Home / Allianz Australia / Determination 882045

Determination 882045

Claim declined for water ingress damage

FirmAllianz Australia
Decided2023-01-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under a home policy for water ingress damage after a reported storm, and the insurer declined the claim as long-term damage from building defects and gradual deterioration. AFCA decided in favour of the insurer, finding the complainant had not established a storm as the proximate cause.

The complainant bears the onus of establishing a valid storm claim, and on balance the damage resulted from gradual deterioration and construction defects rather than a single insured storm event.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 882045 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 882045 Page 1 of 7 Case number: 882045 23 January 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). The complainant first lodged a claim in June 2018, for damage caused by water ingress following a storm reported as happening on 30 May 2018. The insurer initially declined the claim on the basis the internal damage was not the result of a single insurable storm event, instead citing exclusions for maintenance issues, wear and tear or gradual deterioration from rain, and failure to keep the property watertight, well maintained, structurally sound and secure. The complainant took some remedial action but after a period of drought, further water ingress occurred during heavy rain in early 2022. She says the water damage was to the ceiling of the stairwell, rooftop balcony and to the side stringers of the stairs. The insurer again sent builders to assess and report on the cause of the damage. The builders concluded that the damage was consistent with long-term water ingress and was most likely the result of a failure of the waterproofing membrane. In line with the complainant’s own expert’s initial report, the insurer accepted there were building defects. The insurer says that, as the damage had not been caused by a single insured event, it is not covered under the policy. The complainant, however, says that none of the water tightness tests performed could identify any water leakage into the property; and so a significant storm event must be the cause. The complainant further states that their expert ’s amended final report concluded that the issues noted were not ‘ defects ’ after all, but that the damage was the result of leakage that occurred from the single storm event in 2018. 1.2 Issues and key findings Is the insurer entitled to decline the claim? The insurer is entitled to decline the claim because the complainant has not established, on balance, the proximate cause of the damage was a single insured storm event. Instead, the evidence indicates damage was found after three separate water ingress events from late 2017, early 2018 and 2022, which on balance arose from pre-existing inherent building/construction issues and gradual deterioration from rain. Why is the outcome fair? The outcome is fair in all the circumstances because the insurer’s obligations are limited by the policy terms. It would not be fair to require the insurer to cover the claimed loss when it has not been shown to be the result of a single insured event, but instead falls outside the scope of cover under the policy. 1.3 Determination This determination is in favour of the insurer. It is not required to take any further action. Determination | Case number: 882045 Page 2 of 7 2 Reasons for determination The complainant is represented by her solicitor. For simplicity, I will refer to the complainant and their solicitor as the ‘complainant’. 2.1 Is the insurer entitled to decline the claim? Yes. The insurer is entitled to decline the claim. That is because the proximate cause of the damage was not a single storm event, but was, on balance, the result of underlying inherent building/construction issues and gradual deterioration from rain. Policy covers insured events, subject to exclusions and conditions There is no dispute the insurer provided the complainant with the relevant policy documentation, including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The property is reported as having sustained damage variously during storm events in late 2017, early 2018 and again in 2022. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm’. Cover is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). Under the general exclusions, the policy does not cover any loss or damage caused by or arising from (amongst other things):  wear and tear, gradual deterioration, or fading  defects in design, structure, materials, workmanship or construction  failure to keep the property insured watertight, well maintained, structurally sound and secure. There is also a specific exclusion under the insured event of ‘storm’ for loss or damage caused by or resulting from ‘gradual deterioration from rain’. The insurer maintains the damage was not the result of a single insured storm event, but was longer-term. Onus on complainant to establish the proximate cause of the damage The onus is on the complainant to establish, on balance, she has suffered a loss/damage which falls within the scope of cover under the policy. That is, she needed to establish a ‘valid’ claim for damage caused by a storm event. Only if she establishes a valid claim, does the onus then