Home / IAG / Determination 881193
Determination 881193
water damage claim settlement offer
Summary
The complainant disputed the insurer's cash settlement for water damage from an air-conditioning leak, arguing the ceiling cracks were not pre-existing and the damage was under-assessed. AFCA found the ceiling cracking pre-existing but the roof space was not inspected, and set a settlement of $3,795 less the $1,000 excess, reimbursed the $595 report cost, and awarded $250 for IDR delays.
The insurer did not adequately assess the damage by failing to inspect the roof space, and its IDR responses were late under RG271, so a fair cash settlement and non-financial loss compensation were warranted.
Issues
- Claim amount dispute primary · upheld
“The insurer's settlement offer is not fair, it should be increased to $3,795.”
- Inadequate claim investigation secondary · upheld
“I am satisfied, the insurer has not adequately assessed the damage.”
- Complaint handling failure secondary · upheld
“The insurer provided IDR responses on 7 June 2022 and 17 June 2022... did not handle the complainant's complaint within the required timeframes.”
- Delay secondary · upheld
“I am satisfied the insurer did not handle the complainant's complaint within the required timeframes.”
Subjects and remedies
pay claimpay compensationpay non financial lossrefund fees or charges
Text of the determination
Determination
Case number 881193
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 881193 Page 1 of 6
Case number: 881193 5 January 2023
1 Determination overview
1.1 Complaint
On 31 January 2022 the complainant lodged a claim with the financial firm (insurer) for water
damage to his property.
The insurer accepted the claim and assessed the damage. The insurer says some cracking
damage to the ceiling is pre-existing and has offered a cash settlement of $2,180.26 less the
applicable policy excess of $1,000.
The complainant disputes the settlement. He says the ceiling cracks are not pre-existing and
seeks:
for the insurer ’s settlement offer to be increased
to be reimbursed for his report cost
compensation for the stress caused by the insurer.
1.2 Issues and key findings
Is the insurer’s settlement offer fair ?
No. The insurer’s settlement offer is not fair, it should be increased to $3,795.
Is the complainant entitled to any compensation?
Yes. The complainant is entitled to $250 compensation for non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of the complainant accepting this determination, the insurer is required to pay
the complainant:
$2,795 ($3,795 less the $1,000 policy excess) in full and final settlement of the claim
$250 compensation for non-financial loss.
Other than making the above payments the insurer is not required to take any further action in
relation to the claim or complaint.
Determination | Case number: 881193 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair ?
No. The insurer’s settlement offer is not fair, it should be increased to $3,795.
Insurer has offered a settlement of $2,180.26
The insurer engaged a builder (JL) who has provided two scopes of works (SOW) and quotes
to repair the accepted damage. These quotes total $1,816.89 ($1,293.29 plus $523.60).
The insurer has then added a 20% contingency to reach a settlement offer of $2,180.26.
Complainant says insurer has not assessed all the damage
The complainant says the insurer has not properly assessed the damage and there is
extensive damage on top of the ceiling. He says the ceiling cracks were not pre-existing.
The complainant says an extensive inspection is required.
Experts agree leak from air-conditioning unit caused damage
Both the complainant and the insurer engaged experts to assess the damage and its cause.
All the experts agree the air-conditioning unit was leaking and this caused damage. However,
they disagree on the extent of the damage caused by the leak.
The i nsurer’s builder , JL, provided a report and in it says:
there is water staining and deterioration to the plaster ceiling and walls within the hallway
and linen cupboard
the damage appears to have been caused by a leaking air-conditioning unit
it recommends an air-conditioning specialist attend to inspect the unit
there are pre-existing cracks to the plaster celling in the hallway and it is therefore unable
to warrant the repairs.
A roof plumber (NL) was appointed to complete a leak detection report. NL says the water is
coming from a leaking air-conditioning unit.
An aircon expert (AA) was appointed to inspect the air-conditioning unit and says:
a section of the air-conditioning unit ’ s pad was on the fan blade which has damaged the
pad and is the reason the unit is leaking water
the air-conditioning unit has not faulted or been damaged due to a storm or rain instead, it
is a lack of maintenance.
The complainant provided a report from a building inspector (IB). In its report IB says:
it agrees with NL a failed water pipe/condensate drain in the air-conditioning unit has
caused the damage to the ceiling and walls
JL’s report is inconclusive and its repair estimate inadequate
The ceiling insulation has been affected by the water and may be mouldy
the cost of repair is $3,500 to $4,000 including a hygienist for the potential mould.
Ceiling cracking is pre-existing and not covered
JL was asked to explain how it reached the conclusion the ceiling cracks were pre-existing.
JL says the cracking damage is not consistent with water damages and it is dry cracking due
to building movement.
Determination | Case number: 881193 Page 3 of 6
IB referred to the ceiling cracking as ‘separation movement cracks’. I am satisfied this is
consistent wi th JL’s comment the cracks are due to building movement.
The photos of the cracks show they are at turns/joins in the hallway. These areas are
common locations for movement cracks.
I am satisfied, on balance, the ceiling cracking was not caused by the water leak and is pre-
existing. Because the cracking is pre-existing it is not covered under the claim.
Insurer has not adequately assessed the damage
IB has provided photos from in the roof space. JL has not provided any photos from inside the
roof space. There is no information to show JL (or NL or AA) inspected the roof space or the
top of the ceiling.
While JL has provided a quote for the removal and replacement of the insulation it has not
commented on the possibility of mould.
The insurer says IB does not confirm there is mould. I accept this. However, IB raises the
possibility of there being mould. Both parties agree the ceiling insulation was water damaged
and needs to be replaced. It is not difficult to conclude mould may also be present.
