Text of the determination
Determination
Case number 882045
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 882045 Page 1 of 7
Case number: 882045 23 January 2023
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). The
complainant first lodged a claim in June 2018, for damage caused by water ingress following
a storm reported as happening on 30 May 2018. The insurer initially declined the claim on the
basis the internal damage was not the result of a single insurable storm event, instead citing
exclusions for maintenance issues, wear and tear or gradual deterioration from rain, and
failure to keep the property watertight, well maintained, structurally sound and secure.
The complainant took some remedial action but after a period of drought, further water
ingress occurred during heavy rain in early 2022. She says the water damage was to the
ceiling of the stairwell, rooftop balcony and to the side stringers of the stairs.
The insurer again sent builders to assess and report on the cause of the damage. The
builders concluded that the damage was consistent with long-term water ingress and was
most likely the result of a failure of the waterproofing membrane. In line with the
complainant’s own expert’s initial report, the insurer accepted there were building defects.
The insurer says that, as the damage had not been caused by a single insured event, it is not
covered under the policy. The complainant, however, says that none of the water tightness
tests performed could identify any water leakage into the property; and so a significant storm
event must be the cause.
The complainant further states that their expert ’s amended final report concluded that the
issues noted were not ‘ defects ’ after all, but that the damage was the result of leakage that
occurred from the single storm event in 2018.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The insurer is entitled to decline the claim because the complainant has not established, on
balance, the proximate cause of the damage was a single insured storm event. Instead, the
evidence indicates damage was found after three separate water ingress events from late
2017, early 2018 and 2022, which on balance arose from pre-existing inherent
building/construction issues and gradual deterioration from rain.
Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer’s obligations are limited by
the policy terms. It would not be fair to require the insurer to cover the claimed loss when it
has not been shown to be the result of a single insured event, but instead falls outside the
scope of cover under the policy.
1.3 Determination
This determination is in favour of the insurer. It is not required to take any further action.
Determination | Case number: 882045 Page 2 of 7
2 Reasons for determination
The complainant is represented by her solicitor. For simplicity, I will refer to the complainant
and their solicitor as the ‘complainant’.
2.1 Is the insurer entitled to decline the claim?
Yes. The insurer is entitled to decline the claim. That is because the proximate cause of the
damage was not a single storm event, but was, on balance, the result of underlying inherent
building/construction issues and gradual deterioration from rain.
Policy covers insured events, subject to exclusions and conditions
There is no dispute the insurer provided the complainant with the relevant policy
documentation, including the PDS and certificate of insurance (COI). Therefore, I accept the
insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The property is reported as having sustained damage variously during storm events in late
2017, early 2018 and again in 2022. The policy covers the insured property against loss or
damage caused by one or more of the listed insured events, including ‘Storm’. Cover is
subject to the conditions, limitations and exclusions specified in the product disclosure
statement (PDS).
Under the general exclusions, the policy does not cover any loss or damage caused by or
arising from (amongst other things):
wear and tear, gradual deterioration, or fading
defects in design, structure, materials, workmanship or construction
failure to keep the property insured watertight, well maintained, structurally sound and
secure.
There is also a specific exclusion under the insured event of ‘storm’ for loss or damage
caused by or resulting from ‘gradual deterioration from rain’.
The insurer maintains the damage was not the result of a single insured storm event, but was
longer-term.
Onus on complainant to establish the proximate cause of the damage
The onus is on the complainant to establish, on balance, she has suffered a loss/damage
which falls within the scope of cover under the policy. That is, she needed to establish a
‘valid’ claim for damage caused by a storm event.
Only if she establishes a valid claim, does the onus then shift to the insurer to show that
exclusions apply, or that it is otherwise entitled to decline the claim.
It is well-established law that a proximate cause is not necessarily the first or last or the sole
cause of the loss. It is the effective, dominant or operative cause. The courts have said that if
one cause would have resulted in the harm in any case, and the other would not have done
so in the absence of the first, then the first is the proximate cause.
Identifying the proximate cause of the loss is the question of fact, depending upon the
circumstances of each case.
