Cash settlement offer for water leak damage to rammed earth home and non-financial loss from claim handling
Text of the determination
Determination
Case number 878965
Financial firm AAI Limited
Determination | Case number: 878965 Page 1 of 12
Case number: 878965 30 November 2022
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm (insurer)
and lodged a claim in January 2019 after her property was damaged by a water leak.
The insurer accepted the claim and offered a cash settlement as it says it cannot warrant the
repairs due to the maintenance issues which have not been corrected by the complainant.
The complainant says the insurer must settle the claim up to the policy limit, including any
additional benefits. She says she cannot repair the property or find a builder prepared to do
the maintenance work despite multiple attempts to do so over the past three years.
The complainant seeks compensation for the delays in resolving the claim, and the impact of
the insurer’s decision to cancel her policy because the repair work was not completed.
1.2 Issues and key findings
Is insurer’s settlement offer fair and reasonable ?
No. Given the risks associated with the repair process it is fair the insurer pays the
complainant the sum insured of $356,892, plus temporary accommodation of $50,698.20 plus
$15,000 contents storage plus $2,500 for environmental improvements.
Is complainant entitled to non-financial loss compensation?
Yes. The complainant has suffered an unusual degree of physical inconvenience because of
the insure r’ s claims handling. Non-financial loss compensation $2,000 is fair in the
circumstances.
Why is the outcome fair?
This is a fair outcome as a cash settlement in lieu of repairs must be reflective of the true cost
of repair. The available information supports a finding that there are real risks associated with
the repair of the property such that it is likely to suffer significant further damage should
repairs be attempted.
1.3 Determination
This determination is in favour of the complainant. Within 14 days o f the complainant’s
acceptance of this determination the insurer is to pay the complainant:
$356,892 being the building sum insured
$50,698.20 for temporary accommodation as per the terms of the policy
$15,000 for contents storage during any repair process
$2,500 for environmental improvements
$2,000 compensation for non-financial loss
In view of the circumstances of this claim and determination, no interest is payable on the
settlement sum.
Determination | Case number: 878965 Page 2 of 12
2 Reasons for determination
2.1 Is insurer’s settlement offer fair a nd reasonable?
No. Given the risks associated with the repair process it is fair the insurer pays the
complainant the sum insured of $356,892, plus temporary accommodation of $50,698.20 plus
$15,000 contents storage plus $2,500 for environmental improvements.
Complainant has onus to prove claim falls within terms of the policy
It is established insurance law that an insured has the initial onus to prove on the balance of
probabilities (that is more likely than not) that the loss or damage claimed fall within the terms
of the policy. This is commonly called a prima facie claim.
The complainant ’ s home and contents policy is an insured event policy which provides cover
for a series of defined events including damage caused by escape of liquid. The policy also
includes the additional optional cover for accidental damage. Excerpts of the relevant policy
wording are provided in section 3 of this determination.
Circumstances of loss or damage
The complainant’s property was built around 1992 and purchased by the complainant in
2018. According to the available information after purchasing the property the complainant
had repairs completed to the roof sheeting and flashing. In late 2018 the complainant noticed
water flowing down the inside face of the south-east wall of the living area during heavy rain.
Repairs were completed to the roof flashing and additional overflow outlets were installed to
the north-west wall of the dwelling. It was later noted that the south-east wall of the living area
of the dwelling had rotated and separated from the ceiling lining with cacking observed to the
internal and external walls. dwelling,
On 31 January 2019 the complainant lodged a claim for cracking damage caused by water
leaking from a storm water system. The insurer does not dispute that there is damage to the
south eastern end of the home at least exacerbated by the storm water drainage faults
identified by its engineer IL. The insurer says the remaining damage claimed is due to
ongoing ground movement combined with gradual deterioration of the rammed earth walls
prevents the insurer warranting the repairs.
The panel accepts in these circumstances the complainant has established a valid claim
within the terms of the policy. What is disputed is the extent of the claimable loss.
Expert evidence shows significant damage from insured event
The panel has reviewed the available evidence and is satisfied this clearly establishes the
extent of damage caused by the insured event. The panel accepts not all damage was due to
the insured event.
The insurer’s engineers , IL and HC, came to similar conclusions on the cause of the damage
to the property generally. Both say the damage to the south eastern wall began because of
moisture causing foundation movement due to uncapped surface soil and long-term moisture
effects on the foundations.
However, both engineers also recognise there is a substantial contribution to this damage
because of the leaking storm water system. A geotechnical report from SG supports this view.
Determination | Case number: 878965 Page 3 of 12
SG found evidence of unusually wet soil local to the leak locations. The soil test carried out at
a further distance from the building does not have the same problem.
