Home / Hollard / Determination 880490

Determination 880490

Partial claim decline for storm/water damage under exclusions, settlement conditions and non-financial loss

FirmHollard
Decided2023-05-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$14,654
Non-financial loss$1,000
Amount claimed$75,000
SourceAFCA PDF

Summary

The insurer accepted a storm-related home claim but excluded cracking and internal damage as pre-existing, inherent defects or maintenance-related. AFCA required payment of $14,654 for covered items without a deed of release plus a further $1,000 non-financial loss.

The proximate cause was lack of subfloor ventilation, drainage and excessive moisture, so inherent defect and maintenance exclusions applied, but the deed of release requirement was unfair and claim handling warranted further compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 880490 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 880490 Page 1 of 9 Case number: 880490 15 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). He lodged a claim on 5 March 2022 for damage to his property which he says was due to excessive water being trapped under the house. The insurer accepted the claim and agreed to cover some of the damage. However, it has excluded cover for the damage which it says is pre-existing or a result of inadequate subfloor ventilation or drainage. It says that such damage is excluded under the policy. The complainant disagrees with the insurer and seeks that all the damage is covered. 1.2 Issues and key findings Is the insurer required to cover more of the damage? No. The insurer has agreed to cover the deck repair and the covered items. The insurer is not required to indemnify the complainant for the cracking damage or the other internal damage (mould and floorboards) since the inherent defects and maintenance exclusions/conditions will apply. Is the insurer’s settlement of the claim fair ? No. In addition to the deck settlement, the insurer should pay the complainant $14,654 for the covered items without the requirement that he sign a deed of release. The insurer is otherwise not required to make any payment in relation to the cracking or other internal damage as they are excluded from cover. Is the complainant entitled to further compensation? Yes. The insurer’s offer of $14,654 for the covered items includes $2,000 in compensation. In the circumstances of this claim, it is reasonable that the insurer pays the complainant a further $1,000 in compensation. Why is the outcome fair? The insurer’s offer of $14,654 for the covered items is fair and reasonable and it is fair that the complainant receive a further $1,000 in non-financial loss compensation. The damage is otherwise excluded under the policy. It would not be fair to require the insurer to pay for the repair of the damage in the circumstances. 1.3 Determination This determination is partially in favour of the insurer. If the complainant accepts the determination, the insurer must within 14 days:  pay the complainant $14,654 for the covered items without requiring it to sign a deed; and  pay the complainant an additional $1,000 for non-financial loss compensation. Determination | Case number: 880490 Page 2 of 9 2 Reasons for determination 2.1 Is the insurer required to cover more of the damage? No. The insurer has agreed to cover the deck repair and the covered items. The insurer is not required to indemnify the complainant for the cracking damage or the other internal damage (mould and floorboards) since the inherent defects and maintenance exclusions/conditions will apply. Policy covers insured events subject to exclusions The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. The insured events are set out in the PDS and include storm. The policy does however exclude cover for damage which is caused by, amongst other things:  gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deter ioration from exposure to light…  inherent defects, structural faults, faulty workmanship or faulty design;  failure to maintain the property in good repair…  any earth movement or vibration including erosion, subsidence…not directly caused by…storm…; The PDS also says it is a condition of cover that the insured ‘[k]eep [the] building and contents in good condition and well maintained’. This includes ‘[e]nsuring that all building maintenance or repairs to the building and/or contents are undertaken by an appropriately qualified person or licenced tradesmen ’. The policy furt her states that ‘[a] ny loss or damage or liability or costs or expenses arising from your failure to maintain your building and contents in a good state of repair and condition will not be covered under the policy ’. Parties do not dispute that there is a claimable loss The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. The complainant says the property has been damaged as a result of the storm event and I accept there is evidence of damage. In its notice of response dated 19 September 2022, the insurer states that ‘the claim has been acce pted and [it is] awaiting further specialist quotes to Determination | Case number: 880490 Page 3 of 9 be able to provide a SOW to determine the settlement under the terms and conditions of the policy’. Therefore, there is no dispute that a claimable loss has been established. The onus therefore shifts to the insurer to establish