Determination | Case number: 882045 Page 3 of 7
Evidence shows the damage was long-term, from pre-existing building issues
The insurer appointed building consultants PAT who initially attended the property on 27 June
2018 to investigate the cause and extent of damage which the complainant had reported to
the insurer was from an event on 30 May 2018. However, PAT reported that during their
attendance the complainant advised them that damage had occurred 12 months or more
before. I also note a statement from builder PR, referred to in more detail below, shows he
had attended first after the complainant reported damage in December 2017 and then again
in February 2018.
PAT identified damage to the wall area of the stairs and the second-storey ceiling. PAT also
observed plaster damage to the stair stringer. Various photos show water staining, and
attempts to address water damage to the stingers. PAT concluded that the damage in that
area was not consistent with a single weather event, but was long-term.
PAT then carried out tests to try to discover the water ingress entry point. These tests were
unsuccessful in determining the area of ingress, and PAT advised that they could conduct
invasive tests, but this would result in damage to internal and possibly external surfaces.
PAT concluded that although they could not definitively determine the cause of damage, it
was consistent with long-term water ingress, and was most likely the result of a failure of the
waterproofing membrane over an extended period.
The complainant noted that after the 2018 event, the lack of rain until the 2022 heavy rain
event had kept the area dry and without further incidents of water ingress. To further address
this new occurrence of the existing issue, the complainant then obtained an inspection report
from an engineer, ENE on 24 March 2022, which concluded:
water ingress problem observed in the stairwell and damage
associated wall and ceiling areas is a result of incorrect building detailing and construction
work
lack of continuous vertical upstand of at least 70mm for waterproofing
suggest, in remedying the issue, to install waterproofing (that complies with the
recommendation of building codes) to the roof slab and doorway area.
At the time of ENE’s inspection, invasive remedial work was already being undertaken by the
complainant, which meant ENE had a ‘clear view of substrate structural elements’. ENE do
make the point, however, that they had not been able to observe water ingress prior to
removal of lining materials around the roof slab and external door to roof areas, or the
substrate prior to commencement of the rectification work.
The report from ENE concludes that:
The water ingress problem observed in the stairwell and damage to associated
wall and ceiling areas is a result of incorrect building detailing and construction
work. The lack of continuous vertical upstand of at least 70mm for waterproofing
is a latent building defect [Ref. AS 4854.2 Appendix A Table A1 for Wind Class
N3 – applicable for the site].
Addressing the defect by surface remedial work such as a homeowner might
reasonably be capable of undertaking (eg. replacing sealants), without complete
removal of material to the structural substrate, would not have been effective in
preventing the damage.
Determination | Case number: 882045 Page 4 of 7
That latter paragraph appears to explain the reason that repair and other remedial work
conducted by PR for the complainant in December 2017 was not sufficient to prevent the
subsequent incidents of water ingress.
I do not consider the complainant ’ s expert report supports the conclusion that a single storm
event caused an opening which had allowed rainwater to enter. As the insurer correctly points
out in this matter , a ‘s torm may highlight defects, but it cannot cause them ’ .
PAT provided a supplementary report on 7 September 2022, having reviewed ENE ’s report
about the cause of damage in relation to water ingress to the property. PAT agreed the most
likely source of water ingress was failure of the waterproofing membrane in the area of the
staircase to the roof top terrace. They noted the repairs described in the engineer ’ s report
show that the cause of the water ingress and subsequent damage had now been rectified
following the invasive work carried out by the complainant.
PAT confirm that ENE identify the cause of the water ingress as a building defect, in that the
construction of the area of concern did not meet the current building code or Australian
Standard at the time of construction. ENE also identified a crack in a wall which had up till
then been obscured by gyprock.
PAT did acknowledge the complainant had been ‘ proactively trying to locate and rectify ’ the
cause of the water ingress before the claim was re-visited, and they said they believed the
complainant had not been aware of any building defect. What that comment does reinforce,
however, is that this was not a one-off incident or isolated issue, but had been ongoing over
time.
