Earthquake damage claim denied under ground movement exclusion
Summary
The complainant claimed under a home insurance policy for earthquake-related cracking damage to his home. AFCA found the damage most likely resulted from long-term differential foundation movement, which is excluded, and determined the insurer was entitled to refuse the claim.
The complainant bears the onus of establishing the claim falls within policy terms, and the structural engineer's evidence that the cracking was longstanding and caused by ground movement from reactive clay soils outweighed the earthquake explanation.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to rely upon the terms and conditions of the policy to refuse payment of the claim.”
- Inadequate claim investigation secondary · not upheld
“The insurer has acted appropriately in arranging for an early assessment of the claim damage and for the subsequence attendance at the property of a structural engineer.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 881995
Financial firm AAI Limited
Determination | Case number: 881995 Page 2 of 6
Case number: 881995 18 October 2022
1 Determination overview
1.1 Complaint
The complainant holds a Home and Contents Insurance policy with the financial firm (insurer)
and lodged a claim on 22 September 2021 for damage caused by an earthquake.
Following investigation of the claim the insurer denied liability. The insurer says the damage
was not caused by an earthquake, but most likely by ground movement, which is excluded
under the terms of the policy.
The complainant has disputed the insurer's finding and believes the damage was caused
during the earthquake.
1.2 Issues and key findings
Has the complainant established a valid claim within the terms of the policy?
No. The available information is not sufficient to establish the cracking damage identified at
the property was caused or contributed to by an earthquake or other event covered under the
policy.
Is the Insurer entitled to refuse payment of the claim?
Yes, the insurer is entitled to refuse payment of the claim as:
the complainant has not established a claim within the terms of the policy
the policy excludes cover for loss or damage caused by earth movement.
Why is the outcome fair?
The outcome is fair as there is no dispute that the Complainant had been provided with the
relevant policy documents. The policy documents are clear. It is fair in the circumstances that
the insurer is entitled to rely upon the terms and conditions of the policy to refuse payment of
the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to rely upon the terms and conditions of the policy to refuse payment of
the claim.
Determination | Case number: 881995 Page 3 of 6
2 Reasons for determination
2.1 Has the complainant established a claim within the terms
of the policy?
No. The available information is not sufficient to establish the cracking damage identified at
the property was caused or contributed to by an earthquake or other event covered under the
policy.
Complainant has the onus to establish claim falls within the terms of the policy
It is established insurance law that an insured person has the initial onus to prove, on the
balance of probabilities (that is, more likely than not), that the loss or damage claimed falls
within the terms of the policy. This is commonly called a prima facie claim.
The complainant's Home and Contents policy is an insured events policy that provides cover
for a series of insured events including earthquake, subject to several terms and conditions.
The complainant lodged his claim on 22 September 2021 following a significant earthquake in
Victoria at approximately 9:15am that morning. According to the insurer's claim notes, the
complainant reported:
There was an earthquake this morning and I have noticed some cracks forming in
both internal walls (kids bedroom, main bedroom, hallway to lounge and lounge)
and ceiling (lounge only) and external walls (side wall next to driveway, which is
where kids room is). There has been no contents damage so far.
In support of the complainant's claim he has provided a copy of a pre-purchase assessment
dated 6 July 2020. There are some photographs attached to the assessment, although they
are not detailed and are of little assistance in determining any pre-existing damage or
earthquake damage.
The report records both the internal and external condition of the property to be good. It is not
a structural survey and is limited assistance in determining the cause of damage. The
complainant also provided three photographs, although these again do not assist in
determining the extent of any earthquake-related damage.
A virtual assessment report from the insurer dated 27 September 2021 provides a series of
photographs which confirm there is cracking throughout the home, both internally and
externally. The insurer had an assessor (ARC) attend the property on that day. ARC noted
pre-existing damages internally and externally which in their professional opinion were not
caused by an earthquake event. ARC recommended that a structural engineer attend and
determine the cause of damage.
