1 Determination overview
1.1 Complaint
The complainant held a home building and contents insurance policy with the financial firm
(insurer). On 28 January 2022, he lodged a claim for storm damage to his home and some
contents.
The insurer declined the claim saying the damage was not caused by an event insured under
the policy, but rather was due to factors which are excluded.
The complainant disputes this and says the damage was caused by a storm event, where
high volumes of water entered the building.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The insurer is not entitled to decline the claim. This is because the evidence shows, on
balance, the proximate of cause of damage was a storm event and the insurer has not
established an exclusion applies or that it is otherwise entitled to deny liability.
Is the insurer liable for other costs/compensation?
The insurer is required to contribute to the professional costs incurred by the complainant (up
to a total maximum of $5,000 and subject to the provision of evidence of costs incurred),
because the expert evidence he provided assisted him in establishing his position that the
claim should be accepted. The insurer is also liable for the additional make safe works
undertaken by the complainant, and for alternative accommodation costs.
As well, the insurer must pay $3,000 compensation for non-financial loss.
Why is the outcome fair?
It would not be fair for the insurer to deny liability when the complainant has shown he has a
valid claim for storm damage, and the insurer has not shown exclusions apply or that it has
any other basis for declining the claim.
1.3 Determination
This determination is in favour of the complainant. The insurer is required to settle the claim
for the resultant storm damage to the building and contents, as set out in this determination
below and otherwise in accordance with the terms and conditions of the policy. It is also
required to cover other applicable policy benefits (including alternative accommodation, as set
out below, and removal of debris).
The insurer must also reimburse the complainant’s professional costs incurred, subject to
provision of the relevant invoices, plus statutory interest; the further make safe work paid for
by the complainant ($5,076) plus statutory interest; as well as paying $3,000 compensation
for non-financial loss.
Determination | Case number: 880519 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Complainant has established a claim within the terms of policy
The complainant is represented. For simplicity, both the complainant and his representative
are referred to as ‘the complainant’ in this determination.
The onus is on the complainant to establish, on balance, his claim falls within the scope of
cover under the policy. This is commonly called a ‘ valid ’ (or prima facie ) claim. Once this is
established, the onus shifts to the insurer to establish, on balance, an exclusion applies or
that it is otherwise entitled to decline the claim.
The policy provides cover for listed insured events, including ‘storm, rainwater or run - off’.
While accidental damage is available as an optional extra cover, the policy schedule shows
the complainant did not select this cover.
It is not in dispute there was a storm and that rainwater entered the home, causing damage to
the building and some contents. The complainant says the water entered because the gutters
could not cope with the significant volume of rainfall. However, the insurer says that for the
policy to respond, the rainwater needs to have entered the property through an opening made
by the storm.
The policy states that cover applies for ‘loss or damage caused by’ storm or rainwater. These
latter two words are defined in the policy, as set out in section 3.2 below. The insuring clause
has no requirement to establish damage occurred via storm-made openings.
Having regard to the broad policy definitions, the circumstances of the storm event and the
water damage inside the building, the panel is satisfied the complainant has established a
valid claim under the insured event of ‘storm’.
That means the onus now shifts to the insurer to establish, on balance, it is entitled to decline
the claim.
Insurer maintains damage is excluded from cover, based on its expert reports
In declining the claim, the insurer cites the following exclusions for:
inherent defects, including faulty design, structural defects and poor workmanship
anything not directly related to one of the insured events
wear and tear including gradual deterioration, depreciation or lack of maintenance
‘ rainwater, rainwater, run-off, hail, wind or water that enters your buildings through an open
door, window or other opening ’ . The policy goes on to clarify that this last exclusion does
not apply to openings made by the storm or cyclone.
The insurer principally relies on the opinion of builder M, who reported the serving northern
gutter outlet was blocked at the time of the event, which inundated the southern outlet,
triggering the stormwater ingress to all three affected rooms. The insurer says that while there
were signs of a blockage in the gutter, no actual blockage was observed.
A summary of M’s findings and those of other experts appears in section 3.3 below.
Determination | Case number: 880519 Page 4 of 11
Proximate cause of damage is storm
In seeking to establish whether the insurer is liable for the claim, it is necessary to identify the
proximate cause of the damage.