In response to concerns raised by the complainant, ENE then provided a further report in
October 2022. That effectively overrode their previous findings of building ‘ defects ’, by means
of reference to an alternative ‘pathway to compliance’ with the applicable building
code/standards. In this amended report, ENE proposes that the previous (inconclusive)
waterproo fing tests ‘adequately established’ weatherproofing performance and compliance. In
support of that, they also refer to the fact that the house had not previously experienced water
ingress in the 15 years since it was built in 2003. (Their conclusion is set out in section 3
below.) I note, however, that waterproofing does not have an indefinite lifespan, and it can fail
over time, particularly where it has been subject to repeated high rainfall and wind.
In any case, ENE recommended the following to rectify the problem:
provide waterproofing that complies with AS 4854.1 to the roof slab and doorway area in
accordance with AS 4854.2. Including reinstatement of existing slab waterproofing that has
been removed to facilitate the remedial work
provide appropriate flashing to wall and slab junctions and to wall cavities in accordance
with AS 4773.2 to prevent tracking of water where water is breaching the cavity and
wetting the internal leaf
remove and replace moisture-affected internal building materials and linings.
I am not persuaded that ENE’s amended report is sufficient in itself to compellingly refute
their own initial findings and conclusion, which was that it was building defects (particularly,
inadequacy of waterproofing) which were responsible for the water damage.
Even if the inconclusive leak detection tests conducted by PR and PAT might arguably have,
on the face of it, ‘adequately established’ compliance with the relevant Performance
Requirement, as ENE suggests in their amended report, the evidence shows water had
repeatedly/progressively been breaching the weatherproofing in the building through the roof
and wall areas regardless.
Determination | Case number: 882045 Page 5 of 7
Other statements not persuasive as to cause of damage
The complainant submitted other statements to support her position, including from PR, a
family member (who, I acknowledge, is a licensed builder); their accountant, and a local real
estate agent, both of whom were familiar with the property. The statements essentially attest
to the overall high quality and maintenance of the property, and the lack of obvious evidence
of defects in the building.
I also acknowledge PR says he conducted two leak detection tests which did not identify the
source of water ingress, and on the basis of which he concluded only a storm event of
sufficient severity could have caused the water ingress and damage which was evident when
he re-inspected in 2018.
However these are not independent expert reports and are not otherwise persuasive or
compelling in determining the cause of the damage that was found, or identifying possible
latent defects.
‘Valid’ claim for storm damage not established
Having regard to all the available evidence, I am not satisfied the complainant has
established that the proximate cause of the damage was a storm event. Instead I consider, on
balance, that the damage was from gradual deterioration from rainwater which has been
allowed to enter the building over time due to construction/building issues. If it were not for
those pre-existing issues, then water would not have continued to enter the property and the
internal damage would not have occurred.
That means the insurer is entitled to decline the claim.
2.2 Why is the outcome fair?
The outcome is consistent with the available information and the policy provisions. The
information provided shows the damage is from factors which are not covered under the
policy.
It would be unfair to require the insurer to cover the claimed damage in the circumstances.
Determination | Case number: 882045 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Supporting Information
ENE report, October 2022, conclusion:
The cause of water ingress problem observed in the stairwell and damage to
associated wall and ceiling dates back to a storm event 5 years ago.
From the documents provided the detailing and construction of the roof area could
have satisfied the NCC Volume Two Performance Requirement P2.2.2 by the
pathway to compliance specified in NCC Volume Two A2.2(2)(a), (b), or (c). (My
emphasis added)
It is reasonable to conclude that if a Performance Solution was provided which
included waterproofing testing (in a manner equivalent to that carried out to
determine the source of the leak by [P] and [PR]) that demonstrated compliance
Determination | Case number: 882045 Page 7 of 7
with the Performance Requirement P2.2.2. Weatherproofing performance for the
area under concern was adequately established by both [P] and [PR].
The result is that a latent defect defined through non-conformance with the
specified Deemed-to-Satisfy Solution is overridden. The house was constructed in
about 2003 with water ingress first occurring in March 2018 (15 years later), and
hence the construction methods that were employed, were sound.