Determination 881360
Claim declined under latent defect exclusion after balustrade collapsed in storm; delay in decision
Summary
A unit owner's claim for storm-related balcony balustrade collapse was declined by the strata insurer under a latent defect exclusion. AFCA found the balustrade failure excluded but required the insurer to cover impact damage to the glass panel, deck and flyscreen door with interest, plus $500 for delay.
Engineering evidence showed defective design and construction was the dominant cause so the latent defect exclusion applied, but impact damage fell within the exception, and the insurer's delay was unreasonable.
Issues
- Claim denial primary · upheld
“Insurer entitled to decline balustrade failure damage but not damage caused by impact from the falling balustrade; declined whole claim although part covered.”
- Delay secondary · upheld
“Claim decision should have been made by 17 February 2022 and any delays after this were unreasonable.”
- Product terms interpretation secondary · upheld
“Latent defect exclusion applied to balustrade failure, but exception for damage from another claimable event covered impact damage.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestpay non financial loss
Text of the determination
Determination
Case number 881360
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 881360 Page 2 of 9
Case number: 881360 17 April 2023
1 Determination overview
1.1 Complaint
The complainant is the owner of a unit insured under a strata insurance policy administered
by the financial firm on behalf of the relevant insurer. For easy reference, the financial firm will
be referred to as „ insurer ‟ in this determination.
The complainant made a claim for damage to his unit after its balcony balustrade collapsed
during a storm on 29 October 2021.
The insurer denied the claim saying it is excluded. It says the balustrade would not have
collapsed if it was designed and built according to the applicable building standards.
The complainant maintains the balustrade collapsed because of the storm. He also says the
insurer unreasonably delayed his claim. He wants the insurer to pay:
$13,750.50 to replace the balcony‟s balustrade , the balcony ‟s tiles, damaged decking
timber and a damaged flyscreen sliding door
compensation for the delay and for causing him stress and inconvenience.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Partly. The insurer is entitled to decline damage arising from the balustrade‟s failure because:
the balustrade failed due to a latent defect in its design and build
the policy excludes loss or damage arising from a latent defect.
The insurer is not entitled to decline damage caused by impact from the falling balustrade.
This is because such damage falls within the policy‟s exception to the latent defect exclusion.
Why is the outcome fair?
The insurer declined the whole claim although part of it was covered. It also unreasonably
delayed the claim, which caused the complainant unusual delay and interference. Given this,
it is fair the insurer accepts the covered part of the claim with interest and pays the
complainant some compensation for his poor claims experience.
1.3 Determination
This determination is partly in favour of the complainant.
Within 14 days of being notified of the complainant‟s acceptance of this determination, t he
insurer must:
settle the claims for the unit‟s damaged balustrade glass panel, deck and flyscreen door
according to the policy terms with interest, as outlined in section 2.1 of this determination
pay the complainant $500 as compensation for non-financial loss.
Save of the above, the insurer is not required to take any further action in relation to the claim
or the complaint.
Determination | Case number: 881360 Page 3 of 9
Determination | Case number: 881360 Page 4 of 9
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Partly. The insurer is entitled to decline damage arising from the balustrade‟s failure because:
the balustrade failed due to a latent defect in its design and build
the policy excludes loss or damage arising from a latent defect.
The insurer is not entitled to decline damage caused by impact from the falling balustrade.
This is because such damage falls within the policy‟s exception to the latent defect exclusion .
Complainant must establish a claim covered by the policy at first instance
The complainant has an initial onus to establish a claim covered by the policy at first instance.
Once established, the onus is then on the insurer to prove an exclusion or limitation applies if
it seeks to deny or limit its liability for the loss.
Insurer must prove an exclusion applies to decline claim
The relevant policy extracts about the complainant‟s claim are set out in section 3.2 of this
determination. In summary, t he policy covers the complainant‟s uni t for physical loss or
damage from any sudden and accidental cause that is not otherwise excluded by the policy.
Bureau of Meteorology records indicate the unit‟s location likely faced a storm with maximum
wind gusts of 115kmh on 29 October 2021. There is no dispute the unit‟s balcony balus trade
collapsed during the storm, and this was a sudden and accidental event. A claim under the
policy is established, so the insurer must prove an exclusion applies to decline it.
Insurer says balustrade ’ s collapse was due to defective design and build
The insurer says the claim is excluded by exclusions 1(c)(i) and (ii) and exclusion 2(b) of the
policy. It says the balustrade should withstand windspeeds of 140kmh or 1.35kN of force
being applied to it if it was properly designed and built. Since it failed and collapsed in
windspeeds and force that were less than this, it was defectively designed and built.
The insurer relies on its engineer‟s (IF) opinion to support its position on these matters.
Complainant maintains st orm caused balustrade’s collapse
The complainant says the balcony‟s balustrade was installed correctly, was „signed off‟ by the
builder and building surveyor and has performed without issue for 10 years. He maintains the
storm caused its collapse and relies on the unit builder ‟s (BV) report to support his position.