SG also identified unusual levels of moisture in soil recordings close to the northern side of
the building. There is no indication of a leaking pipe of other source of water local to this leak.
IL considered the abnormal moisture conditions in the founding soils along the south-eastern
elevation of the dwelling have resulted in the rotation of the footings and the rammed earth
wall above. When the south-eastern wall has rotated, the roof flashing has been damaged
which has allowed moisture to enter the rammed earth wall during rainfall. Over time this has
weakened and visibly degraded the wall.
IL found evidence of patching of damaged roof flashings sighted to the north-west and north-
east elevations of the dwelling, away from all reported stormwater drainage faults. This had
been completed prior to the complainant purchasing the property. IL considered this proof of
ongoing movement not related to the stormwater drainage faults at the property.
HC in a geotechnical report dated 15 January 2021 considered the moisture content of the
soil to be affected by several factors including possible leaking service trench and/or drain,
aggie drain next to footing and tree root drying. HC did not consider the rectification
works as set out in the scope of works could be commenced due to the abnormal
moisture conditions.
No evidence unknown defect a cause of the damage
The complainant says the walls were intact and external render had evidence of patches,
which is not unusual for an earth building. Constant maintenance is needed for this type of
construction as it is organic which expands and contracts according to the weather. The
complainant says she has lived in an earth structure for the last 30 plus years and is aware of
the maintenance responsibilities as a homeowner. She would have never purchased the
property if there were visible signs of major defects.
The panel accepts the complainant was not aware of any defects. The policy however only
provides cover for an unknown defect if damage is also caused by an insured event.
The panel accepts that while the complainant has established damage caused by the leaking
storm water system, the evidence establishes that this damage was limited to the area
around the southern walls. The other damage was not caused by an insured event but more
likely due to long term damage due to ground movement which is excluded from cover under
the terms of the policy. In so far as the foundation movement was an unknown event and
damaged the southern wall the insurer has accepted liability. As for the remaining damage as
that is not due to an insured event, it is not covered under the terms of the policy.
Safety issues prevent insurer for completing repairs
The insurer is seeking to settle its liability with a cash payment in lieu of completing repairs as
it says it cannot complete the claimable repair work due to the incomplete maintenance work
and safety issues.
The panel accepts the insurer is entitled to decline repairing damage where maintenance
issues exist which means it cannot warrant the repair work or there are safety concerns. The
insurer’s experts have supplied evidence showing the maintenance work which is not
complete and is a barrier to warranting the repairs.
Determination | Case number: 878965 Page 4 of 12
The insurer ’s plumber (MW) originally recommended repairs of the storm water system and
work to bring a roof gutter up to code. The complainant completed the storm water pit and
pipe repairs by 5 August 2019.
The complainant acknowledges the insurer is unable to get a trade to complete the
rectification works because of the instability of the affected wall and ongoing movement.
However, the complainant says she cannot locate anyone prepared to repair the gutter in line
with the insurer’s requirements. She supplied a sta tement from her preferred plumber (JN)
declining the gutter work and HC’s later maintenance work recommendations. JN says he will
not accept the job due to safety concerns he holds for anyone working on the property, and
the property occupants during the repair.
However, on balance, the panel is satisfied there is a significant safety issue preventing the
repairs and maintenance work from going ahead. The insurer also holds concerns about the
stability of the property if repair work proceeds as outlined in its correspondence with AFCA
on 26 September 2022. The insurer relies on the movement being pre-existing to the current
claim as grounds to limit its liability to only the area it says are damaged by the leak. The
complainant says the house has continued to deteriorate while it remains unrepaired.
Insurer to cash settle claim for sum insured
As the insurer cannot repair the property the complainant seeks the sum insured of $356,892
plus temporary accommodation and additional benefits during the repair process.
The insurer current offer of $222,663.79 includes:
$154,474.59 for building repairs ($134,325.73 is the repair quote, plus 15% contingency)
$50,689.20 for the maximum value payable under the temporary accommodation
additional benefit (noting the insurer says the entitlement to temporary accommodation will
be less than this, based on the repair timeframe estimates).
$15,000.00 for storage of undamaged contents (again, this is the policy limit which may not
be reached during the repair)
$2,500.00 for environmental improvements.
The panel is not satisfied the insurer can settle its liability with the payment it offered. This is
because the insurer accepted the risk of insuring the complainant’s property for loss or
damage, in line with the policy terms and conditions. There is no evidence suggesting the
complainant has in any way prevented the insurer from understanding the risk it was insuring,
being a rammed earth (adobe) building. Accordingly, the risk insured extends to repairs
including the nature of the building to be repaired.
