Cash settlement of accepted claim for damaged retaining walls did not cover cost to bring walls up to current standards

FirmSuncorp Group
Decided2023-08-08
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$51,135
Non-financial loss$500
Amount claimed$51,135
SourceAFCA PDF

Summary

The insurer accepted a strata claim for a damaged retaining wall but offered a cash settlement limited to the damaged portion. AFCA found for the complainant, requiring settlement on his quote plus 10% contingency, interest and $500 non-financial loss.

The retaining wall is a single damaged component, the faulty workmanship exclusion was not shown to apply by reference to standards at construction, so the policy benefit covers upgrade costs.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 881786 Financial firm AAI Limited Determination | Case number: 881786 Page 2 of 6 Case number: 881786 3 August 2023 1 Determination overview 1.1 Complaint The complainant owned a property that was insured under a strata policy issued by the financial firm (insurer). The complainant lodged a claim after a neighbour impacted his retaining wall, causing damage. The insurer accepted the claim. The insurer sought to cash settle the claim as it cannot warrant repairs given the retaining wall is not compliant with current standards. The complainant disputes the insurer’s decision. The main reason is that he says the cash settlement does not reflect the actual cost to repair the claim related damage. 1.2 Issues and key findings Is the insurer’s settlement fair ? No. The insurer is liable for the additional costs to bring the damaged retaining walls up to current standards. This is in line with the policy. Therefore, it should settle the claim based on the complainant’s q uotes along with a 10% contingency and interest. 1.3 Determination This determination is in favour of the complainant. Within 21 days of receiving notice the complainant accepts this determination, the insurer should pay in settlement of this claim:  $51,134.60, minus any applicable outstanding policy deductions (e.g. excess), plus interest as set out in section 2.1  $500 for non-financial loss. Determination | Case number: 881786 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s settlement fair ? Damaged retaining walls are not compliant with current standards There is no dispute the damage is covered by the policy. The damaged area comprises of two retaining walls. One is east facing and the other north. The insurer engaged builders, assessors and an engineer to inspect the damage. The engineer noted the retaining wall is not built to current standards. As a result, the engineer said the builder could not warrant like for like repairs as it would not be compliant with current standards. Given the engineer’s advice, the insurer cash settled the complainant for the costs to repair the damaged portion of the walls only. The insurer said it is not required to rectify faulty workmanship or building defects. The insurer has also cited this exclusion about upgrading undamaged areas to be compliant with current standards: We don’t cover: The costs of: … upgrading undamaged parts, sections or components of the building to comply with the current building regulations and laws; Exclusions for defects of faulty workmanship do not apply There are several iss ues with the insurer’s position. The engineer’s report referred to Australian Standards from 2009. However, the property was built around 1981. This likely included the retaining walls. The engineer did not assess whether the walls were built in accordance with the standards at the time of construction. The fact the wall is not built to current standards does not mean it is defective or there has been faulty workmanship. This is because the exclusion can only reasonably apply by reference to the standards at the time it was built. To say a property is defective, or faultily constructed, because its design or construction methods are now outdated would be unfair. This is because is it not consistent with what a reasonable person in the position of the parties would interpret this exclusion having regard to its context and policy purpose. This interpretation is also consistent with the fact the policy does provide this benefit: When you are covered for the costs of rebuilding or repairing damaged parts of the building, we will pay the reasonable and necessary costs: … to make the damaged building components comply with current home building regulations and laws. We only pay these costs if the building components complied with home building regulations and laws when they were built or when construction, repairs, renovations or alterations were undertaken. Accordingly, I do not accept the insurer has shown the exclusion for defects or faulty workmanship applies. This is because no information has been provided to show the retaining walls were improperly built based on the standards at the time. Determination | Case number: 881786 Page 3 of 6 Retaining walls are one part, section or component of building The main issue is the exclusion for the costs of ‘upgrading damaged parts, sections or components of the build ing’. The insurer says this applies to the areas of the retaining wall that is not damaged. I do not agree. The policy defines component to mean: building element which is manufactured as an independent unit, that can be joined or blended with other elements to form a more complex item (e.g. the roof (sheeting or tiles) is a component, the fire wall within the roof space is another component) Also, on page 58 of the policy, it provides this example of a damaged component: if the roof was damaged due to impact by a falling tree and required repairs, we would repair or rebuild the roof as the damaged component of the building. If other building components within the roof space were not damaged in the incident, they would not be repaired or rebuilt as part of the claim. The example talks about the roof as one item. That is, if the roof was damaged, the whole roof could be replaced if it is required to make it compliant. The example only excludes components within the roof space itself. In this case, I consider it fair the retaining wall that runs across a particular section (such as the east facing wall) be considered as one component. It is consistent with the example cited. It is an independent unit that can be joined or blended with other items. I als o consider the terms ‘part’ and ‘section’ would apply in a similar way in context of the retaining wall. The claim was lodged for a retaining wall. It was constructed as one. No ordinary person would consider it as being made up of separate parts or sections of the building insured. The separate parts or sections arguably apply to the retaining walls adjacent to it, not to the bricks and material of the damaged retaining wall itself. Insurer liable for cost to upgrade damaged retaining walls Given all this, I therefore find the damaged building components in this claim include the east and north facing retaining walls for the purposes of the policy benefit. This means that if the only way to repair the claim related damage is to bring the damaged retaining walls, at least the north one, up to code (which appears to be the case), then the insurer is liable for this cost given the policy benefit. It follows the complainant is entitled to the outcome sought. This is because his contractor is the only one who has prepared an actionable quote that would repair the claim related damage and is in line with the policy. This means the insurer should settle this claim based on his quote of $46,486. A 10% contingency should be included to factor in unforeseen variations given the works would be subject to engineering design and structural requirements. This brings the total to $51,134.60 minus any outstanding policy deductions (e.g. excess). Determination | Case number: 881786 Page 4 of 6 Interest should also apply to this amount pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest applies from 21 December 2021, being one month after this contractor issued the quote, until payment is made. Determination | Case number: 881786 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Non-financial loss Fair for insurer to pay $500 AFCA issued a preliminary assessment awarding $500 compensation to the complainant for non-financial loss. The insurer accepted the preliminary assessment. Whilst the complainant rejected the preliminary assessment, his submissions were only focussed on the claim outcome. No rejection, or submission, was raised on this aspect of the preliminary assessment. There is no dispute there were delays in the insurer’s handling of the claim and some form of compensation was appropriate. Given the parties either agree, or have not specifically objected, to the findings or amount sought, I consider it fair to endorse this as being fair in all the circumstances.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.