Escape of liquid damage claim - extent of floor replacement liability
Summary
The complainant, a beneficiary under a strata policy, sought replacement of undamaged flooring after an escape of liquid event that the insurer accepted. AFCA found the insurer liable only for the damaged area, but ordered a 20% contingency uplift, interest, and $500 for delays.
The policy limits the insurer's liability to the damaged area only and does not require replacement of undamaged property, though a 20% contingency uplift is payable.
Issues
- Claim amount dispute primary · not upheld“The insurer is not liable for the undamaged sections of the flooring; insurer's liability limited to damaged area only.”
- Poor claim handling secondary · upheld“I accept there were unreasonable delays throughout the life of the claim... insurer should have been more proactive in finalising the claim.”
- Delay secondary · upheld“The claim was dormant from September 2021 until May 2022... I accept the insurer's handling of the matter has caused the complainant avoidable upset and inconvenience.”
Subjects and remedies
pay claimpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 880071
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 880071 Page 1 of 5
Case number: 880071 13 December 2022
1 Determination overview
1.1 Complaint
The complainant, who is a beneficiary under the policy held with the financial firm (insurer),
lodged a claim under the Owner’s Corporation residential strata insurance policy. This is for
the damage sustained to his unit following an escape of liquid event.
The insurer accepted the claim. The p arties dispute the extent of the loss and the insurer’s
liability under the policy.
The insurer says it is only liable for the damaged floor areas. The complainant disagrees and
wants the insurer to cover other areas in the apartment, so the flooring can achieve a uniform
appearance.
1.2 Issues and key findings
Is the insurer required to replace the disputed floor area?
No. This is because the insurer’s liability is limited to replacing the damaged area only.
Further, the insurer is not obligated to replace the undamaged areas to match.
However, the insurer is required to increase its settlement by 20% to allow for contingencies
and the transfer of risk to the complainant.
The insurer is required to pay the complainant $500 in non-financial loss compensation.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is not liable for the undamaged sections of the flooring.
Within 14 days of receiving notice the complainant accepts this determination, the insurer is
required to pay the complainant $14,505.92 being
$12,088.27 for the repairs
$2,417.65 being 20% for contingencies and the transfer of risk
less any policy deductions
plus interest in accordance with Section 57 of the Insurance Contracts Act 1984 from 4
December 2020 being the date of the quote until the date of the payment.
The insurer is also required to pay the complainant $500 in non-financial loss compensation.
Determination | Case number: 880071 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer required to replace the disputed floor area?
The complainant says the floor cannot be matched
There is no dispute
the flooring in the living area was damaged by an escape of liquid event
the insurer has accepted the water damage to the living room, including the replacement of
the entire flooring in that room.
The complainant says the existing flooring runs throughout the property and cannot be
matched or joined to a new flooring. He says the replacement floor requires the installation of
the metal strip in the door way which is unsightly and is a tripping hazard.
The exchanged evidence shows the flooring in living room is connected to the hallway and
kitchen. There is no noted damage to these areas. The exchanged evidence shows the
kitchen area and the hallway are separated from the living room by doors.
The policy does not allow for the replacement of the undamaged property
The insurer’s policy says the insurer has the discretion to either repair or pay for the repairs.
The policy clearly states the insurer retains the right to determine which method of settlement
to utilise when settling a claim. There is no dispute that the parties are open to a cash
settlement.
Further, the policy says if the materials used in the original construction are not readily
available, the insurer will use the nearest equivalent available material.
I note the policy defines ‘ replacement ’ as ‘ the reasonable costs of repairing or replacing to a
condition which is equivalent as when it was new ’ .
The policy recognises that it is not always possible to use an exact match for materials, as
materials change and/or are discontinued over time. Rather, the policy commits the insurer to
using materials that are the nearest equivalent to or substantially the same as existing.
The policy also states the insurer will not pay for the replacement of undamaged insured
property.
I accept the policy specifically limits t he insurer’s liability to the damaged area(s) only. That is,
the actual damaged floorboards. There is no ambiguity about the level of cover afforded
under the policy.
The insurer is not liable for the undamaged parts of the flooring
Having carefully reviewed the exchanged evidence and the parties’ argument, I accept the
insurer’s proposed settlement is fair and is in line with the policy’s intention.