Had the insurer elected to carry out repairs, it would not only bear the cost of repairs to the
actual damage identified, but would also bear the risk of addressing the instability of the
building during repairs, additional precautions which would be required to address safety
issues, and the risk of the unstable building being further damaged during the repair process
(for which it would be liable).
The insurer says the pre-existing damage is the reason the property is an unsound repair
prospect. However, this position is at odds with JN’s expert view which says the damaged
wall is what needs to come down so the maintenance work recommended by HC can
proceed. JN says that after a site inspection the areas of works to conduct the rectifications
are too unsafe to facilitate without creating further damages. JN says the site area is unsafe
and unstable (visibly) and while on-site small pieces of the walls inside and outside where
dropping. JN considered the only safe way to conduct rectification works is when the wall is
Determination | Case number: 878965 Page 5 of 12
down. JN expressed considerable concern for the safety of the trades if the repairs were to be
attempted and refused to carry out the rectification work with the wall in place.
The insure accepts liability for the wall
HC appears to be of the same opinion and has not stated pre-existing damage is the reason
the building cannot be repaired. Instead it appears to be a consequence of rebuilding the wall.
He is also requested whoever offers the repair quote should be prepared to complete and
then warrant the repair work.
In so far as there are undamaged defective parts preventing repair work from being supported
the panel notes the policy requires awareness on the part of the complainant of the structural
or design fault which was not addressed prior to the loss or damage. The complainant denies
any such awareness and confirms had she known of a defect when purchasing the property
in 2018, she would not have proceeded with the purchase. The panel accepts this logic as it
is consistent and reasonable.
Further, it would be unfair for the insurer to limit its liability based on damage that has
occurred since the complainant became aware of the defects. There is no evidence showing
the complainant could have completed this repair work any sooner. She remains unable to
find any trades who will assist her with repairing a building of this nature in its current state of
damage.
The insurer ’ s liability extends to the true cost of repairing the property, which includes
repairing any damage occurring while the insured repair is being completed. Any cash
settlement should reflect those additional risks and costs, as the insurer would be passing
these risks to the complainant.
Therefore, the panel remains satisfied the complainant is entitled to her claimable loss,
including losses which occur trying to complete the repair work. This is likely because of the
risk to be significantly higher than the quoted repairs.
This claim has now been on foot close to four years. In the panel ’ s view given the
circumstances of this claim it is fair the insurer pays the complainant the sum insured
($356,892) to cover the repair costs and likely contingencies.
The policy also provides for temporary accommodation benefits. The insurer has offered to
pay the temporary accommodation in full ($50,689.20). The panel considers this fair given the
property is currently unsafe to live in and it is likely to take some time for the complainant to
arrange for a suitably qualified repairer to complete the specialist repairs required.
It is also fair the insurer pays $15,000 for the storage of contents as offered as per the terms
of the policy and $2,500 for the environmental improvements.
The panel has also considered whether interest should be paid on the cash settlement. Given
the circumstances of this complainant and uncertainty over whether the repairs could be
safely completed the panel is satisfied the insurer has not unreasonably withheld finalisation
of the claim. Further in determining the cash settlement the panel recognises that in the
unlikely event the complainant can complete the repairs this could result in a financial
windfall. Given all the circumstances, the panel considers it is not appropriate to award
interest on the cash settlement.
Determination | Case number: 878965 Page 6 of 12
2.2 Is complainant entitled to non-financial loss compensation?
Yes. The complainant has suffered an unusual degree of physical inconvenience because of
the insurer’s claims handling. Non -financial loss compensation $2,000 is fair in the
circumstances.
An award of non-financial loss is warranted
Under the AFCA Rules, we may award up to $5,400 compensation for non-financial loss. We
will only award this type of compensation if you suffer an unusual degree of physical
inconvenience, delay in resolving the claim, or interference with a complainant’s enjoyment of
peace of mind.
We recognise that making a claim can be stressful and time-consuming, even if the insurer
handles the claim correctly. We will not award compensation for the ordinary degree of
inconvenience that comes with making a claim.
Complainant entitled to compensation for non-financial loss
The panel is satisfied an award of non-financial loss compensation is warranted in these
circumstances. The panel recognises this was an exceptionally long claim process, and the
strain the complainant endured due to the ongoing disruption in her life as the building
deteriorated.