Complainant’s entitlement to cover depends on the dominant cause of loss
The complainant‟s entitlement to cover is dependent on whether storm or poor design and
construction was the proximate cau se of the balustrade‟s failure.
The proximate cause of a loss is not necessarily the first, last or sole cause of a loss. It is the
effective, dominant or operative cause of the loss. If there are several causes operating at the
same time, AFCA will consider each to determine which cause set the train of events in
motion. Courts have said if one cause would have resulted in the harm in any case and the
other would not have done so in the absence of the first, then the first is the proximate cause.
Determination | Case number: 881360 Page 5 of 9
Engineering evidence shows collapse was due to poor construction
While I accept wind was the immediate cause of the balustrade ‟ s collapse on 29 October
2021, I am not satisfied it was the proximate or dominant cause of its collapse.
Engineer IF has provided detailed and persuasive explanations why the storm was unlikely
the dominant cause of the balustrade‟s collapse. His opinion is supported by the relevant
Australian Standard, weather information, photos, and detailed engineering information and
calculations about the windspeeds and load forces the balustrade:
was meant to have been designed and built to cope with (i.e. 140kmh and 1.35kN)
likely faced on 29 October 2021 (i.e. 115kmh and 1kN).
IF says the balustrade was only secured by screw fixings into the balcony‟s timber base. It
was not secured to the unit‟s wall at one end and was inadequately secured to the corner
post at the other end. He says the fixing screws had pulled out from the timber base because
the balustrade‟s top rail (i.e. handrail) lacked enough lateral restraint for further support.
IF explained the „design wind speed‟ for the unit‟s location was 140kmh, while Australian
Standard AS1170 required the balustrade to be designed to withstand 1.35kN of force being
applied to any point along its handrail. The balustrade did not meet these requirements as it
failed and collapsed:
with less than 1.35kN of force being applied to it (i.e. 1kN)
in windspeeds that were less than 140kmh (i.e. 115kmh).
IF further explained the screw fixings at the base of the balustrade cannot withstand 1.35kN
of force on their own. He says 1.35kN of force applied at one metre above the balustrade‟s
base would exert about 45kN of „tension force‟ into the bolt group, which only has an „ultimate
tension capacity‟ of approximately 30kN. Given this, the balustrade‟s top rail (i.e. handrail)
required lateral restraint to provide further support.
Considering IF‟s explanations, I accept the balcony‟s balustrade would unlikely have
collapsed during the October 2021 storm event if it was designed and built to cope with the
expected windspeed and force loads he identified. I also accept the balustrade‟s top rail (i.e.
handrail) needed lateral restraint to provide the structure with added support.
BV’s report does not establish balustrade was properly designed or built
I acknowledge BV says he recalls installing the balustrade accor ding to „approved
documentation‟ prepared by the unit‟s building surveyor. I also acknowledge he says the
relevant surveyor inspected the balustrade before issuing an occupancy certificate.
While these matters might have occurred, I am not satisfied they necessarily mean the
balustrade was adequately designed and built.
BV and the complainant have not provided any information to show the load requirements
identified by IF were incorrect or inapplicable when the unit was built in 2011. Nor have they
shown the balustrade was designed and built to meet these requirements.
BV and the complainant have not also supplied the „approved documentation‟ BV referred to,
so it is unclear if such requirements were considered in the balustrade‟s design plan to start
with. If the design plan failed to account for such requirements, the balustrade would
invariably have been defectively built if BV followed the „approved documentation‟.
I am not satisfied BV‟s report persuasively rebuts IF‟s opinion and explanations about the
dominant cause of balustrade‟s failure. Ultimately, there is no contrary engineer ‟s opinion
before me that persuasively challenges IF‟s opinion on the matter.
Determination | Case number: 881360 Page 6 of 9
Defective design and construction was proximate cause of balustrade’s failure
Considering these matters, I am not satisfied the October 2021 storm was the dominant
cause of the balustrade ‟s collapse. On balance, I am satisfied the balustrade would unlikely
have failed during the storm if it:
was designed and built to meet the expected load requirements identified by IF
had sufficient lateral restraint to its top rail (i.e. handrail), as also identified by IF.
Insurer has established claim for failed balustrade is excluded
The policy excludes loss or damage caused by a latent defect. It also excludes the cost of
rectifying faulty or defective workmanship.
The policy does not define „latent‟ defect. The Macquarie Dictionary says it can mean a fault
or imperfection that is „present, but not visible or apparent‟.
Although the lack of lateral restraint for the balustrade‟s top rail (i.e. handrail) was visible, I
consider this fault would unlikely be „apparent‟ to pe rsons who are unfamiliar with construction
or building standards. They are unlikely to know a balcony balustrade must withstand 140kmh
winds or 1.35kN of force by design, so its handrail needed lateral restraint for added support.
Given this, I accept the identified fault was a latent defect for the purposes of the relevant
exclusion, and the exclusion applies in the circumstances.
