Flood claim: dispute over building repair settlement amount, contents settlement and claim handling delays
Text of the determination
Determination
Case number 880501
Financial firm AAI Limited
Determination | Case number: 880501 Page 1 of 7
Case number: 880501 11 August 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy (policy) with the financial firm
(insurer). On 23 February 2022, the complainant lodged a claim for damage to the insured
property following a flood event.
The insurer has accepted the claim. However, the complainant remains dissatisfied with the
insurer ’s settlement for damage to the insured contents as well as its final settlement offer for
the damage to the insured building. Further, the complainant is dissatisfied with the insurer’s
management of the claim and the delays experienced, which he says has contributed to
further loss.
1.2 Issues and key findings
Is the insurer required to increase its claim settlement offer?
Yes. Although the insurer is not required to pay the complainant the total building sum insured
of $446,800.00, it is to increase its final claim settlement in line with this determination.
Is the insurer liable for contents damage beyond the sum insured?
No. The insurer is not required to pay anything further towards the contents damage, for
which it has cash settled the complainant to his maximum entitlement under the policy
($143,800.00).
Is the complainant entitled to compensation?
Yes. The available information shows the insurer’s management of the building component of
the complainant’s claim did result in undue levels of stress, inconvenience and delays . The
insurer is to pay the complainant $3,500 in non-financial loss compensation (NFL). The
insurer is to reimburse the complainant for expert related expenses up to $5,000, excluding
the legal expenses and report from engineers ‘B’.
Why is the outcome fair?
The outcome is fair because the exchanged material establishes the insurer is entitled to
settle the claim on the basis the insured building is repairable, but it is to increase its final
claim settlement. The complainant has been paid his maximum entitlement under the policy
for contents damage and it is fair the insurer pays the complainant NFL.
1.3 Determination
This is outcome is partly in favour of the complainant.
The insurer is to settle the claim in line with this determination.
Determination | Case number: 880501 Page 2 of 7
2 Reasons for determination
2.1 Is insurer required to increase its claim settlement offer?
Yes. The insurer is to increase the final claim settlement amount offered for the damage to
the insured building.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). Therefore, the panel
accepts the insurer is entitled to rely on the policy provisions to assess its liability under the
claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Flood ’. Cover under the policy is subject to the conditions,
limitations and exclusions specified in the PDS.
The complainant has shown damage that triggers cover under the policy
There is no dispute the insured property was inundated by water on or about 23 February
2022 due to a significant flood event. The insurer accepts this event has caused significant
damage to the complainant’s home and contents. The insurer has paid the complainant
$143,800.00 towards damage to the contents , which represents the complainant’s maximum
entitlement under the contract for contents.
The insurer has offered to settle the building component of the claim by way of a final cash
settlement of $397,965.99, which includes $11,700 towards temporary accommodation for six
months and a 15% contingency payment. The complainant says this offer is not adequate to
cover the building damage and the insurer should be required to pay the maximum policy
sum insured amount of $446,800.00.
The insurer says its settlement of the complainant’s contents loss is reasonable and in line
with its policy obligations. Further, that its assessment of and associated claim settlement
offer for the building damage is also consistent with its obligations under the policy. The
insurer has refused to increase its final claim settlement.
The panel has carefully considered the significant amount of information provided by and
exchanged between the parties. Given all the material has been exchanged with the parties,
the panel does not intend to reiterate all this information within this determination. The panel
notes for the most part, the parties agree on the exhaustive list of building repairs, however,
there are certain aspects of the proposed repairs that remain in contention, these will be
considered below.
The insurer ’ s proposed method of floor repairs is reasonable
The parties have each sourced reports from various building and engineering consultants in
support of their positions relating to the repairs to be accepted under the claim. The
complainant says the insurer’s proposed repairs to the damaged flooring is inadequate and
that the flooring must be removed completely including from under the frames (underneath
the internal and external wall studs), which will require lifting of the home. This is based on
the views from engineering consultants ‘B’ .
Determination | Case number: 880501 Page 3 of 7
The insurer says repairing the flooring does not require complete replacement including lifting
of the home. Rather, it is reasonable to cut the flooring out and leave the sections
sandwiched under the frame in place and encapsulating them for microbial control. The
insurer says there is no evidence of damage to the sections of the particle board under the
frame. The panel notes the complainant has provided a video showing evidence of flaking off
of the particle floorboard. The panel accepts the particle floorboard has suffered damage and
is flaking, however, the video does not show that this extends to the flooring sections under
the frame.