The panel accepts this is an unusual claim. The insurer could not proceed with the repair
work and has generally followed the expert evidence when deciding how to proceed with the
claim. This led to multiple long drying periods and a difficult process of locating tradesmen
experienced in this kind of work, which was a challenge both parties endured. The panel is
not satisfied these are things necessarily within the insurer’s control or are themselves an
error in claim handling.
The complainant has been under great strain as she could not complete the maintenance
repairs required and as this matter dragged out observed the deterioration in the property.
She was placed in a position where she no longer had insurance. This situation has been
ongoing as she has not able to secure alternative insurance of her damaged property and her
uninsured risk now extends to her contents as well as her home building. This has caused an
unusual degree of physical inconvenience and stress.
In the circumstances while the panel is satisfied the complainant has been reasonably robust,
the panel determines it is fair for the insurer to pay $2,000 compensation for non-financial
loss.
2.3 Why is the outcome fair?
This is a fair outcome as a cash settlement in lieu of repairs must be reflective of the true cost
of repair. The available information supports a finding that there are real risks associated with
the repair of the property such that it is likely to suffer significant further damage should
repairs be attempted. The risks are associated with the removal of the accepted damaged
area and are such that neither party has been able to secure trades to complete the repairs.
As a result, the property has continued to deteriorate. The cash settlement for the sum
insured represents a fair outcome in the circumstances.
Further, it is fair the insurer compensates the complainant for the claim experience where
avoidable errors made an already difficult claim journey more difficult.
Determination | Case number: 878965 Page 7 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 878965 Page 8 of 12
3.2 Relevant policy information
Insured events
Escape of liquid
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and
sewage systems;
…
Accidental damage at the home
We cover
When you have home insurance, we cover your home for accidental loss (e.g. losing
something) and accidental damage (e.g. breaking or damaging something) at the insured
address during the period of insurance.
When you have contents insurance, we cover your contents for accidental loss (e.g. losing
something) and accidental damage (e.g. breaking or damaging something) at the insured
address during the period of insurance.
Words with special meanings
Accidental loss or damage
means loss or damage that occurs without intent.
General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement, but we will cover landslide or subsidence that is specifically covered under
the following insured events:
Storm’ (see page 22);
Flood’ (see page 20);
Earthquake and Tsunami’ (see page 23);
Explosion’ (see page 29).
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric
or climatic conditions or gradual deterioration such as but not limited to:
tiles and their adhesive or grouting breaking down;
weathering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.
Determination | Case number: 878965 Page 9 of 12
How we settle your claim
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:
repair damage to your home;
rebuild your home;
pay you what it would cost us to repair or rebuild your home;
pay you the sum insured for your home;
give you a voucher, store credit or stored value card for the amount it would cost us to
repair or rebuild an item.
If we rebuild (or pa y you what it would cost us to rebuild), we will do so on a ‘new for old’
basis.
If we repair (or pay you what it would cost us to repair), we will at our option do so on a ‘new
for old’ basis or to a similar condition to what your home was in before the l oss or damage
occurred.
If we choose to pay you what it would cost us to rebuild or repair your damaged home, you
are not eligible for cover under additional feature ‘Other repair/rebuilding costs’, see page 31.
Unless we tell you otherwise, we will deduct any amounts you owe us from any amount we
owe you.
Dealing with defects
If a known defect is the cause of the damage
We do not pay for loss or damage caused by a defect, structural fault or design fault at your
home that you knew about (or should reasonably have known about) and did not fix before
the loss or damage occurred.
If an unknown defect is the cause of the damage
If an incident covered by your policy damages your home and an unknown defect was the
cause or part of the cause, we will pay for the resulting damage. If the unknown defective part
of your home is also damaged by the same incident, we will fix this as well.
We do not rectify structural or design faults
When we accept a claim, we will not pay extra to rectify a structural or design fault at your
home that you knew about (or should have reasonably known about). We will only pay you
what it would have cost us to fix the damage from the incident covered by your policy or if we
agree, you can pay us the extra amount it costs to rectify the structural or design fault at your
home.
If undamaged defective parts of your home will not support repairs
If undamaged defective parts of your home you knew about (or should reasonably have
known about) will not support repairing the damage caused by an incident covered by your
policy, we will only pay what it would have cost us to repair the damage had your home not
been defective.
For known defects or faults
Once you become aware of a defect, structural or design fault at the home, you must rectify it
as soon as possible because there is no cover for loss or damage due to that defect. If you do
Determination | Case number: 878965 Page 10 of 12
not rectify the defect or fault, you may not be covered or we might not offer a renewal of your
policy.
