Home / Suncorp Group / Determination 880501

Determination 880501

Flood claim: dispute over building repair settlement amount, contents settlement and claim handling delays

FirmSuncorp Group
Decided2023-08-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$427,778
Non-financial loss$3,500
Amount claimed$446,800
SourceAFCA PDF

Summary

The complainant disputed the insurer's settlement of a flood claim on building and contents and its handling of the claim. AFCA required the insurer to increase the building settlement to $416,077.56 plus $11,700 accommodation, with interest, pay $3,500 non-financial loss and reimburse $2,695 of expert costs, but found no further contents liability.

The insurer was entitled to treat the building as repairable, but its scope and quote were unreliable so settlement was based on the complainant's quote with adjustments, while contents were capped at the sum insured and poor building claim handling warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 880501 Financial firm AAI Limited Determination | Case number: 880501 Page 1 of 7 Case number: 880501 11 August 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy (policy) with the financial firm (insurer). On 23 February 2022, the complainant lodged a claim for damage to the insured property following a flood event. The insurer has accepted the claim. However, the complainant remains dissatisfied with the insurer ’s settlement for damage to the insured contents as well as its final settlement offer for the damage to the insured building. Further, the complainant is dissatisfied with the insurer’s management of the claim and the delays experienced, which he says has contributed to further loss. 1.2 Issues and key findings Is the insurer required to increase its claim settlement offer? Yes. Although the insurer is not required to pay the complainant the total building sum insured of $446,800.00, it is to increase its final claim settlement in line with this determination. Is the insurer liable for contents damage beyond the sum insured? No. The insurer is not required to pay anything further towards the contents damage, for which it has cash settled the complainant to his maximum entitlement under the policy ($143,800.00). Is the complainant entitled to compensation? Yes. The available information shows the insurer’s management of the building component of the complainant’s claim did result in undue levels of stress, inconvenience and delays . The insurer is to pay the complainant $3,500 in non-financial loss compensation (NFL). The insurer is to reimburse the complainant for expert related expenses up to $5,000, excluding the legal expenses and report from engineers ‘B’. Why is the outcome fair? The outcome is fair because the exchanged material establishes the insurer is entitled to settle the claim on the basis the insured building is repairable, but it is to increase its final claim settlement. The complainant has been paid his maximum entitlement under the policy for contents damage and it is fair the insurer pays the complainant NFL. 1.3 Determination This is outcome is partly in favour of the complainant. The insurer is to settle the claim in line with this determination. Determination | Case number: 880501 Page 2 of 7 2 Reasons for determination 2.1 Is insurer required to increase its claim settlement offer? Yes. The insurer is to increase the final claim settlement amount offered for the damage to the insured building. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Flood ’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The complainant has shown damage that triggers cover under the policy There is no dispute the insured property was inundated by water on or about 23 February 2022 due to a significant flood event. The insurer accepts this event has caused significant damage to the complainant’s home and contents. The insurer has paid the complainant $143,800.00 towards damage to the contents , which represents the complainant’s maximum entitlement under the contract for contents. The insurer has offered to settle the building component of the claim by way of a final cash settlement of $397,965.99, which includes $11,700 towards temporary accommodation for six months and a 15% contingency payment. The complainant says this offer is not adequate to cover the building damage and the insurer should be required to pay the maximum policy sum insured amount of $446,800.00. The insurer says its settlement of the complainant’s contents loss is reasonable and in line with its policy obligations. Further, that its assessment of and associated claim settlement offer for the building damage is also consistent with its obligations under the policy. The insurer has refused to increase its final claim settlement. The panel has carefully considered the significant amount of information provided by and exchanged between the parties. Given all the material has been exchanged with the parties, the panel does not intend to reiterate all this information within this determination. The panel notes for the most part, the parties agree on the exhaustive list of building repairs, however, there are certain aspects of the proposed repairs that remain in contention, these will be considered below. The insurer ’ s proposed method of floor repairs is reasonable The parties have each sourced reports from various building and engineering consultants in support of their positions relating to the repairs to be accepted under the claim. The complainant says the insurer’s proposed repairs to the damaged flooring is inadequate and that the flooring must be removed completely including from under the frames (underneath the internal and external wall studs), which will require lifting of the home. This is based on the views from engineering consultants ‘B’ . Determination | Case number: 880501 Page 3 of 7 The insurer says repairing the flooring does not require complete replacement including lifting of the home. Rather, it is reasonable to cut the flooring out and leave the sections sandwiched under the frame in place and encapsulating them for microbial