ARC also arranged for a leak detection and CCTV specialist to attend and inspect the
property to determine if there was a possible escape of liquid event which was contributing to
the damage. There was no observed loss of pressure in the domestic water lines, and a
visual inspection of the subsoil identified no escape of liquid events impacting the property or
contributing to the damages. The CCTV inspection of the sewer system in conjunction with a
visual inspection, revealed no restrictions of flow or points of pipe break that could be
contributing to the event, although there were points of obstructions identified in the below
ground storm water service pipes that could have been contributing to the event.
Determination | Case number: 881995 Page 4 of 6
Structural engineer identifies long-term differential movement cause of the
damage
A structural engineer, (GP) inspected the property on 22 February 2022. GP confirmed that a
5.9 magnitude earthquake was recorded at around 9:15am on 22 September 2021 with an
epicentre located north of R, Victoria, which is approximately 116 kilometres from the
complainant's home.
The Modified Mercalli Intensity (MMI) scale is commonly used to categorise earthquake
damage to building structures. The scale indicates that damage to building and structures
does not generally occur until earthquake intensity reaches MMVI strong according to the
Geosciences Australia website.
The shaking intensity shown in the complainant's area was light. In the opinion of the
engineer, light ground vibrations from an earthquake would not cause the damage to the
building that was observed on their site inspection. GP observed stepped and vertical
cracking in the rendered brickwork at all elevations of the dwelling with signs of dust, grime,
debris intrusion and evidence of prior repair. Internal cracking also presented signs of prior
patching in multiple locations.
GP concluded that the cracking to the internal and external walls of the dwelling does not
appear to be fresh and recent in nature and considered it to be longstanding. I note in
response to this the complainant says that there was no prior damage, but this not consistent
with the structural engineer's findings.
Complainant has not established a valid claim within the terms of the policy
I accept that evidence of previous repairs to the internal and external walls indicates there
has been likely prior movement that pre-dates the earthquake event. GP considered that the
cracking and movement related damage to the house had been caused by footing movement
due to long-term and ongoing foundation soil moisture contents variation within the underlying
reactive clay soil. GP concluded the cause of damage to the house is because of long-term
and ongoing differential foundations movement due to the underlying reactive clay soils.
The information provided by the insurer, in particular from the structural engineer GP, is
persuasive that most likely the damage was not caused by the earthquake on 22 September
2021.
In the absence of any alternative information I am not satisfied that the complainant has
established a valid claim within the terms of the policy.
2.2 Is the insurer entitled to refuse payment of the claim?
Insurer is entitled to refuse payment of the claim
As the complainant has not established a valid claim within the terms of the policy I am
satisfied that the insurer is entitled to refuse payment of the claim.
I am also satisfied that the insurer has established that most likely the damage was caused
due to long-term and ongoing differential foundation movement. The policy specifically
excludes loss or damage caused by, connected with, or arising from ground movement. While
the policy provides a write-back provision for landslide or subsidence in the event of an
earthquake, there is no evidence that the earthquake on 22 September 2021 caused a
landslide or subsidence in the complainant's area.
Determination | Case number: 881995 Page 5 of 6
As I have indicated, I accept that most likely the damage was caused due to differential
footing movement due to the moisture variations in the reactive clay soil. I accept such
damage is excluded under the terms of the policy.
I accept that the insurer is entitled to rely upon the terms and conditions of the policy to refuse
payment of the complainant's claim.
2.3 Why is the outcome fair?
The outcome is fair as there is no dispute that the complainant had received the policy
documents.
The insurer has acted appropriately in arranging for an early assessment of the claim damage
and for the subsequence attendance at the property of a structural engineer. No evidence
has been provided to dispute the findings of the insurer's assessor or structural engineer.
There is no evidence to establish the damage was caused by any other insured event, such
as the escape of liquid.
In the circumstances it is fair that the insurer is entitled to rely upon the terms and conditions
of the policy to refuse payment of the claim.
Determination | Case number: 881995 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.