3.3 Expert evidence summary
Record Key points
Insurer ’s plumber ( MW )
Report
7 March 2019
storm water pit found to be blocked
drainage lines to left and right of the pit clear and in good condition
storm water pit outlet completely blocked and likely broken
storm water charged line failed as not holding head wat er
indicating a leak on the charged line
no other leaks detected
recent roof repairs to box gutter, but do not meet Australian
standard due to corner turn at front right - hand side
recent sealing of capping and flashings around various sections of
the roof
some capping and flashings not sealed
mud brick is sucking up wat er and causing it to break down.
Insurer’s geotechnical expert
( SG )
Report
22 May 2019
soil moistures at tests sites one and three showing a general trend
of wetting up with depth in comparison to test sites two and four
sites two and four show typical res ults below dept hs of 1000mm
site locations shown in the report with one and three being close
to the location of the pipes highlight ed in MW’s report as a
concern
there was an initial high reading at test site two which may be
related to a localised leak or garden watering nearby
there is an anomaly at the 1000mm mark of test site three which is
noticeably drier than the 700mm and 1500mm marks likely due to
tree roots
soil moisture rea dings are potentially caused by leaking pipes
and/or services and longer - term tree drying.
Insurer’s engineer ( IL )
Report
2 4 May 2019
damage to south east end of the dwelling exac erbated by
stormwat er drainage faults
initial damage can be attributed to uncapped perimeter soils,
natural seasonal movement of foundation soil, and long - t erm
foundation movement
the storm water leak has resulted in abnormal moisture conditions
adjacent to the building footings
abnormal mois ture conditions have caused rotation of the footings
of the south eastern wall, leading to cracks and further water
ingress, which visibly degraded the wall over time
foundation movement s to the north west and north east walls are
pre - existing and unrelate d to the leak near the sout h east wall
patching of the north east and nort h west walls was completed
prior to purchasing the property according to the complainant’s
partner
Determination | Case number: 878965 Page 11 of 12
Record Key points
landscaping around the building perimeter includes permeable
gravel toppings and in sufficient surface grading leading to water
penetrating soil adjacent to the footings
influence of the storm water leak to south eastern wall damage is
70% versus 30% contribution from uncapped soils and natural or
long - term foundation movement.
Insurer’s a sse ssor ( H R )
Report
27 August 2020
complainant has completed drainage maintenance repairs to the
broken storm water and charged lines at the south east wall
full scope of MW’s maintenance recommendations not completed
complainant advised she cannot get anyone to do the remaining
maintenance work with the wall in its current condition
due to structural nature of the required repairs, H R referring back
to the insurer to assign a more suitable repairer
a structural engineer and rammed earth repair specialist required
for repair scope of works.
Complainant’s plumber (JN)
Email
29 September 2021
indicates he cannot complete the maintenance work requested
safely
potential for further damage to the property while repairing it
only safe method of repairing maintenance work is when the sout h
eastern wall has been removed
JN is not prepared to proceed with the offered work.
Insurer’s engineer ( HC )
Report
15 January 2021
based on soil test of 3 December 2020, soil moisture has not
stabilised
soil m oisture may be being affected by a possible service trench
leak, aggie drain leak, or tree root drying
in our opinion the repair work cannot be completed at this stage
recommend testing all services for leaks, remove aggie drain and
backfill trenc h with compacted clay, remove trees which may be
influencing the footing soil, and construct paving around perimeter
of the building to meet NCC requirements
review soil moisture stability again in 12 months.
Insurer’s building co -
ordinator ( BH )
Report
15 Febru ary 2021
policy response should include proportional liability for the damage
caused by the storm water leaks versus the other foundation
movement causes
recommend PB provide an alternative repair quote due to
experience with rammed earth construction
engi neer to supply proximate percentages for resultant damage.
Insurer’s engineer ( HC )
Report
12 November 2021
second inspection was to provide advice regarding demolition of
part of the rammed earth wall to enable maintenance work
further deterioration noted as maintenance work is not completed
by the owner
insured reported multiple rammed eart h repairers have declined
reconstruction work due to poor quality of the current walls
our office is hesitant to prepare documents detailing the wall
Determination | Case number: 878965 Page 12 of 12
Record Key points
removal as it may not be reconstructed without significant further
demolition taking place
a rammed earth cont ractor willing to carry out the works may not
be able to be sourced
we recommend no demolition proceed until a rammed earth
specialist provides an opinion on r e - building the wall along wit h
willingness to carry out and warrant the work.
Insurer’s building co -
ordinator ( JB )
Report
7 January 2022
rammed earth specialist quote is an actionable quote with respect
to the areas of liability
given concerns regarding maint enance and defective application
of external walls, PB estimate can only be regarded as a liability
estimate.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.