control. The insurer says there is no evidence of damage to the sections of the particle board under the frame. The panel notes the complainant has provided a video showing evidence of flaking off of the particle floorboard. The panel accepts the particle floorboard has suffered damage and is flaking, however, the video does not show that this extends to the flooring sections under the frame. The panel notes B does not provide a persuasive explanation, scope of works or a quote for its proposed total flooring replacement. Further, there is no information from B countering/addressing the insurer’s proposed scope of works and method of repair. Neither the complainant n or B have provided any information to show the insurer’s proposed repairs to the flooring are not possible, are inadequate or that they do not meet relevant building codes, standards or practices. Having considered all the expert reports and photos, the panel notes the damage to the flooring is not consistent across all areas of home, despite the flood levels being equal across these areas. This has been explained to be due to the different sections of the home having been constructed at different times, with the more recent flooring sections presenting with no water damage at all. Without persuasive information to the contrary, the panel is of the opinion it is reasonable to accept the extent of water damage to the flooring varies and is not consistent throughout the home. The panel accepts the insurer has been successful in showing its assessment and proposed repairs to the flooring are fair and consistent with its obligations under the policy. Insurer is to increase its settlement for the kitchen repairs The insurer relies on a scope of works and associated cost of repairs provided by building consultants ‘AC’ dated 15 May 2023, in the amount of $ 334,743.47. However, the complainant is seeking cover for repairs in line with the scope of works and quote provided by building consultants ‘MC’ dated 2 March 2023 , in the amount $457,644.19. In reviewing the costings, the panel notes there is a significant difference between the cost of the kitchen repairs in these quotes . The insurer says the complainant’s quote is for an upgraded kitchen but has not supported this with compelling information. Similarly, the complainant has not provided any compelling information to show his preferred quote for the kitchen repairs is like for like to the kitchen in place at the time of loss. Having considered the available information, the panel accepts that the complainant’s quote more likely represents the cost of an upgraded custom-made kitchen. In the interest of bringing this matter to conclusion and considering what is fair in the circumstances, the panel is satisfied it is reasonable to use an average of the two quotes to calculate a fair settlement relating to:  kitchen/benchtops  overhead storage  splash back  appliances. The insurer ’ s quote for these items comes to a total of $12,062.45, whilst th e complainant’s quote totals $46,238, and therefore the average of both comes to $29,150.22. This would reduce the complainant’s quote from MC by $17,087.78. Determination | Case number: 880501 Page 4 of 7 It is fair to rely on the MC quote with some adjustments as basis for settlement The panel notes the insurer’s position that AC’s quote is an actionable quote, however, the complainant has raised concerns in this regard. The insurer was requested to provide a response on whether AC would be willing to complete the repairs for the complainant as a private individual for the listed amount on the scope of works, to which the insurer failed to provide a response. Regardless, having considered all the information, the panel is not convinced AC’s quote is a fair reflection of the cost of building repairs. The available information shows AC repeatedly failed to provide an adequate and accurate scope of works and repair quote, which would have the effect of minimising the insurer’s liability under the claim. The panel feels this goes to the credibility of AC as an independent consultant as well as the fairness of its proposed scope of works and quote. Given this, the panel has less faith in AC’s quote as a basis for a fair settlement under the policy. The panel accepts due to AC’s repeated failure to pro vide a complete and fair scope of works and quote, the complainant has lost faith in its independence and competency. The panel accepts it is not unreasonable that the complainant has advised he is no longer open to co- operating with or allowing AC access to his home. Accordingly, considering what is fair in the circumstances, the panel is satisfied the claim settlement is to be based on MC’s scope of works and quote, subject to some changes discussed below. Settlement is to be based on the MC’s quote subject to amendments M C’s quote dated 2 March 2023 is for a total of $457,644.19. However, the panel is satisfied, in line with the matters considered above, the quote is to be reduced by $43,000.00 (cost to remove and replace flooring from under wall framing) and $17,087.78 (relating to the kitchen repairs). The panel accepts these reductions will also impact on the 20% builders margin and GST components of MC ’s quote, which needs to be considered. Accordingly, having deducted the above amounts and the impact this will have on the builder’s margin and GST components, the total comes to $378,393.32. The panel is satisfied this amount is to be increased by a further 10% contingency payment, which brings the final claim settlement payment for the building repairs to $416,077.56. The insurer is to pay interest on this amount in line with section 57 of the Insurance Contracts Act 1984 , from 2 March 2023, to the date on which the payment is issued to the complainant. The insurer is to pay this to the complainant within 14 days of receiving notice of the complainant’s acceptance of this determina tion. In addition to the above, the insurer is to also pay the $11,700 offered towards temporary accommodation, which the panel accepts is reasonable. In the interest of completeness, the panel notes the parties ’ positions regarding the solar panel system. The panel notes the insurer has requested the complainant provide a report establishing the solar panel system is damaged and that this is due to the flood event. The panel accepts this is reasonable, and that the complainant is to arrange for a report on the solar panel system when this is possible and provide it to the insurer for consideration. 