claim denial for landslip damage to retaining wall excluded under policy

FirmYoui
Decided2022-11-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for landslip damage to a retaining wall and building after a storm, and the insurer declined based on policy exclusions for defective design and wear and tear. AFCA found the decline fair and declined non-financial loss compensation.

On balance expert evidence showed the retaining wall collapse resulted from design and construction not meeting engineering criteria at the time and deterioration, which is excluded under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 881281 Financial firm Youi Pty Ltd Determination | Case number: 881281 Page 1 of 8 Case number: 881281 21 November 2022 1 Determination overview 1.1 Complaint The complainant holds a home building policy with the financial firm (insurer). On 7 April 2022, the complainant lodged a claim for damage to the insured property caused by a landslide during a significant rainfall event. The insurer arranged initial make safe works and provided temporary accommodation while it completed its assessment of the damage. The insurer has declined the claim and says the failure of the retaining wall and associated damage to the insured building is excluded under the policy. The complainant says the significant rainfall event is the cause for the failure of the retaining wall and that the insurer has failed to establish an entitlement to apply the policy exclusions. The complainant also remains dissatisfied with the insurer’s management of th e make safe works and temporary accommodation aspects of the claim. 1.2 Issues and key findings Is the insurer’s decision to decline the claim fair? Yes. The insurer is entitled to decline the claim. The damage claimed, on the balance of probabilities, arose from design/construction defects and wear and tear of the retaining walls, which is excluded under the policy. Has the insurer ’s management of the claim been reasonable ? Yes . The insurer’s overall management of the claim has been reasonable in the circumstances. The assessment of its liability under the claim is consistent with the policy provisions. It would not be fair in all the circumstances to require the insurer to pay the complainant non-financial loss compensation. Why is the outcome fair? The decision is fair because it acknowledges the expert information which, on balance, shows the collapse of the retaining wall and associated damage is due to circumstances excluded from cover. The insurer’s r esponse to the claim in terms of arranging the initial make safe works and assessment of the safety of the dwelling was reasonable. There is no obligation on the insurer to continue providing indemnity under a declined claim. 1.3 Determination The determination is in favour of the insurer. The insurer is entitled to decline the claim and is not required to take any further action. Determination | Case number: 730453 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer ’s decision to decline the claim fair? Yes. The available information shows the failure of the retaining wall was most likely due to the issues noted with its design, construction and deterioration of materials over time. Loss or damage in these circumstances is excluded under the policy. The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Storm ’. Cover under these events is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The complainant has established a valid claim The insurer says the complainant has not shown the damage claimed is due to an insured event i.e. a valid claim does not exist under the policy. However, the panel notes the insurer accepts the landslip event occurred during a significant rainfall event, which is an insured event. Further, the insurer seeks to rely on the policy exclusions to decline the claim. Given this, the panel is satisfied the insurer has accepted a valid claim exists but that it is entitled to decline the claim in line with the policy exclusions. The onus therefore rests with the insurer to show, on balance, an entitlement to decline the claim in line with the policy exclusions or otherwise. Experts have provided conflicting opinions for the cause of damage The insurer relies on the investigations and associated reports provided by engineering consultants ‘S’, geotechnical engineers ‘NR’ and the complainant’s pre -purchase building assessment r eport completed by ‘P’. S completed a site inspection on 8 April 2022 and has provided a report dated 29 April 2022. With respect to measures relating to the retention of the embankment and design of the retaining wall, S notes issues with the batter. S says batters with soft clay should have a maximum (2:3 ratio) 30 degrees. However, it says this was significantly greater at the insured property, and likely in the order of 60 degrees. S refers to the design code relevant to the time of the insured building’s construction, this being AS 1640-1974: Brickwork in Buildings . S found the retaining wall did not comply with the relevant standards or building codes. S notes that the complainant was made aware of issues relating to the retaining wall in the pre-purchase building inspection report from P in February 2021, which states: Retaining Walls Type & Condition: Determination | Case number: 730453 Page 3 of 8 The masonry retaining walls are in poor condition and should be repaired or replaced. A suitably qualified Structural Engineer should inspect and investigate the problems with the retaining wall. The retaining wall appears to be under designed. This is not a qualified engineer's opinion and we recommend that you seek advice from an engineer. With respect to the timber retaining wall, S refers to having also reviewed the building code and standards (CA38 – 1971 – SAA Light Timber Framing Code and standard AS 1684.2 - Residential timber framed construction ). S says the failure of the timber sleeper retaining wall within the failed embankment is consistent with a combination of long term wet rot of the timber and defective design/ workmanship. S completed a stormwater design review having regard to Ordinance 71, which was brought into circulation from the 1920’s and applicable at the time of the original construction of the dwelling. S noted numerous downpipes were discharging