Home / Suncorp Group / Determination 881786
Determination 881786
Cash settlement of accepted claim for damaged retaining walls did not cover cost to bring walls up to current standards
Summary
The insurer accepted a strata claim for a damaged retaining wall but offered a cash settlement limited to the damaged portion. AFCA found for the complainant, requiring settlement on his quote plus 10% contingency, interest and $500 non-financial loss.
The retaining wall is a single damaged component, the faulty workmanship exclusion was not shown to apply by reference to standards at construction, so the policy benefit covers upgrade costs.
Issues
- Claim amount dispute primary · upheld
“The insurer is liable for the additional costs to bring the damaged retaining walls up to current standards.”
- Delay secondary · upheld
“There is no dispute there were delays in the insurer's handling of the claim and some form of compensation was appropriate.”
- Product terms interpretation secondary · upheld
“retaining wall that runs across a particular section be considered as one component; defect/faulty workmanship exclusion not shown to apply”
Subjects and remedies
home or building damagepay claimpay interestpay non financial loss
Text of the determination
Determination
Case number 881786
Financial firm AAI Limited
Determination | Case number: 881786 Page 2 of 6
Case number: 881786 3 August 2023
1 Determination overview
1.1 Complaint
The complainant owned a property that was insured under a strata policy issued by the
financial firm (insurer). The complainant lodged a claim after a neighbour impacted his
retaining wall, causing damage.
The insurer accepted the claim. The insurer sought to cash settle the claim as it cannot
warrant repairs given the retaining wall is not compliant with current standards.
The complainant disputes the insurer’s decision. The main reason is that he says the cash
settlement does not reflect the actual cost to repair the claim related damage.
1.2 Issues and key findings
Is the insurer’s settlement fair ?
No. The insurer is liable for the additional costs to bring the damaged retaining walls up to
current standards. This is in line with the policy. Therefore, it should settle the claim based on
the complainant’s q uotes along with a 10% contingency and interest.
1.3 Determination
This determination is in favour of the complainant.
Within 21 days of receiving notice the complainant accepts this determination, the insurer
should pay in settlement of this claim:
$51,134.60, minus any applicable outstanding policy deductions (e.g. excess), plus
interest as set out in section 2.1
$500 for non-financial loss.
Determination | Case number: 881786 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer’s settlement fair ?
Damaged retaining walls are not compliant with current standards
There is no dispute the damage is covered by the policy. The damaged area comprises of
two retaining walls. One is east facing and the other north.
The insurer engaged builders, assessors and an engineer to inspect the damage. The
engineer noted the retaining wall is not built to current standards. As a result, the engineer
said the builder could not warrant like for like repairs as it would not be compliant with current
standards.
Given the engineer’s advice, the insurer cash settled the complainant for the costs to repair
the damaged portion of the walls only. The insurer said it is not required to rectify faulty
workmanship or building defects. The insurer has also cited this exclusion about upgrading
undamaged areas to be compliant with current standards:
We don’t cover: The costs of: … upgrading undamaged parts, sections or
components of the building to comply with the current building regulations and
laws;
Exclusions for defects of faulty workmanship do not apply
There are several iss ues with the insurer’s position.
The engineer’s report referred to Australian Standards from 2009. However, the property was
built around 1981. This likely included the retaining walls. The engineer did not assess
whether the walls were built in accordance with the standards at the time of construction.
The fact the wall is not built to current standards does not mean it is defective or there has
been faulty workmanship. This is because the exclusion can only reasonably apply by
reference to the standards at the time it was built. To say a property is defective, or faultily
constructed, because its design or construction methods are now outdated would be unfair.
This is because is it not consistent with what a reasonable person in the position of the
parties would interpret this exclusion having regard to its context and policy purpose.
This interpretation is also consistent with the fact the policy does provide this benefit:
When you are covered for the costs of rebuilding or repairing damaged parts of
the building, we will pay the reasonable and necessary costs: … to make the
damaged building components comply with current home building regulations and
laws. We only pay these costs if the building components complied with home
building regulations and laws when they were built or when construction, repairs,
renovations or alterations were undertaken.
Accordingly, I do not accept the insurer has shown the exclusion for defects or faulty
workmanship applies. This is because no information has been provided to show the retaining
walls were improperly built based on the standards at the time.
Determination | Case number: 881786 Page 3 of 6
Retaining walls are one part, section or component of building
The main issue is the exclusion for the costs of ‘upgrading damaged parts, sections or
components of the build ing’. The insurer says this applies to the areas of the retaining wall
that is not damaged.
I do not agree.
The policy defines component to mean:
building element which is manufactured as an independent unit, that can be
joined or blended with other elements to form a more complex item (e.g. the roof
(sheeting or tiles) is a component, the fire wall within the roof space is another
component)
Also, on page 58 of the policy, it provides this example of a damaged component:
if the roof was damaged due to impact by a falling tree and required repairs, we
would repair or rebuild the roof as the damaged component of the building. If
other building components within the roof space were not damaged in the
incident, they would not be repaired or rebuilt as part of the claim.
The example talks about the roof as one item. That is, if the roof was damaged, the whole
roof could be replaced if it is required to make it compliant. The example only excludes
components within the roof space itself.
In this case, I consider it fair the retaining wall that runs across a particular section (such as
the east facing wall) be considered as one component. It is consistent with the example cited.
It is an independent unit that can be joined or blended with other items.
I als o consider the terms ‘part’ and ‘section’ would apply in a similar way in context of the
retaining wall. The claim was lodged for a retaining wall. It was constructed as one. No
ordinary person would consider it as being made up of separate parts or sections of the
building insured. The separate parts or sections arguably apply to the retaining walls adjacent
to it, not to the bricks and material of the damaged retaining wall itself.
Insurer liable for cost to upgrade damaged retaining walls
Given all this, I therefore find the damaged building components in this claim include the east
and north facing retaining walls for the purposes of the policy benefit.
This means that if the only way to repair the claim related damage is to bring the damaged
retaining walls, at least the north one, up to code (which appears to be the case), then the
insurer is liable for this cost given the policy benefit.
It follows the complainant is entitled to the outcome sought. This is because his contractor is
the only one who has prepared an actionable quote that would repair the claim related
damage and is in line with the policy.
This means the insurer should settle this claim based on his quote of $46,486. A 10%
contingency should be included to factor in unforeseen variations given the works would be
subject to engineering design and structural requirements. This brings the total to $51,134.60
minus any outstanding policy deductions (e.g. excess).
Determination | Case number: 881786 Page 4 of 6
Interest should also apply to this amount pursuant to section 57 of the Insurance Contracts
Act 1984 (the Act). Interest applies from 21 December 2021, being one month after this
contractor issued the quote, until payment is made.
Determination | Case number: 881786 Page 5 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Non-financial loss
Fair for insurer to pay $500
AFCA issued a preliminary assessment awarding $500 compensation to the complainant for
non-financial loss.
The insurer accepted the preliminary assessment. Whilst the complainant rejected the
preliminary assessment, his submissions were only focussed on the claim outcome. No
rejection, or submission, was raised on this aspect of the preliminary assessment.
There is no dispute there were delays in the insurer’s handling of the claim and some form of
compensation was appropriate. Given the parties either agree, or have not specifically
objected, to the findings or amount sought, I consider it fair to endorse this as being fair in all
the circumstances.