
engineer’s letter of 19 May 2022. However, AFCA has not received a copy of the insurer’s
engineer’s report of 24 November 2021.
Insurer did not provide requested information
On 23 May 2022, the complainant lodged this complaint with AFCA.
On 5 September 2022, AFCA sent a letter to the insurer outlining AFCA’s understanding of
the complainant. The letter asked the insurer to provide:
a written outline of its position regarding the complaint
all documents relevant to the complaint, including any expert reports.
The letter asked the insurer to provide the requested information by 12 September 2022.
On 13 September 2022, AFCA called the insurer and left a message asking it to respond to
the letter of 5 September 2022.
Determination | Case number: 882758 Page 4 of 9
On 13 September 2022, AFCA sent a letter to the insurer saying AFCA had not received a
response to the letter of 5 September 2022. The letter repeated the request for information,
and asked the insurer to provide the requested information by 20 September 2022.
On 29 September 2022, AFCA sent a letter to the insurer saying AFCA had not received a
response to the letter of 5 September 2022. The letter repeated the request for information,
and asked the insurer to provide the requested information by 6 October 2022.
On 12 October 2022, AFCA called the insurer and left a message asking it to respond to
AFCA ’s letters.
On 16 November 2022, the insurer emailed AFCA saying it had considered the complaint,
and it referred to its IDR (internal dispute resolution) determination letter. This was a letter
sent to the complainant on 10 March 2022 maintaining the decision to deny the claim, and
explaining the reasons for its decision. The insurer did not provide a copy of this letter, but
AFCA has received a copy from the complainant.
On 18 November 2022, the insurer emailed AFCA apologising for its lack of responsiveness.
However, the insurer has not provided any of the information requested in AFCA’s letter of 5
September 2022.
Under AFCA Rule A.9.5, we may draw an adverse inference from a party’s failure to provide
information we request, unless the party has a reasonable excuse, or special circumstances
apply. AFCA’s letters of 5 September 2022, 13 September 2022, and 29 September 2022
stated that if the insurer did not provide the requested information, AFCA may infer that the
information it did not provide did not favour its position.
The insurer has not provided any of the requested information, and has not given any reason
why it is unable to provide the information. In the circumstances, I consider it fair to infer that
the information not provided (including the insurer’s engineer’s report of 24 November 2021 )
does not support the insurer’s position.
Damage not caused by earthquake
The complainant’s engineer said a crack in an external wall was caused by the earthquake on
22 September 2021. However, the insurer’s engineer said the same crack was visible in
Google Street View photographs taken in April 2019. The complainant has not responded to
this point.
I have checked Google Street View and confirmed the crack was visible in April 2019. The
crack was also visible (though smaller) in November 2016 and September 2014. The crack
was clearly not caused by the earthquake.
The complainant ’s engineer said the internal cracks ‘can be related’ to each other, and were
‘not far apart’, which confirmed they were caused by the earthquake. They did not cite any
other evidence that the cracks were caused by an earthquake. They also said the floor cracks
matched the crack in the external wall, and this confirmed they were all caused by the
earthquake. This was not true; the external crack appeared at least seven years before the
earthquake.
The available information does not establish that any of the cracks were caused by the
earthquake.
Determination | Case number: 882758 Page 5 of 9
Tile cracks were sudden and unexpected
The external crack developed over many years. However, the internal cracks may have been
sudden and unexpected, and may have occurred during the period of insurance.
The complainant says the cracks in the floor tiles were discovered immediately after the
earthquake, and they were not there the day before. The insurer’s engineer said the tile
cracks were ‘ aged in appearance, with chips and rounded edges ’. However , as I have not
read the engineer’s report, I cannot determine how much weight to give this assessment.
Having considered the information provided by both parties, I am not satisfied that the tile
cracks were caused by an earthquake. However, I am satisfied that they were sudden and
unexpected, and occurred during the period of insurance. This is because of the
complainant’s statement that the cracks appeared suddenly, and the inference that the
insurer’s engineer’s report of 24 November 2021 does not support the insurer’s po sition.
The policy covers sudden and unexpected damage during the period of insurance. Therefore,
the insurer must accept the claim for damage to the tiles.
Insurer must pay cost of repairing cracks
The complainant has provided a tile flooring repair quote for:
$15,300 plus GST for repairs to the ‘Kitchen & Dining Rear End’
$5,500 plus GST for repairs to the ‘Front Dining Area – if required’.
The available information does not show there is any damage to flooring in the front dining
area. Therefore, the insurer is not required to pay for repairs to the front dining area.
The complainant’s engineer’s report included photographs of several cracked tiles in the
kitchen. For the reasons set out above, I am satisfied these cracks were sudden and
unexpected, and occurred during the period of insurance. The insurer is required to pay
$16,830 ($15,300 plus GST) for the cost of repairing these cracks.
The complainant has not claimed the cost of repairing the cracks in the internal walls or the
crack in the external wall.
Insurer must pay cost of appointing complainant’s engineer
The complainant’s engineer invoiced the complainant $1,650 (including GST) for their
inspection and report. The complainant wants the insurer to reimburse it for this expense.