that the damage is excluded from cover. Insurer provided reports commenting on the cause of the damage The insurer issued its claim decision on 6 October 2022. It stated that it will cover the cost to repair the deck (deck offer) and certain other items (the covered items). However, it said it would not cover the cost of installing mechanical ventilation under the property. It also declined cover for the internal/external cracking and the other internal damage (mould, floorboards, etc) at the property. The claim decision also recommended a number of maintenance issues be addressed. The insurer relies on various expert reports to decline cover for the other damage. The report from its builder, AB, says:  there is no evidence that the cupping of the internal timber floors has been caused by an insured event;  cracks in the wall linings are consistent with building movement. They are also in close proximity to the cracks noted in the pre-purchase inspection report obtained by the complainant in 2017. However, the cracks are structurally sound and there are no major rectification requirements;  there is an excessive moisture build up in the subfloor. No visible damage was noted as a result of the saturated ground. The pre-purchase inspection report also refers to issues of moisture and mould due to water not being able to flow through the house;  cracking was noted to the paving around the pool which has been present since 2017;  minor ongoing leaks were detected in the laundry, ensuite and bathroom. However, they are not contributing to the damage being claimed;  no damage noted at the property can be attributed to a single insured event; and  the high humidity issue in the house is not event related and will require ongoing preventative measures; The insurer refers to a report from its previous engineer, SC, who was engaged in relation to the 2019 claim. SC states:  based on its non-destructive visual inspection, certain maintenance works should be carried out at the property: > install grated drains around front left of property to be discharged into inground stormwater lines; > install additional stormwater provisions below the left rear decking and connect into the existing stormwater lines;  the maintenance works recommended are intended to mitigate the subfloor moisture ingress however, due to its low-set nature, will likely be difficult to resolve in its entirety. As such future high moisture within the subfloor will likely create an ongoing mould risk to the dwelling; and  the findings were discussed with the complainant via telephone after the inspection. The insurer also engaged an engineer, CL, who says:  there is evidence of previous damage throughout the building and variations in the floor levels. The cracking is as a result of soil upheaval on the northeast and southwest sides as confirmed by the floor level survey; Determination | Case number: 880490 Page 4 of 9  the internal/external cracking damage has been taking place over an extended period due to long term seasonal moisture variation in the highly reactive clay soil;  the timber deck floorboards have been damaged due to exposure to moisture during the storm event as they are susceptible to moisture that caused their expansion;  the observed dampness of the subfloor and mould growth is unrelated to a single defined event such as a storm but, rather, has been caused by the rising damp/compromised damp proof membrane;  the following maintenance work should be carried out: > a damp proof membrane should be installed at a level under the timber bearer/joists in the subfloor; > the number of subfloor vents should be increased and powered subfloor ventilation used; and > extra ground/surface drainage should be installed to divert stormwater away from the house footings. The insurer further refers to the complainant’s pre -purchase building report from PPI, which states:  at the time of the inspection the subfloor appeared to be generally wet in areas;  the downpipe was not connected to a stormwater pipe;  moisture is entering the subfloor from the front of the house. Due to the flat ground levels, some of the water is not flowing through and has caused damp conditions in a few areas; and  the subfloor ventilation was generally inadequate and additional ventilation points are recommended to assist in drying out the damp conditions. The insure r says ‘the policy wording is clear in its explanation that the property must be maintained and in good condition and that it is evident that the damage has been occurring for a period of time before the property was purchased by the Complainant, which has all been highlighted in the pre-purchase report as noted above and evident before the Complainant’s policy was placed on risk’ . The insurer has obtained a report from a hygienist, RI, who says:  dampness to the subsoil, brick piers and the lowermost section of the external wall around the perimeter of subfloor space was identified, consistent with the reported event;  visible environmental surface mould was identified on various surfaces throughout the property and is consistent with prolonged high indoor humidity levels;  the underside of the timber floorboards is insulated to prevent thermal bridging;  the surface samples conducted indicated a normal fungal ecology on the surfaces sampled;  psychometric testing conducted indicates that there is no