Home / Strata Community Insurance Agencies Pty Ltd / Determination 881360

Determination 881360

Claim declined under latent defect exclusion after balustrade collapsed in storm; delay in decision

FirmStrata Community Insurance Agencies Pty Ltd
Decided2023-04-27
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed$13,751
SourceAFCA PDF

Summary

A unit owner's claim for storm-related balcony balustrade collapse was declined by the strata insurer under a latent defect exclusion. AFCA found the balustrade failure excluded but required the insurer to cover impact damage to the glass panel, deck and flyscreen door with interest, plus $500 for delay.

Engineering evidence showed defective design and construction was the dominant cause so the latent defect exclusion applied, but impact damage fell within the exception, and the insurer's delay was unreasonable.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 881360 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 881360 Page 2 of 9 Case number: 881360 17 April 2023 1 Determination overview 1.1 Complaint The complainant is the owner of a unit insured under a strata insurance policy administered by the financial firm on behalf of the relevant insurer. For easy reference, the financial firm will be referred to as „ insurer ‟ in this determination. The complainant made a claim for damage to his unit after its balcony balustrade collapsed during a storm on 29 October 2021. The insurer denied the claim saying it is excluded. It says the balustrade would not have collapsed if it was designed and built according to the applicable building standards. The complainant maintains the balustrade collapsed because of the storm. He also says the insurer unreasonably delayed his claim. He wants the insurer to pay:  $13,750.50 to replace the balcony‟s balustrade , the balcony ‟s tiles, damaged decking timber and a damaged flyscreen sliding door  compensation for the delay and for causing him stress and inconvenience. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Partly. The insurer is entitled to decline damage arising from the balustrade‟s failure because:  the balustrade failed due to a latent defect in its design and build  the policy excludes loss or damage arising from a latent defect. The insurer is not entitled to decline damage caused by impact from the falling balustrade. This is because such damage falls within the policy‟s exception to the latent defect exclusion. Why is the outcome fair? The insurer declined the whole claim although part of it was covered. It also unreasonably delayed the claim, which caused the complainant unusual delay and interference. Given this, it is fair the insurer accepts the covered part of the claim with interest and pays the complainant some compensation for his poor claims experience. 1.3 Determination This determination is partly in favour of the complainant. Within 14 days of being notified of the complainant‟s acceptance of this determination, t he insurer must:  settle the claims for the unit‟s damaged balustrade glass panel, deck and flyscreen door according to the policy terms with interest, as outlined in section 2.1 of this determination  pay the complainant $500 as compensation for non-financial loss. Save of the above, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 881360 Page 3 of 9 Determination | Case number: 881360 Page 4 of 9 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Partly. The insurer is entitled to decline damage arising from the balustrade‟s failure because:  the balustrade failed due to a latent defect in its design and build  the policy excludes loss or damage arising from a latent defect. The insurer is not entitled to decline damage caused by impact from the falling balustrade. This is because such damage falls within the policy‟s exception to the latent defect exclusion . Complainant must establish a claim covered by the policy at first instance The complainant has an initial onus to establish a claim covered by the policy at first instance. Once established, the onus is then on the insurer to prove an exclusion or limitation applies if it seeks to deny or limit its liability for the loss. Insurer must prove an exclusion applies to decline claim The relevant policy extracts about the complainant‟s claim are set out in section 3.2 of this determination. In summary, t he policy covers the complainant‟s uni t for physical loss or damage from any sudden and accidental cause that is not otherwise excluded by the policy. Bureau of Meteorology records indicate the unit‟s location likely faced a storm with maximum wind gusts of 115kmh on 29 October 2021. There is no dispute the unit‟s balcony balus trade collapsed during the storm, and this was a sudden and accidental event. A claim under the policy is established, so the insurer must prove an exclusion applies to decline it. Insurer says balustrade ’ s collapse was due to defective design and build The insurer says the claim is excluded by exclusions 1(c)(i) and (ii) and exclusion 2(b) of the policy. It says the balustrade should withstand windspeeds of 140kmh or 1.35kN of force being applied to it if it was properly designed and built. Since it failed and collapsed in windspeeds and force that were less than this, it was defectively designed and built. The insurer relies on its engineer‟s (IF) opinion to support its position on these matters. Complainant maintains st orm caused balustrade’s collapse The complainant says the balcony‟s balustrade was installed correctly, was „signed off‟ by the builder and building surveyor and has performed without issue for 10 years. He maintains the storm caused its collapse and relies on the unit builder ‟s (BV) report to support his position. Complainant’s