Under the AFCA Rules, we can require an insurer to contribute to legal costs, other
professional costs, or travel costs a complainant incurred in making a complaint. In
considering whether an insurer should contribute to a complainant’s costs, we consider
whether they were reasonably incurred, and whether they helped resolve the complaint.
The insurer’s claim denial letter of 27 January 2022 said it was denying the claim based on
the expert advice of its engineer. In the circumstances, it was reasonable for the complainant
to appoint its own engineer.
The complainant’s engineer’s report was not convincing. However, it contained useful
information, and I found it helpful in writing this determination. In my view, it would be fair for
the insurer to reimburse the complainant for the cost of the report.
The insurer must pay the complainant $1,650 for the cost of appointing the complainant’s
engineer.
Determination | Case number: 882758 Page 6 of 9
Outcome is fair in the circumstances
The policy covers sudden and unexpected damage during the period of insurance.
The complainant says the tiles cracked suddenly and unexpectedly during the period of
insurance. The insurer has not provided information showing why it should not be required to
pay for this damage . The insurer has not provided a copy of its engineer’s report on the cause
of the damage, despite several requests from AFCA.
In the circumstances, it is fair for the insurer to pay for the cost of repairing the tiles.
Determination | Case number: 882758 Page 7 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Complainant represented by insurance broker
The complainant was represented by an insurance broker. In this determination, statements
by the complainant’s representative are treated as if they were made by the complainant.
3.2 Relevant policy terms
Policy Schedule
Cover Required for: (p age 2)
Property Protection: Insured
Determination | Case number: 882758 Page 8 of 9
Product Disclosure Statement
PROPERTY PROTECTION (pages 1 7 – 30 )
What you are covered for
When you purchase this cover and pay or agree to pay us the premium for it, we will pay:
Property damage
up to the limit of liability for property that is damaged at the premises during the period of
insurance…
What you are not covered for
…
Subject to section 54 of the Insurance Cont racts Act 1984 (Cth), there is no cover under the
Property Protection section of this policy i n any of the following circumstanc es.
…
6. We will not pay for damage caused by or arising from:
…
h. erosion, landslide, mudslide, rockslide, subsidenc e, settling, seepage, shrinkage or
expansion of earth, vibration or other earth movement, unless caused by or arising from a
direct consequence within seventy - two (72) hours of a storm, of an earthquake, tsunami,
subterranean fire, volcanic eruption, flood or water escaping from a water main owned by a
water supply aut hority.
…
11. We will not pay for damage cause d directly by or arising directly from:
…
b. gradually operating causes such as, but not limited to, wear and tear, disease, fading, tree
roots, change in flavour, colour, temperature or texture;
…
e. latent defects, inherent defects, faulty workmanship, faulty material, structural defects or
faulty design. Provided that this exclusion shall not apply to the extent s.46 of the Insurance
Cont racts Act 1984 (Cth) provides a remedy;
…
Definitions
The following definitions shall apply to the terms used in this cover section.
Term Definition
… …
Damage or damaged Damage or damaged means accidental physical damage, destruction
or loss.
Damage or damaged does not include the actual or alleged exposure
of property to any harmful substanc e or agent, whether on the surface
of the property or otherwise and which substance or agent does not
change the physical characteristics of the property (whether or not it
impairs the property’s utility).
… …
Determination | Case number: 882758 Page 9 of 9
GENERAL DEFINITIONS (pages 62 – 64)
The following General Definitions shall apply to the words used in your policy.
Term Definition
Accidental Accidental means an unforeseen, unintended and unexpected event,
which occurs suddenly and at a specific place and time.
… …
3.3 Relevant AFCA Rules
Section A – Complaint Resolution Processes
Section A provides an overview of the AFCA complaint resolution scheme and how
complaints are considered. Reference should be made to section E for the meanings of
terms that are capitalised.
A.9 Gathering relevant information
A.9.5 If a party to a complaint without reasonable excuse fails to provide
information, or to take any other step required by AFCA, within the AFCA
specified timeframe, AFCA may take whatever steps it considers
reasonable in the circumstances:
a) If the information requested by AFCA is of material importance,
AFCA will proceed with the resolution of the complaint on the basis
that an adverse inference will generally be drawn from that party’s
failure to comply with AFCA’s requirement, unless special
circumstances apply.
b) If the Complainant fails to comply with an AFCA requirement, AFCA
may refuse to continue considering the complaint.
Section D – Remedies
Section D sets out the remedial action that an AFCA Decision Maker has the power to
decide upon. In the case of a Superannuation Complaint, there is no monetary limit on the
amount that may be awarded to the Co mplainant. For most other complaints, a limit per
claim applies as set o ut in the table in this Section.
D.5 Costs of pursuing complaint other than a Superannuation Complaint
D.5.1 An AFCA Decision Maker may decide that the Financial Firm is to
contribute to the legal or other professional costs or travel costs incurred
by the Complainant in the course of the complaint.
D.5.2 Unless special circumstances apply, AFCA will not require the Financial
Firm to contribute more than $5,000 to these costs.