The panel notes B does not provide a persuasive explanation, scope of works or a quote for
its proposed total flooring replacement. Further, there is no information from B
countering/addressing the insurer’s proposed scope of works and method of repair. Neither
the complainant n or B have provided any information to show the insurer’s proposed repairs
to the flooring are not possible, are inadequate or that they do not meet relevant building
codes, standards or practices.
Having considered all the expert reports and photos, the panel notes the damage to the
flooring is not consistent across all areas of home, despite the flood levels being equal across
these areas. This has been explained to be due to the different sections of the home having
been constructed at different times, with the more recent flooring sections presenting with no
water damage at all.
Without persuasive information to the contrary, the panel is of the opinion it is reasonable to
accept the extent of water damage to the flooring varies and is not consistent throughout the
home. The panel accepts the insurer has been successful in showing its assessment and
proposed repairs to the flooring are fair and consistent with its obligations under the policy.
Insurer is to increase its settlement for the kitchen repairs
The insurer relies on a scope of works and associated cost of repairs provided by building
consultants ‘AC’ dated 15 May 2023, in the amount of $ 334,743.47. However, the
complainant is seeking cover for repairs in line with the scope of works and quote provided by
building consultants ‘MC’ dated 2 March 2023 , in the amount $457,644.19.
In reviewing the costings, the panel notes there is a significant difference between the cost of
the kitchen repairs in these quotes . The insurer says the complainant’s quote is for an
upgraded kitchen but has not supported this with compelling information. Similarly, the
complainant has not provided any compelling information to show his preferred quote for the
kitchen repairs is like for like to the kitchen in place at the time of loss.
Having considered the available information, the panel accepts that the complainant’s quote
more likely represents the cost of an upgraded custom-made kitchen. In the interest of
bringing this matter to conclusion and considering what is fair in the circumstances, the panel
is satisfied it is reasonable to use an average of the two quotes to calculate a fair settlement
relating to:
kitchen/benchtops
overhead storage
splash back
appliances.
The insurer ’ s quote for these items comes to a total of $12,062.45, whilst th e complainant’s
quote totals $46,238, and therefore the average of both comes to $29,150.22. This would
reduce the complainant’s quote from MC by $17,087.78.
Determination | Case number: 880501 Page 4 of 7
It is fair to rely on the MC quote with some adjustments as basis for settlement
The panel notes the insurer’s position that AC’s quote is an actionable quote, however, the
complainant has raised concerns in this regard. The insurer was requested to provide a
response on whether AC would be willing to complete the repairs for the complainant as a
private individual for the listed amount on the scope of works, to which the insurer failed to
provide a response.
Regardless, having considered all the information, the panel is not convinced AC’s quote is a
fair reflection of the cost of building repairs. The available information shows AC repeatedly
failed to provide an adequate and accurate scope of works and repair quote, which would
have the effect of minimising the insurer’s liability under the claim. The panel feels this goes
to the credibility of AC as an independent consultant as well as the fairness of its proposed
scope of works and quote. Given this, the panel has less faith in AC’s quote as a basis for a
fair settlement under the policy.
The panel accepts due to AC’s repeated failure to pro vide a complete and fair scope of works
and quote, the complainant has lost faith in its independence and competency. The panel
accepts it is not unreasonable that the complainant has advised he is no longer open to co-
operating with or allowing AC access to his home. Accordingly, considering what is fair in the
circumstances, the panel is satisfied the claim settlement is to be based on MC’s scope of
works and quote, subject to some changes discussed below.
Settlement is to be based on the MC’s quote subject to amendments
M C’s quote dated 2 March 2023 is for a total of $457,644.19. However, the panel is satisfied,
in line with the matters considered above, the quote is to be reduced by $43,000.00 (cost to
remove and replace flooring from under wall framing) and $17,087.78 (relating to the kitchen
repairs). The panel accepts these reductions will also impact on the 20% builders margin and
GST components of MC ’s quote, which needs to be considered.
Accordingly, having deducted the above amounts and the impact this will have on the
builder’s margin and GST components, the total comes to $378,393.32. The panel is satisfied
this amount is to be increased by a further 10% contingency payment, which brings the final
claim settlement payment for the building repairs to $416,077.56. The insurer is to pay
interest on this amount in line with section 57 of the Insurance Contracts Act 1984 , from 2
March 2023, to the date on which the payment is issued to the complainant.
The insurer is to pay this to the complainant within 14 days of receiving notice of the
complainant’s acceptance of this determina tion. In addition to the above, the insurer is to also
pay the $11,700 offered towards temporary accommodation, which the panel accepts is
reasonable.