There is no dispute the proposed replacement is not an exact match however the exchanged
evidence shows that the material is substantially the same.
Firstly, I note there is a door that separates the living from the undamaged sections of the
flooring. The same is applicable to the kitchen area. I accept a door is an architectural break
which limits and defines the dimension of a room. I consider it is fair to limit the insurer’s
liability to the same room.
Determination | Case number: 880071 Page 3 of 5
I note a corner section of the flooring in the living room was damaged and the insurer’s
settlement factors in the entire floor in that room. I accept this is a reasonable position to take.
Secondly, the complainant says the proposed strip (joining the living with the undamaged
floor sections) poses a trip hazard. There is no expert opinion to substantiate that. I accept
the use of a covering strip in that situation is consistent with industry practice.
Thirdly, the complainant says by replacing the flooring in the living area and not the rest of the
property, the insurer fails to put him back in the same position as he was prior to the loss. I do
not accept this argument.
The policy wording does not stipulate that the flooring throughout the property is to be
replaced. The policy is neither silent nor ambiguous on the undamaged portions. The
principals of indemnity are to be considered in light of the terms of the contract.
The complainant argues that the insurer has previously accepted to replace the entire
flooring, and that there was confusion about the wording in the original scope of works and
the variation.
In the variation, the insurer’s builder (PO) quoted the replacement of the undamaged portion
of the flooring. I do not accept the variation stipulates acceptance. Even if I were to accept the
insurer stated it will replace the undamaged flooring (which I do not), I am not satisfied the
complainant has established he has relied on this statement to his detriment.
The insurer is required to increase its settlement by 20%
The complainant disagrees with paying the policy deductions, being the excess, given the
loss is not due to a fault of his. The policy states the excess is the complainant’s contribution
towards a claim.
Further, the exchanged information shows the leak has initiated from another unit in the
complexAny issues with responsibility for payment of the excess are a matter between the
complainant and the insured owners’ corporation. The insurer is entitled to deduct the excess
from the settlement amount for the claim. PO has provided a quote for the reinstatement of
the property totalling $12,088.27. I consider it is fair the insurer increases its cash settlement
by 20% This is because I note the scope of works does not factor in:
any unforeseen damage
the transfer of risk resumed by the complainant due to the absence of the lifetime
guarantee
the passage of time, including the likely increase in costs in the current market since the
date of the quote
any volume discounts reflected in PO’s scope of works (and the fact that it is not stated as
being a quote actionable by the complainant as a retail customer).
Within 14 days of receiving notice the complainant accepts this determination, the insurer is
required to pay the complainant $14,505.92 being
$12,088.27 for the repairs
$2,417.65 being 20% for contingencies
less any policy deductions
plus interest in accordance with Section 57 of the Insurance Contracts Act 1984 from 4
December 2020 being the date of the quote until the date of the payment.
Determination | Case number: 880071 Page 4 of 5
The complainant is entitled to $500 compensation
AFCA may award compensation for non-financial loss (capped at $5,400) if there has been
an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and delays. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The complainant is dissatisfied with the manner in which the insurer handled the claim , mainly
the claim’s delays. The complainant says the claim has dragged on for two years.
I have carefully reviewed the exchanged evidence, I accept there were unreasonable delays
throughout the life of the claim.
The exchanged evidence shows:
the claim was lodged in November 2020
the insurer assessed the damage in December 2020
the insurer finalised its position regarding the extent of its liability by September 2021.
I accept there were challenges organising the assessment given there were numerous parties
involved such as the broker, the strata manager and the complainant.
The exchanged evidence shows the claim was dormant from September 2021 until May
2022. The exchanged evidence does not show the insurer has made reasonable attempts to
progress the claim or bring it to finality.
Whilst the remainder of the delays are related to the complai nant disputing the insurer’s
position regarding liability, I consider the insurer should have been more proactive in finalising
the claim. I accept the insurer’s handling of the matter has caused the complainant avoidable
upset and inconvenience.
The insurer is required to pay the complainant $500 in non-financial compensation due to the
claim’s delays.
2.2 Why is the outcome fair?
The insurer is entitled to rely on the terms and conditions of the policy in assessing and
determining the extent of its liability.
Determination | Case number: 880071 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.