shift to the insurer to show that exclusions apply, or that it is otherwise entitled to decline the claim. It is well-established law that a proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause. The courts have said that if one cause would have resulted in the harm in any case, and the other would not have done so in the absence of the first, then the first is the proximate cause. Identifying the proximate cause of the loss is the question of fact, depending upon the circumstances of each case. Determination | Case number: 882045 Page 3 of 7 Evidence shows the damage was long-term, from pre-existing building issues The insurer appointed building consultants PAT who initially attended the property on 27 June 2018 to investigate the cause and extent of damage which the complainant had reported to the insurer was from an event on 30 May 2018. However, PAT reported that during their attendance the complainant advised them that damage had occurred 12 months or more before. I also note a statement from builder PR, referred to in more detail below, shows he had attended first after the complainant reported damage in December 2017 and then again in February 2018. PAT identified damage to the wall area of the stairs and the second-storey ceiling. PAT also observed plaster damage to the stair stringer. Various photos show water staining, and attempts to address water damage to the stingers. PAT concluded that the damage in that area was not consistent with a single weather event, but was long-term. PAT then carried out tests to try to discover the water ingress entry point. These tests were unsuccessful in determining the area of ingress, and PAT advised that they could conduct invasive tests, but this would result in damage to internal and possibly external surfaces. PAT concluded that although they could not definitively determine the cause of damage, it was consistent with long-term water ingress, and was most likely the result of a failure of the waterproofing membrane over an extended period. The complainant noted that after the 2018 event, the lack of rain until the 2022 heavy rain event had kept the area dry and without further incidents of water ingress. To further address this new occurrence of the existing issue, the complainant then obtained an inspection report from an engineer, ENE on 24 March 2022, which concluded:  water ingress problem observed in the stairwell and damage  associated wall and ceiling areas is a result of incorrect building detailing and construction work  lack of continuous vertical upstand of at least 70mm for waterproofing  suggest, in remedying the issue, to install waterproofing (that complies with the recommendation of building codes) to the roof slab and doorway area. At the time of ENE’s inspection, invasive remedial work was already being undertaken by the complainant, which meant ENE had a ‘clear view of substrate structural elements’. ENE do make the point, however, that they had not been able to observe water ingress prior to removal of lining materials around the roof slab and external door to roof areas, or the substrate prior to commencement of the rectification work. The report from ENE concludes that: The water ingress problem observed in the stairwell and damage to associated wall and ceiling areas is a result of incorrect building detailing and construction work. The lack of continuous vertical upstand of at least 70mm for waterproofing is a latent building defect [Ref. AS 4854.2 Appendix A Table A1 for Wind Class N3 – applicable for the site]. Addressing the defect by surface remedial work such as a homeowner might reasonably be capable of undertaking (eg. replacing sealants), without complete removal of material to the structural substrate, would not have been effective in preventing the damage. Determination | Case number: 882045 Page 4 of 7 That latter paragraph appears to explain the reason that repair and other remedial work conducted by PR for the complainant in December 2017 was not sufficient to prevent the subsequent incidents of water ingress. I do not consider the complainant ’ s expert report supports the conclusion that a single storm event caused an opening which had allowed rainwater to enter. As the insurer correctly points out in this matter , a ‘s torm may highlight defects, but it cannot cause them ’ . PAT provided a supplementary report on 7 September 2022, having reviewed ENE ’s report about the cause of damage in relation to water ingress to the property. PAT agreed the most likely source of water ingress was failure of the waterproofing membrane in the area of the staircase to the roof top terrace. They noted the repairs described in the engineer ’ s report show that the cause of the water ingress and subsequent damage had now been rectified following the invasive work carried out by the complainant. PAT confirm that ENE identify the cause of the water ingress as a building defect, in that the construction of the area of concern did not meet the current building code or Australian Standard at the time of construction. ENE also identified a crack in a wall which had up till then been obscured by gyprock. PAT did acknowledge the complainant had been ‘ proactively trying to locate and rectify ’ the cause of the water ingress before the claim was re-visited, and they said they believed the complainant had not been aware of any building