The complainant's storm damage claim was denied for roof maintenance and gradual deterioration. AFCA upheld the denial but found the insurer's inadequate initial make safe left a mould risk, so it must arrange or cash settle mould remediation and pay $1,000 compensation.

The proximate cause of the damage was the pre-existing deteriorated roof, which is excluded under the policy, but the insurer's inadequate make safe meant it is fairly responsible for the ongoing mould.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay non financial lossrepair or rectify

Related

All Open Insurance Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 882341 Financial firm Open Insurance Pty Ltd Determination | Case number: 882341 Page 1 of 5 Case number: 882341 18 January 2023 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer). He says the home was damaged in a storm in February 2022 and now has persistent mould. The complainant lodged a claim for that damage. The insurer denied the claim. It says the damage was caused by lack of maintenance and/or gradual deterioration of the property. In the course of the complaint, the insurer agreed to arrange for re-inspections and new assessments of the property damage: a new builder assessed the roof and a restorer re- assessed the mould issue. Based on the reports provided, the insurer maintained its denial of the claim. The complainant was unhappy with the time taken to finalise those agreed re- assessments. He believes the claim should be covered. 1.2 Issues and key findings Has the insurer acted reasonably in its handling of the claim? It took about 2 months for the further new assessments of the damage to be finalised (after the insurer agreed to arrange those), and for the insurer to confirm its claim decision. However, that was not unreasonable in the circumstances. The result of the new roof assessment supports the insurer’s denial of the claim , in that the roof damage (and therefore the reason water was able to enter the building) was from maintenance issues for which the complainant is responsible under the policy. The complainant has not provided compelling evidence to refute the insurer’s expert roof reports. With regard to the mould still present on the ceilings, however, the evidence indicates the insurer’s ini tial make-safe was cut short, and the property was not fully dried out after the storm event. That means, on balance, the mould risk was not adequately addressed at the time. The insurer is therefore responsible for further mould remediation. It is also fair in the circumstances that the insurer pay $1,000 compensation for upset caused. Why is the outcome fair? It would not be fair to require the insurer to pay the claim when the evidence shows the proximate cause of the damage was the deteriorated condition of the roof. However, it is fair that the insurer be held responsible for the continuing mould issue, which on balance has developed because of its inadequate make-safe. 1.3 Determination This determination is partly in favour of the complainant. The insurer is liable for the remediation of remaining mould in the property. It is required to either promptly atten d to those works or to cash settle the complainant the cost to him of having the mould remediation carried out. It is also required to pay $1,000 compensation for non-financial loss. Determination | Case number: 882341 Page 2 of 5 2 Reasons for determination 2.1 What is the first issue? Policy covers insured events subject, to exclusions and conditions The policy covers loss or damage caused by listed insured events. That includes loss or damage caused by ‘storm and rainwater’. However, that cover is subject to general exclusions, including:  gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light; …  poor maintenance and failure to maintain the property in good repair … Insurer undertook initial investigations into the claim After the claim was lodged, the insurer arranged for repairer CS to inspect and assess the damage on 3 March 2022. CS identified the following: Rainwater damage has occurred to the ceiling and walls, where it is split and sagging, with a section requiring replacing and painting. CS did not identify any storm-created openings in the roof. Instead, they found what they said were maintenance issues contributing to gradual deterioration: including rusted roof sheets, flashings, cappings, loose and missing fittings. They concluded the internal water damage was because water had entered through openings in the roof caused by gradual deterioration. They said the damage had been occurring over a period of time. The complainant submits he was not reasonably aware of any such maintenance issues, although CS disagrees, ‘ due to the location of the ingress points and the resultant damage being old ’. The complainant also says what may appear to be areas of rust on the roofing, are simply areas where the original red colouring is showing through (although I do not accept that is the case, based on the photographic evidence) . CS also provided a tax invoice for attendance and make safe work carried out by a mould/remediation specialist on 25 February 2022 when drying equipment was installed (although no separate report by that unidentified specialist has been provided). The restorer removed the drying equipment on 2 March 2022. The complainant emailed the insurer that day to say that the restorer had only partly completed the necessary drying out, and there were still signs of dampness behind a wall. He was concerned there was further mould, particularly since several members of his family had respiratory conditions. The complainant also says the restorers damaged the timber stairs