Home / Hollard / Determination 882134
Determination 882134
Insurer declined cover for roof tile damage alleged to result from defective 2019 roof replacement works
Summary
The complainant sought cover for roof tile damage in 2022, alleging defective workmanship or materials in the insurer's 2019 roof replacement. AFCA found for the insurer as the complainant had not shown the damage related to those works.
The onus was on the complainant to show on balance that the damage arose from defective workmanship or materials, and the expert information did not establish this.
Issues
- Claim denial primary · not upheld“The insurer is entitled to decline indemnity for the cost to repair the damaged roof.”
- Repairs or contractors secondary · not upheld“complainant has not shown the damaged tiles relate to the works authorised by the insurer under her claim in 2019”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
Text of the determination
Determination
Case number 882134
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 882134 Page 1 of 4
Case number: 882134 24 November 2023
1 Determination overview
1.1 Complaint
The complainant held a home building insurance policy (policy) underwritten by the financial
firm (insurer) for the period 13 February 2019 to 13 February 2020. On 23 November 2019, a
claim was lodged for damage to the insured building caused during a significant storm event
on or about 16 November 2019. The insurer accepted the claim and authorised repairs to the
building, including a complete roof replacement.
The complainant has since taken out insurance cover for her home with another financial firm
(insurer 2). The complainant lodged a claim for internal storm water ingress damage with
insurer 2, said to be due to a storm event on 23 February 2022. As part of an assessment
completed by insurer 2, several roof tiles were found to have cracked or slipped. Insurer 2
has agreed to cover the internal water ingress damage, however, has declined cover for the
roof tiles. It says the damaged tiles are not consistent with the storm event.
On 4 March 2022, the complainant contacted the insurer seeking cover for the cost to repair
the roof. The complainant says given the roof replacement two years prior, the damage to the
roof now is because of defective installation or poor-quality tiles used by the insurer. The
insurer does not accept the damage to the roof, some two years after it completed the roof
replacement, relate to poor workmanship or materials as alleged.
1.2 Issues and key findings
Is the insurer entitled to decline indemnity for the roof damage?
Yes. The insurer is entitled to decline indemnity for the cost to repair the damaged roof. The
available information does not show the damage is related to the complainant’s claim and
associated repairs in 2019.
Why is the outcome fair?
The outcome is fair because the complainant has not provided any persuasive information to
support her opinion the damage to the roof relates to or arises from defective workmanship or
materials used by the insurer’s appointed consultants in 2019.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim and is not required to take any further action.
Determination | Case number: 882134 Page 2 of 4
2 Reasons for determination
2.1 Is the insurer entitled to decline cover for the roof?
Yes. Given the complainant has not shown, on balance, the recent damage to the roof tiles
relates to the works it authorised under her claim in 2019, it is fair that the insurer be
permitted to decline cover for the roof damage.
No dispute the insurer authorised a complete roof replacement in 2019
There is no dispute the complainan t’s home suffered significant storm damage in November
2019, which includes hail damage to the tiled roof. Further, that the insurer accepted this
damage under the claim and authorised a complete roof replacement. These works were
finished on or about 30 April 2020.
Complainant bears the onus to show insurer is liable for recent roof damage
The complainant in bringing this complaint against the insurer says the recent damage to the
roof tiles relates to the insurer’s repairs authorised in 2019. She is of t he opinion the damaged
tiles are because of poor installation and/or poor materials used by the insurer’s appointed
consultants in 2019.
I am satisfied, given it is the complainant who is alleging poor workmanship and/or materials,
the onus first rests with her to show, on balance, the insurer is liable for the loss or damage
claimed. Only if the complainant is successful in establishing such, will it fall to the insurer to
show an entitlement to decline responsibility for the damage.
Expert reports do n ot support complainant’s position
Insurer 2 appointed consultants ‘L’ to assess the cause and extent of the damage to the
complainant’s home when she lodged a claim in February 2022. L confirmed stormwater
ingress damage to ceilings in the entry and kitchen. L also noted several cracked and slipped
roof tiles. In L’s opinion the damage had been present for up to seven days, gi ven it was fresh
but L was unsure what caused the damage to the tiles. This is because there had not been a
hail event since the roof was replaced two years prior.
The insurer appointed consultants ‘AB’ to inspect the damage roof tiles. AB attended on 23
March 2022. AB noted that since the roof replacement works completed in 2019/2020, the
complainant had arranged for the installation of solar panels as well as ducted air-
conditioning. AB noted sarking had been cut within the roof void and says the cracked tiles
were not due to a defect from the original roof replacement works.
The complainant has provided an email from consultants ‘IS’ dated 28 September 2022. IS
had installed the solar panels and notes that the internal water ingress damage is nowhere
near where the solar panels had been installed. IS noted damage to roof tiles, however, that
these were located all over the roof and not in the area of the solar panels.
The complainant has also provided an email from consultants ‘AE’ dated 29 September 2022.
AE installed the ducted air conditioning system. I note in this email AE sets out the installation
process as well as the components used in installing the air conditioning system. This
information indicates AE was not required to go onto or interfere with the external roof at all.
Determination | Case number: 882134 Page 3 of 4
Information does not show defective installation/materials is cause of damage
I have considered all the information. I am not satisfied this establishes, on balance, that the
recent damage to the roof tiles is because of defective installation or materials used by the
insurer’s repairers under the claim in 2019.
I acknowledge the information from L, AB, IS and AE. However, none of these consultants
have commented on or provided any persuasive information to support the complainant’s
assertion. In saying that, I accept the complainant’s view and accept there is no information to
establish the damage was caused by IS or AE, when installing the solar panels and air
conditioning system.
On considering the information, I am of the opinion it is reasonable to accept the damage to
the roof tiles and associated water ingress issues are a more recent occurrence. This is
because there is no indication of damage to the roof or water ingress for the two years after
the roof replacement. Further, even L has indicated the damage is recent i.e. occurred up to
seven days before its assessment on 24 February 2022.
Insurer is entitled to decline cover for the roof damage
As noted above, the onus first rests with the complainant to show, on balance, the insurer is
liable for the damage to the roof tiles. In line with the matters considered above, I am not
satisfied the complainant has shown the damaged tiles relate to the works authorised by the
insurer under her claim in 2019.
2.2 Why is the outcome fair?
The outcome is fair because the complainant has not provided any persuasive information to
support her opinion the damage to the roof relates to or arises from defective workmanship or
materials used by the insurer’s appointed consultants in 2019 .
Determination | Case number: 882134 Page 4 of 4
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.