It follows the insurer has established that the balustrade ‟s failure is excluded from cover. This
extends to its damaged screw fixings, damage caused to the balcony ‟s base by the
balustrade giving way, the required re-waterproofing and re-tiling of the balcony floor, and the
reinstatement of the balustrade.
Exception to latent defect exclusion does not apply to balustrade’s failure
Exclusion 1(c) (which includes the latent defect exclusion) is subject to the following
exception, which I have considered for the sake of completeness:
However We will pay if any of these causes directly results in Loss or Damage
from any other Event claimable under Section 1 such as fire or glass breakage.
I am not satisfied the exception applies to the matters identified above. This is because the
dominant cause of such loss and damage was the balustrade‟s defective design and build. It
was not the storm or „any other Event claimable‟ under section 1 of the policy.
Exception to exclusion only applies to damage caused by falling balustrade
I am satisfied the exception only responds to damage caused by the balustrade ‟s fall .
Damage caused by impact from the falling balustrade would constitute „ Loss or Damage from
any other Event claimable‟ under section 1 of the policy . It was a different sudden and
accidental event that damaged insured property in conjunction with the balustrade‟s defective
design and build. Such damage meets the requirements for the exception to apply.
Insurer is required to accept damage caused by falling balustrade
The supplied photos show the balustrade fell outwards, with a portion of it falling onto the
unit‟s timber deck on the ground floor. This damaged a balustrade glass panel, the deck and
a nearby flyscreen door.
Determination | Case number: 881360 Page 7 of 9
The complainant‟s builder quoted $1,625 plus GST to repair the damaged deck and flyscreen
door. The insurer has not given any quote for these items. Given this, I am satisfied the
insurer must cover the cost quoted by the complainant‟s builder .
The builder‟s $6,340 plus GST quote for the balcony balustrade appears to cover its entire
replacement. I am not satisfied the insurer is required to cover this. It is only required to cover
the glass panel that broke. Given this, the insurer is to assess and include the cost of
replacing this glass panel to the settlement payable.
Insurer must also pay interest and some compensation for non-financial loss
The insurer must also pay interest on the compensation payable under section 57 of the
Insurance Contracts Act 1984 (the Act) and some compensation for non-financial loss.
The exchanged information shows the insurer‟s claim decision was made around mid to late
April 2022, almost six months after lodgement. Some delay arose because the insurer‟s
originally appointed engineer fell ill, and it needed to appoint IF. However, most of the delays
were due to a wait for the assessor and engineer‟s reports.
I acknowledge the insurer says the General Insurance Code of Practice allows up to 12
weeks for an expert report to be provided. However, I do not accept this means an expert can
utilise the full period to provide a report when there is no good reason to do so.
The exchanged information shows IF issued his report on 22 February 2022, some two
months after his 23 December 2021 inspection. No explanation was given why the report
could not have been completed earlier. No explanation was also given why the assessor
needed about a month to review IF‟s report and then provide its own report.
Although the Insurance Council of Australia characterised the October 2021 storm a
catastrophe e vent, the insurer has not suggested or shown this hampered its experts‟ ability
to promptly complete their reports. There is nothing in the insurer‟s claim notes or
communications that suggests this.
Without reasonable explanation for the above delays, and allowing for year-end holidays, I
consider eight weeks from 23 December 2021 to be fair and adequate time for the insurer to
complete its assessment and decide the claim. Given this, I consider its claim decision should
have been made by 17 February 2022 and any delays after this were unreasonable.
Considering these matters, I am satisfied it is fair the insurer pays:
interest on the covered repair costs on and from 18 February 2022 until the claim is paid
the complainant $500 for the unusual delays and inconvenience he has experienced.
Determination | Case number: 881360 Page 8 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy wordings
General definitions – the meaning of some words
…
Event(s)
means a happening or an incident not intended to happen that occurs during a
particular interval of time, or a series of happenings or incidents consequent upon
or attributable thereto, which causes or results in Loss or Damage or a legal
liability to pay compensation which is claimable under this Policy.
…
Loss or Damage
means direct physical loss of, destruction of, or damage to property from any
sudden and accidental cause not otherwise excluded by the policy.
…
Section 1 – Part A
You are covered for the following Events.
1. We will pay up to the Sum Insured shown on the Schedule for Section 1,
against Loss or Damage to Your Insured Property on the basis set out in
“Claims – basis of settlement”…
…
Exclusions – what We do not cover under Parts A, B and C
1. We will not pay for Loss or Damage:
…
Determination | Case number: 881360 Page 9 of 9
(c) (i) caused by … gradual corrosion or deterioration … inherent vice or
latent defect, … ;
(ii) caused by Wear, Tear, … gradual deterioration or developing
flaws;
However We will pay if any of these causes directly results in Loss or
Damage from any other Event claimable under Section 1 such as fire or
glass breakage.
…
2. We will not pay for:
…
(b) the cost of rectifying faulty or defective materials or faulty or defective
workmanship;