locally to grassed areas, as well as, inadequate surface drainage to the rear of the property. This resulted in large volumes of stormwater seepage and overland flow toward the front failed retaining/embankment. S says these issues with the building are significant contributing factors to the failure of the retaining wall and embankment. S concludes that the embankment destabilization is consistent with a combination of:  defective design / workmanship of the masonry retaining at the base of the embankment;  long-term rot of timber sleeper retaining wall within the embankment slope;  defective design / workmanship – defective storm water drainage. The insurer appointed geotechnical engineers NR to assess the cause and extent of the damage, NR has provided a report dated 2 May 2022. NR reports that:  there occurred a pore pressure build up within the colluvial soils (and significant reduction in shear strength) due to the non-existent drainage measures in the construction of the retaining wall  the failed retaining wall appeared to be of non-engineered design and constructed without any drainage measures to prevent pore pressured build up  if the retaining wall had been designed adequately against sliding and overturning with adequate drainage measures to prevent pore pressure build up behind the wall, then the wall would not have failed. NR says the proximate cause for the failure of the retaining wall is the defective retaining wall design  these design issues with the wall were highlighted in the pre-purchase inspection report and repair or replacement was recommended  the presence of dense vegetation was also a significant factor in the collapse. The complainant relies on the investigations and opinions provided by his appointed engineering consultants ‘ W ’. W has provided a geotechnical assessment report dated 27 May 2022, a new wall design document and a response to the insurer’s appointed consultants. Having reviewed this information, W says:  106 mm of rainfall was recorded at the nearest weather station on the date of loss  the singular rainfall event is likely to be the straw that broke the camel’s back causing the destabilisation, following an accumulation of multiple heavy rainfall events  some of the defects in the rock were filled with clay and some defects were steeply dipping towards the west  S’s assessment may have been based on the failed material and not the pre -failure material. The consistency of the materials in their two states would be significantly different Determination | Case number: 730453 Page 4 of 8  a soft clay cutting of the gradient of 60% estimated by SCE would not have stood up for the past fifty years  the likely cause of the retailing wall failure was a landslip caused by the storm on the 7th of April 2022. Further, having considered P’s pre -purchase building assessment report dated 3 February 2021, the panel notes the following:  P refers to various major and minor defects to the insured building  P concludes the overall condition of the building, when compared to other dwellings of similar age, construction and level of maintenance would be considered as below average  As one of the major defects noted to the exterior sections, P refers to the retaining walls. P says the masonry retaining walls are in poor condition and should be investigated by a suitably qualified structural engineer. Information from the insurer is more persuasive The panel acknowledges the complainant’s concern that the insurer’s consultants have made assumptions regarding the time of construction of the retaining wall. He says given these assumptions, the consultants have not shown the standards and codes referred to actually apply to the construction of the retaining walls in question. However, the complainant has not provided any persuasive information to the contrary or reference to any other standards or codes. The panel accepts, without information to the contrary, it is reasonable to accept the proposed time of construction by the various consultants. The panel notes similar time periods have been referred to by S, NR, P and W i.e. approximately 50 to 70 years. Therefore, the panel accepts, on balance, the standards and building codes referred to are relevant to the consideration of the complaint. Given this, the panel is satisfied the insurer has shown, on balance, that the design and construction of the retaining wall was not in line with the relevant standards and building codes. Further, that the information shows the presence of significantly deteriorated and rotted timber that had once formed the construction of the timber sleeper retaining wall. The complainant believes that P’s report in referring to concerns with the retaining walls, is limiting such concern to the rear retaining wall and not the front retaining wall subject of the claim. The panel is not of the same opinion and is satisfied the report refers to all the retaining walls that form part of the exterior of the dwelling. It may well be that only one photo has been provided in the report, however, this is consistent with all sections of the report. The panel acknowledges W’s opinion that unprecedented rain over a course of time and then a single rainfall event was the immediate cause of the landslide, forcing the retaining wall to collapse. However, W ’s report and other communication are brief, lack detail as well as any persuasive supporting information. There is little to no information relating to the investigations it may have undertaken. In the absence of such information, the panel is not satisfied that W’s information can be preferred ove r the reports from S, N and P. Having carefully considered all the information, the panel accepts it has been shown, on balance, that the loss claimed is due to circumstance excluded from cover the policy. This is because the information shows the collapse of the retaining walls (masonry and timber) was more likely than not due to:  the design and construction of the masonry retaining wall not being in accordance with the engineering criteria applied at the time of construction; and  significant deterioration of the timber due to wear and tear and gradual deterioration. Determination | Case number: 730453 Page 5 of 8 Given the above information, the panel is satisfied, the insurer is entitled to decline the claim. 