The proximate cause is a question of fact depending on the circumstances. The proximate
cause of a loss is not necessarily the first or last or the sole cause. It is the effective,
dominant or operative cause of the loss.
Based on the available evidence, the panel is not satisfied, on balance, the insurer has
established the damage was caused by excluded causes. In the absence of other evidence to
the contrary, the panel is satisfied the proximate cause of damage was the storm event.
This is because the information provided (includ ing evidence from the insurer’s original
builder A, the complainant’s experts, and the complainant’s photographs) indicate, on
balance, the causes of the damage suggested by M have not been established. Namely:
M said the roof had not been maintained, but photographs from the complainant show
maintenance has been carried out in the past
while there may be an issue with the skylight, this caused only slight water damage and
was unlikely to be the main cause of water ingress during the storm event
M says there is corrosion on sheeting and leaf litter remnants on the roof. However, the
images show localised superficial corrosion. This has been confirmed by the complainant’s
roof plumber, H, who says there is only superficial rust which would not affect the
serviceability of the roof
M notes recent repairs with silicon have been carried out on the roof; however, the
complainant has explained this was part of works done for the air conditioning unit
M says the northern gutter outlet was significantly impeded by a blockage, which led to the
water ingress. However, the complainant’s images taken after the storm event but before
M’s inspection show the gutter outlet had no debris.
The insurer focuses on the fact the complainant has not established the damage occurred
through a storm-created opening. However, the policy does not require the rain to have
entered through a storm-created opening. Instead, the exclusion simply says cover does not
apply where water enters the building ‘through an open door, window or other opening’. In
relying on the exclusion, it is the insurer’s responsibility, and not the complainant’ s, to
establish that is what happened.
The available evidence indicates the water had backed up on the roof during the storm and
entered eventually through the skylight. The panel does not consider the (closed but
ultimately overwhelmed) skylight reasonably represents an ‘opening’ as intended by the
wording of the exclusion.
Nor is the panel satisfied the insurer has established any other exclusions apply. Builder H
noted there were no leaks on the roof, as such; and other expert commentary, as well as
photographs and reports from the initial make safe work, indicate the roof was overall in good
condition, serviceable and consistent with applicable building standards. Even if there were
signs of wear/gradual deterioration on the roof requiring maintenance, the evidence shows,
on balance, the force of the storm was such that the water ingress would have occurred in
any case. In other words, but for the storm, the damage would not have happened,
regardless of the pre-existing condition of the roof. That means the storm is the proximate
cause of the damage.
Determination | Case number: 880519 Page 5 of 11
Insurer required to cover other costs incurred by the complainant
The insurer had commenced make safe works after the claim was lodged, but then
discontinued. The complainant then completed those works at his own cost ($5,076). The
insurer is required to reimburse the complainant for those costs (as it has now agreed to do),
but it must also pay statutory interest on that amount calculated from the date he paid, up to
the date of settlement.
Given the unliveable condition of the house, the insurer should also cash settle the
complainant for alternative accommodation costs already incurred (subject to the provision of
evidence of those costs), together with statutory interest calculated from the date(s) he paid
up to the date of settlement.
In addition, the insurer is required to cover further temporary accommodation in accordance
with the policy terms and conditions. That applies while the home is unable to be lived in, for
up to a maximum of 12 months. Given the delays already experienced because of the
insurer’s denial of the claim, it is fair that the 12 month maximum period be calculated from
the date the insurer cash settles the claim. As the claim is being cash settled, the complainant
is required to act promptly to arrange for and finalise the claim-related repairs, so that any
further period of necessary alternative accommodation is managed reasonably in the
particular circumstances.
Insurer is required to cash settle the claim
The complainant has established a valid claim for storm damage and the insurer has not
shown exclusions apply. That means the insurer is liable for the claim-related damage to both
the building and to contents.
It is not clear what, if any, repairs the complainant may already have carried out. The
evidence also indicates there was some pre-existing damage to the home and some
contents, for which the insurer is not liable.
The complainant provided a quote for $81,914 for building work, however that is not itemised,
and appears excessive based on the identified storm damage. M ’s assessment , on the other
hand, was more specific. It noted extensive damage to the ceilings in the upper level (mainly
rumpus room and bedrooms), but also to the stairwell and lighting. There was, however, also
evidence of previous water ingress in bedroom 3 and carpet discolouration in the rumpus
room due to staining from a rug – neither of which damage was caused entirely from the
claimed event.