In the interest of completeness, the panel notes the parties ’ positions regarding the solar
panel system. The panel notes the insurer has requested the complainant provide a report
establishing the solar panel system is damaged and that this is due to the flood event. The
panel accepts this is reasonable, and that the complainant is to arrange for a report on the
solar panel system when this is possible and provide it to the insurer for consideration.
2.2 Is the insurer liable for contents beyond the sum insured?
No. The insurer has paid the complainant his maximum entitlement for contents loss or
damage under the policy.
Determination | Case number: 880501 Page 5 of 7
The insurer has not caused the complainant to suffer further loss
There is no dispute the insurer has paid the complainant $143,800.00 towards loss or
damage to the insured contents under the claim. Further, this represents the complainant’s
maximum entitlement under the policy, considering his elected total contents sum insured and
enthusiast cover.
The complainant says the insurer ’s management of the contents component of the claim was
poor. Further, that this resulted in unreasonable delays which have caused further damage to
previously undamaged or salvageable contents. The complainant says the insurer left him
with no option other than to store the undamaged contents under the flood damaged house
on top of a tarp.
The insurer refutes the complainant’s assertions and says its management of the contents
loss was reasonable and it did not cause any unreasonable delays. The insurer notes the
claim occurred after a significant event and that it did the best it could in the circumstances
with some matters being outside its control such as delivery of the shipping container. This
was not possible straight away due to saturated ground preventing the truck to safely deliver
the storage container.
The panel notes the complainant does not accept the insurer’s position. However, in the
panel ’s view having considered the exchanged information, the panel accepts the insurer’s
overall management of the contents claim was reasonable in the circumstances. The panel
accepts there have been errors and delays by the insurer under the building component of
the claim, this will be considered under section 2.3 below.
Given the above, the panel is not satisfied there is persuasive information in support of the
complainant’s position. The panel believes it would be unfair to require the insurer to pay the
complainant more than his elected sum insured, being full entitlement under the policy for
damage to his contents. The panel is not satisfied the insurer is liable for any additional
damage to contents after the flood event.
The insurer is not required to take any further action relating to the contents.
2.3 Is the complainant entitled to compensation?
Yes. The insurer is to pay the complainant $3,500 in NFL in line with the AFCA Rules.
AFCA Rules allow for an award of NFL
The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
The insurer mismanaged the building component of the claim
The complainant says the insurer mishandled the claim and caused significant delays and
made several errors in the scope of works which resulted in an unreasonable degree of stress
and inconvenience. The insurer says it is entitled to assess the claimed damage and to
determine the fair and reasonable method and cost of repairs.
The panel accepts the insurer is entitled to assess its liability under a claim. However, such
assessments are to be completed in a manner and to a level expected of a professional
organisation. The panel is not satisfied the insurer’s management of the building component
Determination | Case number: 880501 Page 6 of 7
of the claim was reasonable, rather, it is fair to accept the level of service in this regard was
poor.
The insurer’s management of the building assessment process and associated finalisation of
the scope of works to be accepted under the claim as well as its liability under the policy
resulted in undue levels of stress, anxiety, inconvenience and delays. This poor level of
service and associated delays by the insurer also continued through the AFCA complaint
review process.
Given this, the panel is satisfied it is fair that the insurer be required to pay the complainant
$3,500 in NFL within 14 days of receiving notice of the complainant’s acceptance of this
determination.
The Rules allow for an award towards professional costs
Under Rule D.5 of the AFCA Rules, the panel can require the insurer to contribute to the legal
or professional costs up to $5,000, incurred by the complainant in the course of the complaint.
The complainant is seeking reimbursement of legal expenses as well as expenses incurred in
obtaining several expert reports over the course of the claim. The panel is not satisfied the
complainant’s appointment of legal consultants was necessary or reasonable in the
circumstances. Further, the panel is not satisfied the appointment of, and information
provided by engineers B has assisted in the assessment of the claim and this complaint.
However, the panel accepts the appointments of and information provided by MC and ‘VS’
have assisted in the assessment of the claim as well as this complaint. Accordingly, the
insurer is to reimburse the complainant $660 for MC’s report based on the invoiced dated 7
March 2023 and $2 ,035 for VS’s invoice dated 30 August 2022. These payments are to be
arranged within 14 days of recei ving notice of the complainant’s acceptance of this
determination.
2.4 Why is the outcome fair?
The outcome is fair because the exchanged material establishes the insurer is entitled to
settle the claim on the basis the insured building is repairable, but it is to increase its final
claim settlement. The complainant has been paid his maximum entitlement under the policy
for contents damage and it is fair the insurer pays the complainant NFL and a contribution
towards professional costs.
Determination | Case number: 880501 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an industry professional.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.