defect. What that comment does reinforce, however, is that this was not a one-off incident or isolated issue, but had been ongoing over time. In response to concerns raised by the complainant, ENE then provided a further report in October 2022. That effectively overrode their previous findings of building ‘ defects ’, by means of reference to an alternative ‘pathway to compliance’ with the applicable building code/standards. In this amended report, ENE proposes that the previous (inconclusive) waterproo fing tests ‘adequately established’ weatherproofing performance and compliance. In support of that, they also refer to the fact that the house had not previously experienced water ingress in the 15 years since it was built in 2003. (Their conclusion is set out in section 3 below.) I note, however, that waterproofing does not have an indefinite lifespan, and it can fail over time, particularly where it has been subject to repeated high rainfall and wind. In any case, ENE recommended the following to rectify the problem:  provide waterproofing that complies with AS 4854.1 to the roof slab and doorway area in accordance with AS 4854.2. Including reinstatement of existing slab waterproofing that has been removed to facilitate the remedial work  provide appropriate flashing to wall and slab junctions and to wall cavities in accordance with AS 4773.2 to prevent tracking of water where water is breaching the cavity and wetting the internal leaf  remove and replace moisture-affected internal building materials and linings. I am not persuaded that ENE’s amended report is sufficient in itself to compellingly refute their own initial findings and conclusion, which was that it was building defects (particularly, inadequacy of waterproofing) which were responsible for the water damage. Even if the inconclusive leak detection tests conducted by PR and PAT might arguably have, on the face of it, ‘adequately established’ compliance with the relevant Performance Requirement, as ENE suggests in their amended report, the evidence shows water had repeatedly/progressively been breaching the weatherproofing in the building through the roof and wall areas regardless. Determination | Case number: 882045 Page 5 of 7 Other statements not persuasive as to cause of damage The complainant submitted other statements to support her position, including from PR, a family member (who, I acknowledge, is a licensed builder); their accountant, and a local real estate agent, both of whom were familiar with the property. The statements essentially attest to the overall high quality and maintenance of the property, and the lack of obvious evidence of defects in the building. I also acknowledge PR says he conducted two leak detection tests which did not identify the source of water ingress, and on the basis of which he concluded only a storm event of sufficient severity could have caused the water ingress and damage which was evident when he re-inspected in 2018. However these are not independent expert reports and are not otherwise persuasive or compelling in determining the cause of the damage that was found, or identifying possible latent defects. ‘Valid’ claim for storm damage not established Having regard to all the available evidence, I am not satisfied the complainant has established that the proximate cause of the damage was a storm event. Instead I consider, on balance, that the damage was from gradual deterioration from rainwater which has been allowed to enter the building over time due to construction/building issues. If it were not for those pre-existing issues, then water would not have continued to enter the property and the internal damage would not have occurred. That means the insurer is entitled to decline the claim. 2.2 Why is the outcome fair? The outcome is consistent with the available information and the policy provisions. The information provided shows the damage is from factors which are not covered under the policy. It would be unfair to require the insurer to cover the claimed damage in the circumstances. Determination | Case number: 882045 Page 6 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Supporting Information ENE report, October 2022, conclusion: The cause of water ingress problem observed in the stairwell and damage to associated wall and ceiling dates back to a storm event 5 years ago. From the documents provided the detailing and construction of the roof area could have satisfied the NCC Volume Two Performance Requirement P2.2.2 by the pathway to compliance specified in NCC Volume Two A2.2(2)(a), (b), or (c). (My emphasis added) It is reasonable to conclude that if a Performance Solution was provided which included waterproofing testing (in a manner equivalent to that carried out to determine the source of the leak by [P] and [PR]) that demonstrated compliance Determination | Case number: 882045 Page 7 of 7 with the Performance Requirement P2.2.2. Weatherproofing performance for the area under concern was adequately established by both [P] and [PR]. The result is that a latent defect defined through non-conformance with the specified Deemed-to-Satisfy Solution is overridden. The house was constructed in about 2003 with water ingress first occurring in March 2018 (15 years later), and hence the construction methods that were employed, were sound.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.