In the circumstances, the panel considers it fair that the insurer cash settles the claim for
building damage based on M’s initial report (in which storm -related and non-storm-related
damage was distinguished). The insurer is required to fully scope the claim-related building
damage identified, provide revised costings (based on a quote(s) actionable by the
complainant as a retail customer), and then cash settle based on the quoted amounts,
increased by 20% to allow for contingencies and the transfer of risk. To be clear, the revised
scope and costings should also include cover for damaged insulation, if any (which did not
appear in M’s initial review of the property) as well as for identification and treatment of any
mould which may have occurred following, and because of, the storm, and which has not
already been dealt with by the insurer. The cash settlement should also include appropriate
allowances for additional policy benefits which apply (such as cover for the cost of removal of
debris).
Determination | Case number: 880519 Page 6 of 11
With regard to contents, the complainant listed a number of items, although the evidence
does not show that all were damaged as a result of the storm event. (For example, the
insurer’s expert identified that the coffee table had been damaged by impact, not the storm.)
The complainant provided quotes of $13,880 for carpet (for the entire first floor, although the
evidence does not show carpet on the staircase was damaged) and $6,663 for window
furnishings.
With regard to the carpet, the panel notes the product disclosure statement states that cover
is ‘ limited to the room, hall or passage in which the loss or damage actually occurred ’ . That
means the insurer is not liable for carpet in a room where damage was not identified (such as
the stairwell), simply in order to match with the areas where damaged carpet needs to be
replaced.
In the circumstances, and based on the available evidence, the panel is satisfied the insurer’s
liability for contents should be limited to the Persian rug, the carpet in the two bedrooms and
rumpus room, the damaged curtains in those rooms, the TV in the rumpus room,
entertainment unit from bedroom 4 and the rumpus room light fitting. Updated quotes will
need to be obtained by the complainant for those items, and the insurer is required to assess
and cash settle the relevant reasonable amounts.
2.2 Is the insurer liable for other costs/compensation?
Insurer is to reimburse complainant for professional costs
Under our Rules, AFCA may require a financi al firm to contribute to a complainant’s
professional costs incurred in bringing their complaint. This may include legal costs, expert
report fees, or travel expenses. AFCA will consider whether these costs were reasonable and
whether they helped resolve the complaint. Unless there are exceptional circumstances, we
will not require the insurer to contribute more than $5,000 to these costs.
As the complainant has engaged his own professionals, and this has assisted in establishing
his position, the panel considers it is fair the insurer reimburse him for the reasonable costs
for the expert reports of HK, N, C and R.
The complainant is to supply the insurer with the relevant paid invoices. Once these are
received, the insurer must contribute to these costs up to a maximum of $5,000 in total.
Insurer is liable for compensation for non-financial loss
We may also award compensation for non-financial loss in limited circumstances, including
where the complainant has experienced an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind as a result of the insurer’s actions.
In this matter, the panel is satisfied the insurer’s handling of the complaint caused avoidab le
delays and considerable upset and inconvenience to the complainant (including as a result of
incomplete make safe works and the health concerns of potential mould contamination). In
the circumstances, it is fair and appropriate that the insurer pays the complainant $3,000 as
compensation for non-financial loss.
2.3 Why is the outcome fair?
The panel considers this outcome is fair because:
Determination | Case number: 880519 Page 7 of 11
the complainant has established the proximate cause of the damage was a storm event
the insurer has not shown exclusions apply or that it is otherwise entitled to decline the
claim.
The insurer’s handling of the matter has also caused the complainant a significant degree or
avoidable upset and inconvenience, and he has incurred professional costs in support of his
claim, for which he should be reimbursed.
Determination | Case number: 880519 Page 8 of 11
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 880519 Page 9 of 11
3.2 Key points from expert evidence
Record Key points
Insurer’s builder (A)
Make safe report s 1 and 2
28 /29 January 2022
Partial ceiling collapse in upstairs bedroom caused by storm /leaking
roof .
Water fittings will require replacement.
Cleared box gutters.
Insurer’s builder (A)
Restoration report
1 February 2022
Caus e of damage upon visual inspection of the affected areas is
consistent with the heavy downpour, which occurred on Friday 28.