excess moisture or humidity inside the property due to dampness in the subfloor space. However, this could have been impacted by the central heating and portable dehumidifiers that were running prior to the assessment; and  a qualified drainage expert should be engaged to assess on better drainage of the subfloor space/property. Therefore, based on the above, the insurer says the damage to the complainant’s property has not been caused by a single defined event but gradual deterioration over a period of time, faulty workmanship, subsidence and a failure to maintain the property in good repair. These are all excluded under the terms and conditions of the policy. It says it is not required to indemnify the complainant for costs specifically excluded under the terms and conditions of the policy. Determination | Case number: 880490 Page 5 of 9 Complainant says damage caused by insured event The complainant says:  he completed the maintenance recommended by the insurer in 2019 and the damage is still occurring;  since he has completed the works, the insurer is liable for any further damage that occurs ; and  the judgment in the NCAT proceeding confirms that the maintenance works recommended by the insurer in 2019 were completed. The insurer’s builder, AB, also confirms the recommended maintenance works were completed. The complainant obtained a report from its own building expert, SW. It says:  the subfloor was wet at the time of the inspection and safe access was not possible;  the underside of timbers, including bearers and joist, could not be inspected as they were concealed by insulation;  cracked or broken PVC pipes were observed in the subfloor;  excessive dampness is starting to allow suspected mould growth to subfloor soil; and  the subfloor ventilation appeared to be adequate at the time of inspection. Proximate cause of the damage must be established The insurer needs to show the proximate cause of the damage being claimed was, on balance, excluded under the policy. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. On balance, the insurer is entitled to exclude certain damage under the policy Having reviewed all the available information, on balance, I am satisfied that the insurer has established that the policy exclusion applies to the cracking and other internal damage. I accept the evidence of the insurer’s experts that the cracking damage was pre -existing and evidenced at the time of the pre-purchase property inspection or is an extension of the pre- existing cracking. The insurer’s experts also say it i s caused by settlement of the building and has taken place over an extended period due to long term seasonal moisture variation in the highly reactive clay soil . The complainant’s expert , SW, also agrees with this. Therefore, the gradual deterioration and/or maintenance exclusions will apply to exclude cover for this damage. The complainant submitted his pre-property inspection report from PPI and SW’s report in support of his claim. However, I do not consider they assist him. The PPI report identifies pre-existing sub-floor drainage issues prior to the purchase of the property and the insurer coming on risk. It states that due to the moisture on the ground of the subfloor, some areas of mould were developing on the soil and several frogs were seen in the subfloor because of the moisture. The PPI report notes the issues with the subfloor drainage and ventilation and expressly states that ‘[a]dvice must be sought by a licensed plumber to rectify any areas where surface water is collecting or pooling’. However, the complainant has not provided any Determination | Case number: 880490 Page 6 of 9 reports to show that it acted on PPI’s advice. Further, in 2022, SW says excessive dampness in the subfloor soil was starting to allow suspected mould growth to the subfloor and rising damp was detected. It also identified a possible failed water membrane to the shower area may have contributed to the moisture. SW’s report makes no mention of an insured event having caused the damage. SW also recommends a specialist be engaged to evaluate and repair the rising damp. I accept the complainant did carry out the maintenance works recommended by the insurer’s engineer, SC, in 2019 after a separate flood event. However, this does not negate PPI’s advice. SC also did say that the maintenance works are intended to mitigate the subfloor moisture ingress however, it will likely be difficult to resolve in its entirety. As such future high moisture within the subfloor will likely create an ongoing mould risk to the dwelling. I accept SC’s statement in its report that it communicated this information to the complainant by telephone. On this basis, I do not accept the completion of the maintenance works means that the insurer is liable for any subsequent moisture damage to the property. CLS is also of the opinion that the damage and issues identified have been occurring for some time and not from a single defined event. I also accept that the issues with the subfloor and dampness has caused the damage. The issue of dampness has been ongoing with water pooling in the subfloor following a rain event. Mould was identified growing in some areas of the subfloor. The damaged stormwater pipe may have had some affect however it is not the proximate cause of the damage. In his email dated 22 November 2022 the complainant says ‘The pipe was obviously adding to that but isn’t the only issue as we’ve had more rain since, not as heavy and we are still getting excessive water trapped in the sub floor area’. Having reviewed all the available information, I am satisfied the proximate cause of the damage is the lack of subfloor ventilation and drainage and excessive moisture. Therefore, the inherent defects and maintenance exclusions/conditions will apply. The complainant should seek the services of an appropriately qualified expert to report on the cause of the water pooling and issues in the subfloor and how best to fix this. Accordingly, I am satisfied, on balance, that the insurer is entitled to exclude cover for the cracking damage and other internal damage. 