entitlement to cover depends on the dominant cause of loss The complainant‟s entitlement to cover is dependent on whether storm or poor design and construction was the proximate cau se of the balustrade‟s failure. The proximate cause of a loss is not necessarily the first, last or sole cause of a loss. It is the effective, dominant or operative cause of the loss. If there are several causes operating at the same time, AFCA will consider each to determine which cause set the train of events in motion. Courts have said if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Determination | Case number: 881360 Page 5 of 9 Engineering evidence shows collapse was due to poor construction While I accept wind was the immediate cause of the balustrade ‟ s collapse on 29 October 2021, I am not satisfied it was the proximate or dominant cause of its collapse. Engineer IF has provided detailed and persuasive explanations why the storm was unlikely the dominant cause of the balustrade‟s collapse. His opinion is supported by the relevant Australian Standard, weather information, photos, and detailed engineering information and calculations about the windspeeds and load forces the balustrade:  was meant to have been designed and built to cope with (i.e. 140kmh and 1.35kN)  likely faced on 29 October 2021 (i.e. 115kmh and 1kN). IF says the balustrade was only secured by screw fixings into the balcony‟s timber base. It was not secured to the unit‟s wall at one end and was inadequately secured to the corner post at the other end. He says the fixing screws had pulled out from the timber base because the balustrade‟s top rail (i.e. handrail) lacked enough lateral restraint for further support. IF explained the „design wind speed‟ for the unit‟s location was 140kmh, while Australian Standard AS1170 required the balustrade to be designed to withstand 1.35kN of force being applied to any point along its handrail. The balustrade did not meet these requirements as it failed and collapsed:  with less than 1.35kN of force being applied to it (i.e. 1kN)  in windspeeds that were less than 140kmh (i.e. 115kmh). IF further explained the screw fixings at the base of the balustrade cannot withstand 1.35kN of force on their own. He says 1.35kN of force applied at one metre above the balustrade‟s base would exert about 45kN of „tension force‟ into the bolt group, which only has an „ultimate tension capacity‟ of approximately 30kN. Given this, the balustrade‟s top rail (i.e. handrail) required lateral restraint to provide further support. Considering IF‟s explanations, I accept the balcony‟s balustrade would unlikely have collapsed during the October 2021 storm event if it was designed and built to cope with the expected windspeed and force loads he identified. I also accept the balustrade‟s top rail (i.e. handrail) needed lateral restraint to provide the structure with added support. BV’s report does not establish balustrade was properly designed or built I acknowledge BV says he recalls installing the balustrade accor ding to „approved documentation‟ prepared by the unit‟s building surveyor. I also acknowledge he says the relevant surveyor inspected the balustrade before issuing an occupancy certificate. While these matters might have occurred, I am not satisfied they necessarily mean the balustrade was adequately designed and built. BV and the complainant have not provided any information to show the load requirements identified by IF were incorrect or inapplicable when the unit was built in 2011. Nor have they shown the balustrade was designed and built to meet these requirements. BV and the complainant have not also supplied the „approved documentation‟ BV referred to, so it is unclear if such requirements were considered in the balustrade‟s design plan to start with. If the design plan failed to account for such requirements, the balustrade would invariably have been defectively built if BV followed the „approved documentation‟. I am not satisfied BV‟s report persuasively rebuts IF‟s opinion and explanations about the dominant cause of balustrade‟s failure. Ultimately, there is no contrary engineer ‟s opinion before me that persuasively challenges IF‟s opinion on the matter. Determination | Case number: 881360 Page 6 of 9 Defective design and construction was proximate cause of balustrade’s failure Considering these matters, I am not satisfied the October 2021 storm was the dominant cause of the balustrade ‟s collapse. On balance, I am satisfied the balustrade would unlikely have failed during the storm if it:  was designed and built to meet the expected load requirements identified by IF  had sufficient lateral restraint to its top rail (i.e. handrail), as also identified by IF. Insurer has established claim for failed balustrade is excluded The policy excludes loss or damage caused by a latent defect. It also excludes the cost of rectifying faulty or defective workmanship. The policy does not define „latent‟ defect. The Macquarie Dictionary says it can mean a fault or imperfection that is „present, but not visible or apparent‟. Although the lack of lateral restraint for the balustrade‟s top rail (i.e. handrail) was visible, I consider this fault would unlikely be „apparent‟ to pe rsons who are unfamiliar with construction or building standards. They are unlikely to know a balcony balustrade must withstand 140kmh winds or 1.35kN of force by design, so its handrail needed lateral restraint for added support. Given this, I accept the identified fault was a latent defect for the purposes of the relevant exclusion, and the exclusion applies in the circumstances. It follows the insurer has established that the balustrade ‟s failure is excluded from cover. This extends to its damaged screw