in the house (with varnish being ripped off). Determination | Case number: 882341 Page 3 of 5 Insurer conducted further inspections and assessment Since this complaint was brought to AFCA, the insurer agreed, on 29 August 2022, to conduct further inspections and assessments of the damage. The available evidence shows the insurer emailed the complainant the following day to confirm they had sent instructions for CC to prepare:  roof inspection and report on cause of water entry during the rainfall event in February 2022  scope of work and quote for repairs to the staircase where varnish was removed by the restorer  restorer to report on whether there is still mould as a result of the rainfall event. An email from the complainant to the insurer on 19 September 2022 confirmed both assessments had been completed, but that he had heard nothing more. On 26 September 2022 the insurer forwarded CC’s roof report (dated 5 September) to the complainant. That report confirmed: the cause of damage is due to the state of the roof sheets and associated members allowing water to ingress the ceiling cavity. The water ingress has occurred due to the roof sheets rusting through, which is presenting holes, and rusted fixings which are allowing water ingress as a result of the fixings failing and allowing sheet flex or the sheets to become loose. The valleys of the roof have also been identified as being rusted through. CC concluded the issue was maintenance-related: We are of the opinion the Roof sheets, Flashings and Capping’s are at the end of their serviceable life and recommend replacing. On 3 October 2022, the insurer sent the complainant the restoration report from J dated 5 September 2022. That report concluded the cause of the damage was ‘environmental mould’, reporting: All affected areas were at dry standard. Walls have clear water damage …. It is in [J's] opinion that the mould on the ceiling appears to be environmental. If insurer wishes environmental mould to be treated please re engage [J] to complete further works. After the complainant asked for updates, on 19 October 2022 the insurer responded saying it was still chasing the staircase damage report. On 24 October 2022, the complainant approached AFCA again with his concerns about the insurer’s actions regarding the prom ised inspections and reports. Then on 26 October the insurer advised they had cash settled the complainant for the staircase damage caused by their contractor. I understand that was in the amount of $700. I have seen nothing to suggest that was an unreasonable settlement for that issue. Determination | Case number: 882341 Page 4 of 5 On that date the insurer also emailed the complaint its decision to maintain its denial of the claim. Insurer not liable for the claim The complainant has not established the storm event was the proximate cause of the damage. He has not provided expert or other compelling evidence to refute the insurer’s reports or conclusion that the water ingress into the house was the result of the pre-existing deteriorated and aged condition of the roof. That is a maintenance issue for which he is responsible under the policy. That means I am satisfied the insurer is entitled, under the policy, to decline the claim itself. Initial make safe did not adequately deal with mould/risk of mould However, while the second mould assessment suggested the mould still seen on the ceilings (about 5 months after the storm event) was ‘environmental mould’ , which is excluded under the policy, I consider the availabl e evidence does indicate the insurer’s initial make safe (drying out) work was cut short and did not, on balance, fully address the internal moisture or mould issues/risks at the time. I am satisfied that meant there was a real likelihood that any remaining moisture would have allowed mould to develop and spread during the period while the claim and complaint was ongoing. In the circumstances, I consider it fair and appropriate that the insurer be responsible for remediation to deal with the mould presence. That should be dealt with promptly, either by way of the insurer arranging for the work to be conducted, or by it cash settling the reasonable cost to the complainant of dealing with the necessary work (based on actionable quote(s) the insurer should obtain and provide to the complainant). Compensation for non-financial loss is warranted I do not consider the time taken for the insurer to arrange for and finalise the further assessments it agreed to undertake was unreasonable in the circumstances, even though it appears the complainant did need to chase updates. At the same time, however, I appreciate the complainant’s keenness to finalise the issues, particularly given his understandable concerns about the continuing mould and the likely health impacts of that on his family. In the particular circumstances, I am satisfied the insurer should pay $1,000 compensation for non-financial loss in recognition of the significant upset and inconvenience caused by its actions (specifically, in not properly addressing the mould issue in initial make safe work). 2.2 Why is the outcome fair? It would not be fair to require the insurer to pay the claim when the complainant has not established, on balance, the proximate cause was the storm event. Instead, the evidenc e shows the storm would not have caused damage if it were not for the pre-existing condition of the roof. It is however fair that the insurer be held responsible for ongoing mould, which is more likely than not the result of, or at the very least, exacerbated by its initial inadequate make safe. Determination | Case number: 882341 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.