2.2 Has the insurer ’s management of the claim been reasonable? The complainant is not entitled to non-financial loss compensation? The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. In this instance and considering AFCA ’s approach to compensation, the panel is not satisfied it would be fair to require the insurer to pay the complainant non-financial loss compensation. This is because, as discussed above, the insurer’s assessment of its liability and decision to decline the claim is consistent with the policy provisions. Further, the panel is satisfied that the insurer promptly attended to arranging the emergency make safe works as well as an assessment of the main dwelling to ensure it was safe and habitable. The panel accepts there was reference to a requirement to remove the damaged timber decking by the builder. However, the information shows the insurer had come to a decision on its liability under the claim by the time these works were to be completed. As such, the panel accepts it was fair in all the circumstances that the insurer stopped providing indemnity once the decision to decline the claim was communicated to the complainant. The panel accepts the insurer acted reasonably and promptly in appointing several suitably qualified consultants to assess the insured building and complete make safe assessments. The house was declared safe for the complainant to move back into. The panel is not satisfied there is any information to show the complainant has been prejudiced, financially or otherwise , by the insurer’s management of the claim . The panel acknowledges the complainant’s concerns regarding temporary accommodation and the fact his family had to move to different locations of accommodation. The panel accepts this will have been stressful and inconvenient. However, the panel accepts in times of significant weather events, finding and arranging temporary accommodation is challenging given the increase in demand. Further, it is difficult to determine how long an accommodation may be required in the initial stages of a claim. For these reasons, the panel is not satisfied it would fair in all the circumstances nor consistent with the AFCA Rules, to require the insurer to pay the complainant non-financial loss compensation. 2.3 Why is the outcome fair? The decision is fair because it acknowledges the available expert information shows, on balance, that the failure of the retaining walls is due to factors excluded under the policy. The insurer’s response to the claim in terms or arranging the initial make safe works and assessment of the safety of the dwelling was reasonable. There is no obligation on the Determination | Case number: 730453 Page 6 of 8 insurer to undertake further works and provide temporary accommodation once it has determined the claim was not covered under the policy. 3 Supporting information 3.1 AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in general insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy wording Insured events Determination | Case number: 730453 Page 7 of 8 Your buildings and contents are covered up to the sum insured shown on your policy schedule for the following events where they occur at the insured premises. 6. Storm What is covered? ... Loss or damage to the insured property caused by landslip or subsidence that occurs within 72 hours of, and directly because of, a storm that occurred within the contract period. ... General exclusions These general exclusions apply to all sections of your policy. ... We will not pay for loss or damage: 21. to retaining walls where the design and construction of the wall was not according to engineering criteria that applied at the time of construction; ... We will not pay for death or bodily injury to any person, or loss or damage to property, caused directly or indirectly by: 37. wear and tear, rust, corrosion, or deterioration; Other matters The panel notes the complainant’s reference to various sections of the Insurance Contracts Act 1984 (Act). However, the panel is not satisfied these assist the complainant’s position in the circumstances. The complainant says he was not aware of the stated issues with the retaining walls and building defects identified by the Insurer's experts and always maintained the property in good condition. He therefore seeks protection under Section 46 of the Act. Section 46 prevents an insurer from relying on an exclusion clause that refers to the condition of a thing before the contract was entered into, if the complainant (or a reasonable person) was not aware of the defect or condition which wholly or partly caused the damage claimed for. However, the exclusions relied upon by the insurer apply generally and are not temporal in nature nor refer to the complainant’s awareness (or not). Section 46 of the Act does not assist the complainant’s position. Similarly, the complainant refers to section 54 of the Act. He says given the property was purchased during COVID-19, he was unable to complete the recommended rectifications Determination | Case number: 730453 Page 8 of 8 and/or repairs noted in the pre-purchase inspection report, although he intended to. The complainant has not provided any information in showing any attempts or steps taken to undertake the recommended repairs/rectifications in P’s report. The panel also notes this contrasts with the complainant’s previous positions that he was not aware of any issues with the retaining walls as well as his position that there were no issues relating to the front retaining wall. Regardless, section 54 of the Act relates to post contractual acts and does not assist/apply to acts and/or failures that occur prior to inception of a contract of insurance. The available information shows the complainant through P’s report was made aware of the issues with the insured building, including the retaining walls, prior to purchasing the property as well as inception of the policy in 2021. The complainant chose to purchase the home in its condition as well as failed to attend to (or make any effort to attend to) the major defects recommended by P. These acts and omissions occurred before inception of the policy, section 54 of the Act does not assist the complainant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.