2.2 Is the insurer liable for contents beyond the sum insured? No. The insurer has paid the complainant his maximum entitlement for contents loss or damage under the policy. Determination | Case number: 880501 Page 5 of 7 The insurer has not caused the complainant to suffer further loss There is no dispute the insurer has paid the complainant $143,800.00 towards loss or damage to the insured contents under the claim. Further, this represents the complainant’s maximum entitlement under the policy, considering his elected total contents sum insured and enthusiast cover. The complainant says the insurer ’s management of the contents component of the claim was poor. Further, that this resulted in unreasonable delays which have caused further damage to previously undamaged or salvageable contents. The complainant says the insurer left him with no option other than to store the undamaged contents under the flood damaged house on top of a tarp. The insurer refutes the complainant’s assertions and says its management of the contents loss was reasonable and it did not cause any unreasonable delays. The insurer notes the claim occurred after a significant event and that it did the best it could in the circumstances with some matters being outside its control such as delivery of the shipping container. This was not possible straight away due to saturated ground preventing the truck to safely deliver the storage container. The panel notes the complainant does not accept the insurer’s position. However, in the panel ’s view having considered the exchanged information, the panel accepts the insurer’s overall management of the contents claim was reasonable in the circumstances. The panel accepts there have been errors and delays by the insurer under the building component of the claim, this will be considered under section 2.3 below. Given the above, the panel is not satisfied there is persuasive information in support of the complainant’s position. The panel believes it would be unfair to require the insurer to pay the complainant more than his elected sum insured, being full entitlement under the policy for damage to his contents. The panel is not satisfied the insurer is liable for any additional damage to contents after the flood event. The insurer is not required to take any further action relating to the contents. 2.3 Is the complainant entitled to compensation? Yes. The insurer is to pay the complainant $3,500 in NFL in line with the AFCA Rules. AFCA Rules allow for an award of NFL The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The insurer mismanaged the building component of the claim The complainant says the insurer mishandled the claim and caused significant delays and made several errors in the scope of works which resulted in an unreasonable degree of stress and inconvenience. The insurer says it is entitled to assess the claimed damage and to determine the fair and reasonable method and cost of repairs. The panel accepts the insurer is entitled to assess its liability under a claim. However, such assessments are to be completed in a manner and to a level expected of a professional organisation. The panel is not satisfied the insurer’s management of the building component Determination | Case number: 880501 Page 6 of 7 of the claim was reasonable, rather, it is fair to accept the level of service in this regard was poor. The insurer’s management of the building assessment process and associated finalisation of the scope of works to be accepted under the claim as well as its liability under the policy resulted in undue levels of stress, anxiety, inconvenience and delays. This poor level of service and associated delays by the insurer also continued through the AFCA complaint review process. Given this, the panel is satisfied it is fair that the insurer be required to pay the complainant $3,500 in NFL within 14 days of receiving notice of the complainant’s acceptance of this determination. The Rules allow for an award towards professional costs Under Rule D.5 of the AFCA Rules, the panel can require the insurer to contribute to the legal or professional costs up to $5,000, incurred by the complainant in the course of the complaint. The complainant is seeking reimbursement of legal expenses as well as expenses incurred in obtaining several expert reports over the course of the claim. The panel is not satisfied the complainant’s appointment of legal consultants was necessary or reasonable in the circumstances. Further, the panel is not satisfied the appointment of, and information provided by engineers B has assisted in the assessment of the claim and this complaint. However, the panel accepts the appointments of and information provided by MC and ‘VS’ have assisted in the assessment of the claim as well as this complaint. Accordingly, the insurer is to reimburse the complainant $660 for MC’s report based on the invoiced dated 7 March 2023 and $2 ,035 for VS’s invoice dated 30 August 2022. These payments are to be arranged within 14 days of recei ving notice of the complainant’s acceptance of this determination. 2.4 Why is the outcome fair? The outcome is fair because the exchanged material establishes the insurer is entitled to settle the claim on the basis the insured building is repairable, but it is to increase its final claim settlement. The complainant has been paid his maximum entitlement under the policy for contents damage and it is fair the insurer pays the complainant NFL and a contribution towards professional costs. Determination | Case number: 880501 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as an industry professional. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.