fixings, damage caused to the balcony ‟s base by the balustrade giving way, the required re-waterproofing and re-tiling of the balcony floor, and the reinstatement of the balustrade. Exception to latent defect exclusion does not apply to balustrade’s failure Exclusion 1(c) (which includes the latent defect exclusion) is subject to the following exception, which I have considered for the sake of completeness: However We will pay if any of these causes directly results in Loss or Damage from any other Event claimable under Section 1 such as fire or glass breakage. I am not satisfied the exception applies to the matters identified above. This is because the dominant cause of such loss and damage was the balustrade‟s defective design and build. It was not the storm or „any other Event claimable‟ under section 1 of the policy. Exception to exclusion only applies to damage caused by falling balustrade I am satisfied the exception only responds to damage caused by the balustrade ‟s fall . Damage caused by impact from the falling balustrade would constitute „ Loss or Damage from any other Event claimable‟ under section 1 of the policy . It was a different sudden and accidental event that damaged insured property in conjunction with the balustrade‟s defective design and build. Such damage meets the requirements for the exception to apply. Insurer is required to accept damage caused by falling balustrade The supplied photos show the balustrade fell outwards, with a portion of it falling onto the unit‟s timber deck on the ground floor. This damaged a balustrade glass panel, the deck and a nearby flyscreen door. Determination | Case number: 881360 Page 7 of 9 The complainant‟s builder quoted $1,625 plus GST to repair the damaged deck and flyscreen door. The insurer has not given any quote for these items. Given this, I am satisfied the insurer must cover the cost quoted by the complainant‟s builder . The builder‟s $6,340 plus GST quote for the balcony balustrade appears to cover its entire replacement. I am not satisfied the insurer is required to cover this. It is only required to cover the glass panel that broke. Given this, the insurer is to assess and include the cost of replacing this glass panel to the settlement payable. Insurer must also pay interest and some compensation for non-financial loss The insurer must also pay interest on the compensation payable under section 57 of the Insurance Contracts Act 1984 (the Act) and some compensation for non-financial loss. The exchanged information shows the insurer‟s claim decision was made around mid to late April 2022, almost six months after lodgement. Some delay arose because the insurer‟s originally appointed engineer fell ill, and it needed to appoint IF. However, most of the delays were due to a wait for the assessor and engineer‟s reports. I acknowledge the insurer says the General Insurance Code of Practice allows up to 12 weeks for an expert report to be provided. However, I do not accept this means an expert can utilise the full period to provide a report when there is no good reason to do so. The exchanged information shows IF issued his report on 22 February 2022, some two months after his 23 December 2021 inspection. No explanation was given why the report could not have been completed earlier. No explanation was also given why the assessor needed about a month to review IF‟s report and then provide its own report. Although the Insurance Council of Australia characterised the October 2021 storm a catastrophe e vent, the insurer has not suggested or shown this hampered its experts‟ ability to promptly complete their reports. There is nothing in the insurer‟s claim notes or communications that suggests this. Without reasonable explanation for the above delays, and allowing for year-end holidays, I consider eight weeks from 23 December 2021 to be fair and adequate time for the insurer to complete its assessment and decide the claim. Given this, I consider its claim decision should have been made by 17 February 2022 and any delays after this were unreasonable. Considering these matters, I am satisfied it is fair the insurer pays:  interest on the covered repair costs on and from 18 February 2022 until the claim is paid  the complainant $500 for the unusual delays and inconvenience he has experienced. Determination | Case number: 881360 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy wordings General definitions – the meaning of some words … Event(s) means a happening or an incident not intended to happen that occurs during a particular interval of time, or a series of happenings or incidents consequent upon or attributable thereto, which causes or results in Loss or Damage or a legal liability to pay compensation which is claimable under this Policy. … Loss or Damage means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by the policy. … Section 1 – Part A You are covered for the following Events. 1. We will pay up to the Sum Insured shown on the Schedule for Section 1, against Loss or Damage to Your Insured Property on the basis set out in “Claims – basis of settlement”… … Exclusions – what We do not cover under Parts A, B and C 1. We will not pay for Loss or Damage: … Determination | Case number: 881360 Page 9 of 9 (c) (i) caused by … gradual corrosion or deterioration … inherent vice or latent defect, … ; (ii) caused by Wear, Tear, … gradual deterioration or developing flaws; However We will pay if any of these causes directly results in Loss or Damage from any other Event claimable under Section 1 such as fire or glass breakage. … 2. We will not pay for: … (b) the cost of rectifying faulty or defective materials or faulty or defective workmanship;

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.