Home / Suncorp Group / Determination 881658
Determination 881658
Claim handling delays and settlement of storm damage claim
Summary
The complainant sought finalisation of a storm-damage home and contents claim and non-financial loss compensation for delays. AFCA found the insurer could not cap strip-out costs and set a 20% contingency, ordering settlement of building repairs at $223,395.30 and a final contents inspection, but declined non-financial loss.
The insurer's 10% removal-of-debris cap did not apply to strip out because the works were removal and replacement, not demolition; delays were attributed to catastrophe and industry conditions rather than unreasonable handling.
Issues
- Claim amount dispute primary · upheld
“The insurer is not entitled to cap its liability for the strip out in the manner it has; contingency of 20% considered fair.”
- Poor claim handling secondary · not upheld
“Insurer has been interacting regularly and consistently on the claim; not persuaded it handled the claim unreasonably.”
- Delay secondary · not upheld
“The available information does not show the insurer handled the claim unreasonably; delays attributed to catastrophe and industry shortages.”
Subjects and remedies
home or building damagenatural disasterpay claimprovide documents
Text of the determination
Determination
Case number 881658
Financial firm AAI Limited
Determination | Case number: 881658 Page 2 of 6
Case number: 881658 22 December 2022
1 Determination overview
1.1 Complaint
The complainant held a home and contents policy with the financial firm (insurer). The
complainant lodged a claim after her home and contents suffered damage following the
southeast Queensland rain event on 25 February 2022.
The insurer accepted the claim. During the course of the claim, delays were experienced in
sourcing contractors, identifying the extent of damage caused by the claim and undertaking
repairs.
Due to the complainant being dissatisfied with the progress of the claim, she lodged an AFCA
complaint to expedite the process. She is now seeking to finalise the claim and wants
compensation for non-financial loss.
1.2 Issues and key findings
How should the claim be finalised?
It is fair the claim be finalised in the manner set out in section 2.1.
Should the insurer pay non-financial loss?
No. The available information does not show the insurer handled the claim unreasonably.
1.3 Determination
This determination is in favour of the insurer.
The claim should be settled in the manner set out in section 2.1.
Determination | Case number: 881658 Page 3 of 6
2 Reasons for determination
2.1 How should the claim be finalised?
Complainant seeking a determination
In an email dated 28 November 2022, the insurer has offered $191,307.77 for the building
repairs. In a later email dated 30 November 2022, the insurer offered $28,474.96 for contents.
This includes $12,9775 for cleaning costs combined with $15,497.71 for non-restorable items.
The complainant disputes this is fair. She noted there was about an $8,000 reduction on the
asbestos strip out costs and the building costs were reduced by about $55,000. She
considers a higher contingency should be allowed.
For the contents, she accepts the dry cleaning costs. However, she disputes the non-
salvageable list. She has provided photos of further contamination and notes the insurer’s
offer does not include missing jewellery items.
I note the complainant has refused any further inspections. This is because she says the
insurer has done numerous assessments, she has been very stressed by this experience,
she wants to focus on her daughter ’s h ealth and is looking to enforce her needs.
Insurer is to pay $223,395.30 in full and final settlement for the building
The insurer’s offer for the building repairs is based on scope of works for the strip out, mould
remediation and repairs.
For the strip out, the insurer has capped this at 10% of the sum insured. This is presumably
based on the ‘Removal of debris’ section. That contains a 10% cap where the insurer has to
pay the reasonable and necessary costs of ‘demolishing and removing the damaged parts of
the home from the insured address’.
I am not persuaded the insurer has shown it can cap its liability in this manner. The benefit
talks about both ‘demolishing and removing the damaged parts’. The house is not being
demolished in any way. The insurer is instead removing and replacing damaged parts. I do
not accept stripping, or removing, parts is synonymous with ‘demolishing and removing the
damaged parts of the home’.
Instead, demolishing is typically associated when destroying parts of the home (e.g. a room
or the full house). That is not happening here.
Therefore, the insurer is not entitled to cap its liability for the strip out in the manner it has.
On the other aspects, there is no evidence to show the scope of works is either incomplete or
the rates allowed are unfair. Whilst the complainant noted there was a $55,000 difference in
the insurer’s initial building quote and its subsequent quote, this is because the initial building
quote included the strip out costs. The later offer separated these costs out.
The insurer has also allowed a 10% contingency. I note the complainant has advocated for
25%. This is high. However, I also recognise there is a level of uncertainty in the works. It is
possible the mould remediation could be more complicated. The extent of works are fairly
substantive. It involves removing and reinstating various items. If those items are damaged in
that process, then a variation would be needed.
Given all this, I consider a contingency of 20% to be fair.
Determination | Case number: 881658 Page 4 of 6
Therefore, I accept it is fair in all the circumstances the insurer settles the building repairs for
$223,395.30 minus any applicable policy deductions.
Contents to be settled in this way
For the contents offer, the complainant has noted the insurer has not considered the
additional damages she found and the missing jewellery items. The insurer had wanted to
undertake an inspection. The complainant did not agree to this.
I acknowledge the complainant has had a difficult experience given her circumstances and
this claim. I also note the insurer has done numerous inspections and assessments.
However, this claim has continued to evolve as the insurer has done various works and the
complainant has raised other concerns. For instance, for the contents, additional damages
had been found which the insurer wants to review. The insurer wants to inspect these
contents to enable it to finalise its assessment.
This is fair. This is because the insurer cannot fairly assess these contents without being able
to inspect the additional damage the complainant is claiming.
Given this, I consider it is fair in all the circumstances for the insurer to do one final inspection
for the contents before making a final settlement offer.
In line with this, the parties should do the following once the insurer is notified the
complainant accepts this determination:
arrange a final inspection that is mutually suitable – ideally, this should be within 14 days
of the insurer receiving notice but I acknowledge the complainant has to prioritise her
children’s health so some flexibility is allowed on this
once the final inspection is done, the insurer must provide its final settlement offer within
14 days.
If the parties are unable to agree on the payout figure for the contents, the complainant is
able to lodge a new AFCA complaint on this point.
2.2 Should the insurer pay non-financial loss?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer not required to pay non-financial loss
The complainant has clearly been impacted by her claims experience. There is also no
dispute she has to deal with a number of difficult issues.
I also acknowledge the claims experience has impacted the complainant. However, I am not
persuaded the insurer has handled the claim unreasonably.
There is no dispute that the complainant’s loss followed a significant event that was
categorised as a catastrophe by the Insurance Council of Australia (ICA). This has markedly
Determination | Case number: 881658 Page 5 of 6
impacted the industry. This came on top of a pre-existing shortage of trades and materials in
the building industry as well as the after effects of Covid-19. This has, unsurprisingly, resulted
in claims being delayed and prolonged.
The insurer has provided its claim notes. These include almost 400 pages of claim notes
evidencing their interactions on the claim in the last nine months. This showed it has been
interacting regularly, and consistently, on the claim. I also note it has attempted to address
the complainant’s queries when possible and been responsive.
I acknowledge the complainant has been distressed by the claims experience. However, the
available information shows the likely cause has been the pre-existing issues she has to deal
with, the claim experience itself and the shortage of trades and materials in the building
industry. I am not persuaded her experience has been caused by the insurer handling her
claim unreasonably.
Given this, I am not persuaded there is sufficient basis to award non-financial loss.
Determination | Case number: 881658 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.