Home / Suncorp Group / Determination 879310
Determination 879310
Amount of cash settlement and loss of rent for water damage claim, plus non-financial loss
Summary
The complainant's strata unit sustained water damage and the insurer offered a cash settlement, which she disputed with a higher quote. AFCA found the insurer's quote with a 20% contingency and 14 weeks of lost rent fair, and awarded $1,500 non-financial loss.
It was fair for the insurer to rely on its own quote with a 20% contingency, as the complainant's quote included unnecessary upgrades and lacked breakdowns, and delays warranted a conservative $1,500 award.
Issues
- Claim amount dispute primary · upheld
“The insurer should pay $50,842.68 for the repairs and lost rent... insurer's quote... should include a 20% contingency”
- Delay secondary · upheld
“I accept there were some unreasonable delays.”
- Repairs or contractors secondary · not upheld
“The information does not show it was done by the insurer's contractors.”
Subjects and remedies
home or building damagepay claimpay non financial loss
Text of the determination
Determination
Case number 879310
Financial firm AAI Limited
Determination | Case number: 879310 Page 1 of 5
Case number: 879310 5 May 2023
1 Determination overview
1.1 Complaint
The complainant’s unit was insured under a residential strata policy by the financial firm
(insurer). The complainant lodged a claim after her unit sustained water damage.
The insurer partially accepted liability and agreed to cash settle the claim. The insurer has
offered $35,018.90 plus a 10% uplift. The insurer has also offered an additional four weeks of
loss of rent from 31 July 2022 on the basis this is the estimated time to complete repairs.
The complainant disputes this. She has provided a quote for $71,101.75. She is also seeking
additional rent and non-financial loss.
1.2 Issues and key findings
What is the extent of the insurer’s liability ?
The insurer should pay $50,842.68 for the repairs and lost rent associated with this claim
(minus any excesses or policy deductibles). This is based on the following:
the insurer’s quote, which is fairer than the complainant’s, but should include a 20%
contingency
an allowance of 14 weeks loss of rent that accounts for the period the insurer was able to
settle the claim, the estimated timeframe of repairs and for the complainant to consider this
offer
Should the insurer pay non-financial loss?
Yes. Given the complainant’s claim experience, the insurer should pay $1,500 in non -financial
loss.
1.3 Determination
This determination is mostly in favour of the insurer.
Within 14 days of receiving notice the complainant accepts this determination, the insurer
should pay $52,342.68 (minus any excesses or policy deductibles) in full and final settlement
of this complaint.
Determination | Case number: 879310 Page 2 of 5
2 Reasons for determination
2.1 What is the extent of the insurer’s liability ?
Information does not show insurer did unauthorised works
The complainant alleges the insurer’s contractor entered her property and did various
unauthorised works. This included removing flooring, portions of the wall and skirting boards.
The complainant also says unused flooring and paint were stolen. This was discovered on 29
June 2022. She has provided photos in support.
The insurer says this was not done by its contractors. The insurer said there was no record of
a work order. Neither was a bill rendered.
The photos support the complainant’s position that works were done. However, the
information does not show it was done by the insurer’s contractors. In particular, the lack of
any work order or invoice is inconsistent with the complainant’s assertion they did the works.
There is also no information to show these contractors accessed the keys on or before 29
June 2022.
Therefore, I am not persuaded the insurer caused these issues.
Complainant’s q uote is not persuasive
Both parties have provided quotes. In comparing the two, I note the complainant’s quote
included the following additional works (totalling $15,015):
Checking and making safe electrical cable due to property disturbed by unknown people.
Checking and making safe plumbing pipes inside wall frame due to property disturbed by
unknown people.
Create 4-6 vents opening at sub floor exterior wall, check and apply pest control due to
timber damaged by flood.
Dig out trench along garage retaining wall, apply waterproofing & AG Pipes to lower side,
covered by blue metal & back fill with soil.
Check and clean the stormwater under pipe at front of garage
I am not persuaded these are repairs necessary to fix claim related damages. Most of these
appear to be maintenance or upgrades. For example, the application of waterproofing and the
installation of AG pipes does not appear to be necessary for the repair of claim related
damage but are upgrades to protect the property. This similarly applies to installing additional
vents. It is not clear pest control is required for the flooring. Checking and cleaning
stormwater appears maintenance. There is no information to show electrical cable and
plumbing pipes were damaged by the claimed event.
In addition to all this, the complainant’s quote does not include specific breakdowns of
materials and rates. Therefore, it is unclear if the rates applied are reasonable.
Given all this, I am not persuaded the complainant’s quote reflects a fair amount or scope of
works.
Fair for insurer to rely on its quote with a 20% contingency
I note the complainant has sought a cash settlement. Whilst the insurer says it is ready,
willing and able to do to the works, it has agreed to this outcome.
Determination | Case number: 879310 Page 3 of 5
In such circumstances, I accept it is fair for the insurer to rely on its own contractor’s quote.
However, I also accept a contingency should be applied to address the possible variances
and the transfer of risk.
The insurer offered 10%. However, an AFCA preliminary assessment increased this to 20%.
The insurer accepted this.
I agree that 20% is fair. There is no information to indicate a greater contingency is required.
Insurer should pay 14 weeks additional lost rent
The AFCA preliminary assessment concluded the insurer should pay an additional 14 weeks
loss of rent from 31 July 2022. This was based on the following:
the insurer provided its offer with its scope of works on 19 September 2022
the insurer’s estimated timeframe of repairs were preferred
an additional three weeks was allowed for the complainant to consider the offer.
The insurer agreed to this. The complainant has not provided any specific submission to
show why this is unfair.
I agree this outcome is fair. Loss of rent should be paid up to the point the insurer made a
reasonable offer to settle the claim related repair. Following this, an additional allowance of
seven weeks was included to factor the repairs based on the insurer’s estimate (which is
preferred) and for the complainant to consider the offer.
Given all this, I accept the insurer should pay $50,842.68 in full and final settlement of the
building repairs and loss of rent associated with this claim minus any policy excesses or
deductibles.
2.2 Should the insurer pay non-financial loss?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
It is fair for the insurer to pay $1,500 in non-financial loss
The complainant is seeking about $6,000 for non-financial loss due to her claims experience.
The insurer has agreed to pay $1,500 following AFCA’s preliminary assessment.
I accept there were some unreasonable delays. However, I do not accept this warrants an
additional amount for non-financial loss amount beyond that agreed by the insurer.
The insurer agreed to cash settle the claim in circumstances when it is not required to given
the policy provides it with the discretion as to how to settle claims. I have found that its cash
settlement offer was fair. The delays have been mitigated to a degree by the fact the insurer
has paid loss of rent through this intervening period.
Determination | Case number: 879310 Page 4 of 5
I am not persuaded the complainant’s allegation that the insurer did unauthorised works. I do
not accept the insurer is responsible for the delays caused in the complainant disputing its
cash settlement offer given its position is preferred.
Given all this, and considering our conservative approach, I accept $1,500 in non-financial
loss is fair.
Determination | Case number: 879310 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.