The leak was from an air-conditioning unit in the roof space. In my view good industry
practice would be to, at a minimum, visually inspect the roof space in these circumstances.
The insurer has not inspected the roof space and therefore, I am satisfied, the insurer has not
adequately assessed the damage.
Further assessment is unlikely to bring a resolution to the claim
Throughout the course of the claim the complainant has made degrading and unnecessary
comments regarding one of the insurer’s assessors .
This behaviour is inappropriate, and because of it, JL has said it does not wish to associate
itself with the complainant further. I am satisfied this is fair and reasonable.
Typically, in cases like this, when an insurer has not adequately assessed the damage I
would consider it appropriate for the insurer and complainant to work together to conduct
further assessments . However, given the complainant’s inappropriate behaviour during the
course of the claim and complaint I do not consider such action would be likely to result in a
resolution of the claim.
In the interests of bringing finality a settlement of $3,795 is fair
Therefore, in the interests of bringing finality to this claim and complaint for both parties I
consider a fair and reasonable outcome is for the claim to be cash settled.
I note IB’s report does not provide a breakdown of costs, is not from a builder, and is not an
actionable quote. However, it was useful in determining if the ceiling cracks were pre-existing.
I therefore consider it fair for the insurer to reimburse the complaint for the $595 cost of IB’s
report.
With respect to the claimed damage and considering the possibility of mould I consider a fair
settlement to be $3,200 including an allowance for contingencies.
Therefore, I am satisfied a fair full and final settlement of the claim is $3,795 ($3,200 plus
$595) less the applicable policy excess of $1,000.
Determination | Case number: 881193 Page 4 of 6
2.2 Is the complainant entitled to any compensation?
Yes. the complainant is entitled to $250 compensation for non-financial loss.
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a
normal degree of inconvenience during a claim.
IDR process not handled in line with required timeframes
The standards an insurer is expected to meet for customer complaints and its internal dispute
resolution (IDR) process are set out in Regulatory Guide 271 (RG271) issued by the
Australian Securities & Investments Commission (ASIC).
At RG271.27 it says a ‘complaint’ is:
[An expression] of dissatisfaction made to or about an organization, related to its
products, services, staff or the handling of a complaint, where a response or
resolution is explicitly or implicitly expected or legally required.
The insurer says the complainant first raised concerns on 21 March 2022. The email from the
complainant to the insurer on 21 March 2022 appears to be an expression of dissatisfaction
and indicates a response was expected. I am satisfied it is a ‘complaint’ wi thin the meaning
given in RG271, this is consistent with the insurer’s statement.
The complainant sent a further email on 2 May 2022 which the insurer acknowledged on the
same day. The insurer’s acknowledgeme nt specifically says the complainant has ‘expressed
[his] dis- satisfaction with the cost of repairs’ .
On 26 May 2022 and 1 June 2022, the insurer said it will conduct a ‘level 2 review’. Level 1
and level 2 reviews are terminology arising from the practice of many insurers to have a multi-
tier IDR process.
RG271 does not set out a multi-tier IDR process. At RG271.35 it says:
Regardless of a firm’s structure, it is the complainant’s expression of
dissatisfaction (that meets the definition of ‘complaint’ in RG 271.27) that t riggers
a firm’s obligation to deal with the matter according to our IDR requirements, not
the referral of a complaint to a specialist complaints or IDR team.
At RG271.102 the guide says:
The maximum IDR timeframes for providing an IDR response (see RG 271.56 –
RG 271.101) apply to all IDR processes, including those that include internal
appeals or escalation mechanisms (multi-tier IDR processes).
Determination | Case number: 881193 Page 5 of 6
RG271.51 says a financial firm should acknowledge the receipt of a complaint promptly,
within 24 hours, or as soon as practicable. There is no information to show the insurer
acknowledged the complainant’s compla int prior to 2 May 2022.
RG271.53 says an ‘IDR respon s e’ is a written communication and sets out what this should
include. Importantly it says the IDR response should inform the complainant of:
their right to take the complaint to AFCA if they are not satisfied with the IDR response
the contact details for AFCA.
The maximum IDR response timeframe for insurers is 30 calendar days (starting the day after
the complaint is received). Therefore, the IDR response was due on 21 April 2022. There are
some exceptions to this however, the available information does not clearly show one of
these exceptions applies in this case. In either case RG271.65 says an ‘IDR d elay
notification’ must be provided, there is no information to show this was done prior to 21 April
2022 (or at all).
The insurer provided IDR responses on 7 June 2022 and 17 June 2022. This is about one
and a half months after it was required under RG271. I am therefore satisfied the insurer did
not handle the complainant’s complaint within the required timeframes.
For the sake of completeness, even if I was to accept the date of the complainant’s complaint
was 2 May 2022, which I do not, the response would have been due on 2 June 2022. It
therefore still would not have been provided within the timeframes set out in RG271.
Complainant is entitled to $250 compensation for non-financial loss
When considering non-financial loss compensation AFCA looks at what is reasonable and fair
in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to
factor the overall claims experience and the conduct of all parties rather than focusing on
specific individual events.
I am satisfied the insurer not complying with the required timeframes for its IDR process and
its inadequate assessment has caused the claim to take an unusual amount of time to resolve
and has caused an unusual amount of interference with the complainant’s expectati on of
enjoyment or peace of mind.
Having considered all the available information and what is fair in all the circumstances I am
satisfied the complainant is entitled to $250 compensation for non-financial loss.
Determination | Case number: 881193 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AF CA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.