2.2 Is the insurer’s settlement of the claim fair ? No. In addition to the deck settlement, the insurer should pay the complainant $14,654 for the covered items without the requirement that he sign a deed of release. The insurer is otherwise not required to make any payment in relation to the cracking or other internal damage as they are excluded from cover. Insurer has made offers in relation to certain parts of the claim The insurer issued its claim decision on 6 October 2022. It stated that it will cover the cost to repair the deck in the amount of $16,324 (deck offer). It also acknowledged the delay in responding to the claim and offered to pay for the covered items. This includes reimbursement of the cost to repair the stormwater pipe ($700), the cost of running the dehumidifiers, the increase in electricity costs, the expert report ($550), painting ($7,000), a general sanitisation by a hygienist before the occupants moved back into the property and $2,000 in compensation as a gesture of good faith. Determination | Case number: 880490 Page 7 of 9 The complainant subsequently provided two quotes for the deck repair for $23,936.00 and $28,050.00. As a result, the insurer increased the deck offer and agreed to cash settle the complainant for the deck repair in the sum of $28,050.00 (deck settlement). The complainant says its total out of pocket expenses (including the deck) are approximately $75,000. However, he is prepared to accept $13,598 for the covered items (in addition to the deck settlement). The insurer has offered $1,056 for the mould clean. Therefore, the insurer is prepared to pay the complainant the sum of $14,654 ($13,598 plus $1,056) for the covered items, subject to the complainant signing a deed of release. However, the complainant has refused to sign a deed. Insurer must pay for covered items and compensation without deed On balance, I consider the insurer’s offer in relation to the covered items is reasonable (subject to my comments below regarding compensation). I do not, however, consider it is reasonable to require the complainant to enter into a deed of settlement. The insurer has requested that the complaint sign a deed which, in part, terminates all entitlements the complainant has or may have had arising out of the claim, the complaint, the insured property or the policy as the deed seeks to do. I do not consider this is fair or required in the circumstances. Therefore, I do not consider the complainant should be required to enter into a deed of release. Accordingly, I am satisfied that the insurer should pay the complainant $14,654 for the covered items without the deed or any other conditions being imposed. 2.3 Is the complainant entitled to further compensation? Yes. The insurer’s offer of $14,654 for the covered items includes $2,00 0 in compensation. In the circumstances of this claim, it is reasonable that the insurer pays the complainant a further $1,000 in compensation. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer’s offer of non -financial loss compensation is reasonable The insurer acknowledged there were delays and other issues in the claims handling process. As a result, its offer in relation to the covered items included $2,000 for non-financial loss compensation. I accept the complainant has clearly found the claim process very stressful and inconvenient and that it has had a significant impact on his life. The complainant says there have been a number of issues including that the first assessor did not even look under the house, it had to arrange its own repair of the stormwater pipe and mould specialist and it took the insurer 7 months to issue a decision on the claim. The effect of the delays, miscommunications and difficulties arranging temporary accommodation were also exacerbated by the fact that the Determination | Case number: 880490 Page 8 of 9 complainant’s wife was very heavily pregnant at the time and subsequently living with a newborn in temporary accommodation. In the circumstances, I consider it reasonable that the insurer pay the complainant a further $1,000 in compensation to the complainant. This is in addition to the $2,000 previously offered by the insurer. 2.4 Why is the outcome fair? The insurer’s offer of $14,654 for the covered items is fair and reasonable and it is fair that the complainant receive a further $1,000 in non-financial loss compensation. The damage is otherwise excluded under the policy. It would not be fair to require the insurer to pay for the repair of the damage in the circumstances. Determination | Case number: 880490 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.