Resultant dam age at time of inspection: affected items included
elevated moisture to the plaster ceiling, walls, floor coverings and
subfloors.
Insurer’s builder (A)
Moisture report
1 February 2022
Installed three air movers and one dehumidifier.
Removed smoot h edge from the top level.
High readings (50% - 100%) still present in several areas.
Insurer’s builder (A)
Moisture report 2
1 February 2022
Notes moisture levels in bedroom 2 and bedroom 3 as 15%.
Notes living room moisture level as 25% floor, 10% for wall and 10%
for ceiling.
No moisture checks were conducted downstairs.
Complainant’s air
conditioning expert (D)
Letter
18 February 2022
Admits liability for damaging left bedroom.
All other damage caused by blocked gutters.
Complainant’s re storation
expert (C)
Report
22 February 2022
Ceilings, skirtings, and architraves were high in moisture readings.
Caus e of damage is wat er intruding through the roof cavity down the
walls and through the lights due to excessive rain.
There are parts of ceilings removed and ho les made which could be
to releas e the pressure of water in the roof made by a plumber or the
previous restorer.
The roof was assessed, and no issues or defects were recorded wit h
the gutter system.
The air conditioning system had leaked in a certain location of the
roof and the client advised this has been raised with the installer.
This is not the cause of flooding.
Insurer’s builder (M)
Report
25 February 2022
The flashing servicing the skylight was not ed to fall towards the lens,
thus allowing wa ter to pool atop the lens.
The skylight lens was also observed with debris beneath the
flashing, impeding the flashing function. This is considered the cause
of the ingress observed.
Evidence of long - term leaf litter and debris build - up was observed to
the associated box gutter on the northern end, res ulting in corrosion
and leaf litter remnants.
Damage consistent with electrolysis and long - term deterioration was
Determination | Case number: 880519 Page 10 of 11
Record Key points
observed to the associated roof sheeting, resulting in corrosion.
Recent temporary repairs including the application of silicone sealant
was observed to the corroded roof sheets and fixture penetrations,
consistent with the resultant damage.
Complainant’s builder (N)
Report
8 March 2022
Found the area to be free from any debris that would restrict flow of
water, refer to pictures taken on the day.
The area around the air conditioner is ‘well sealed’.
The leak in the skylight is not at the rear.
Complainant’s roof
plumber (H)
Report
9 March 2022
Roof penetrations appear to be in good condition with no visible
signs of problems causing water ingress.
Perimeter soaker flashings are in good condition, with all fixings and
sealants in good condition. No visible signs of laps or mitres causing
ingress of rainwater.
Roof fixings are in reasonable condition. Some fixings may require
sealing washers to be replaced.
The gutters were clean and free of any debris, Outlets were not
blocked and are fitted with screens to limit debris from discharging
into external railheads.
The re are visible signs of surface rust on sections of the gutter but
no visible signs of holes or potential issues that would cause the
ingress of rainwater.
It appears a significant rain event has caused the box gutter to
overflow and in turn the entry of r ainwater inside the structure.
Complainant’s roof and
fence expert (R)
Report
21 March 2022
Did not find the problem in the roof.
The damage to the ceiling has happened from box gutter overflow.
Complainant’s air
conditioning expert (D)
Letter
16 May 2022
Agree to fixing the ceiling in the bedroom on the left - hand side
upstairs.
Will also patch the other two rooms.
Will also replace the roof sheet under the heat er.
Will not paint the ceiling.
Caus e of damage was due to the storms and the gutter not cop ing
and not gutter being blocked.
Complainant’s roof
plumber (H)
Letter
18 August 2022
Roof penetrations appear to be in good condition with no visible
signs of problems causing water ingress.
Observed surface rust in the gutter which in no way would impede
the flow of rainwater to the box gutter outlets.
The rust was not in a condition where it was flaking, but was certainly
well ingrained in the bas e metal and required attention.
Determination | Case number: 880519 Page 11 of 11
3.3 Relevant extracts from policy wording
Definitions
Some of the words in this policy have special meanings wherever they appear.
These words and their meanings are defined below.
When we say We mean
…
Rainwater Rain falling naturally from the sky onto the buildings and/or
ground.
…
Storm Violent wind (including cyclones and tornadoes),
thunderstorms or hail which may be accompanied by
rainwater or snow.