Home / Suncorp Group / Determination 878965

Determination 878965

Cash settlement offer for water leak damage to rammed earth home and non-financial loss from claim handling

FirmSuncorp Group
Decided2022-12-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$409,590
Non-financial loss$2,000
Amount claimed$356,892
SourceAFCA PDF

Summary

A householder claimed for water leak damage to her rammed earth home and the insurer offered a cash settlement of $222,663.79. AFCA found the insurer should pay the sum insured, temporary accommodation, contents storage, environmental improvements and $2,000 non-financial loss compensation.

Under the policy, the insurer must bear the true cost of repair, including risks of further damage during repair of an unstable building, so a cash settlement must reflect the full sum insured.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 878965 Financial firm AAI Limited Determination | Case number: 878965 Page 1 of 12 Case number: 878965 30 November 2022 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer) and lodged a claim in January 2019 after her property was damaged by a water leak. The insurer accepted the claim and offered a cash settlement as it says it cannot warrant the repairs due to the maintenance issues which have not been corrected by the complainant. The complainant says the insurer must settle the claim up to the policy limit, including any additional benefits. She says she cannot repair the property or find a builder prepared to do the maintenance work despite multiple attempts to do so over the past three years. The complainant seeks compensation for the delays in resolving the claim, and the impact of the insurer’s decision to cancel her policy because the repair work was not completed. 1.2 Issues and key findings Is insurer’s settlement offer fair and reasonable ? No. Given the risks associated with the repair process it is fair the insurer pays the complainant the sum insured of $356,892, plus temporary accommodation of $50,698.20 plus $15,000 contents storage plus $2,500 for environmental improvements. Is complainant entitled to non-financial loss compensation? Yes. The complainant has suffered an unusual degree of physical inconvenience because of the insure r’ s claims handling. Non-financial loss compensation $2,000 is fair in the circumstances. Why is the outcome fair? This is a fair outcome as a cash settlement in lieu of repairs must be reflective of the true cost of repair. The available information supports a finding that there are real risks associated with the repair of the property such that it is likely to suffer significant further damage should repairs be attempted. 1.3 Determination This determination is in favour of the complainant. Within 14 days o f the complainant’s acceptance of this determination the insurer is to pay the complainant:  $356,892 being the building sum insured  $50,698.20 for temporary accommodation as per the terms of the policy  $15,000 for contents storage during any repair process  $2,500 for environmental improvements  $2,000 compensation for non-financial loss In view of the circumstances of this claim and determination, no interest is payable on the settlement sum. Determination | Case number: 878965 Page 2 of 12 2 Reasons for determination 2.1 Is insurer’s settlement offer fair a nd reasonable? No. Given the risks associated with the repair process it is fair the insurer pays the complainant the sum insured of $356,892, plus temporary accommodation of $50,698.20 plus $15,000 contents storage plus $2,500 for environmental improvements. Complainant has onus to prove claim falls within terms of the policy It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed fall within the terms of the policy. This is commonly called a prima facie claim. The complainant ’ s home and contents policy is an insured event policy which provides cover for a series of defined events including damage caused by escape of liquid. The policy also includes the additional optional cover for accidental damage. Excerpts of the relevant policy wording are provided in section 3 of this determination. Circumstances of loss or damage The complainant’s property was built around 1992 and purchased by the complainant in 2018. According to the available information after purchasing the property the complainant had repairs completed to the roof sheeting and flashing. In late 2018 the complainant noticed water flowing down the inside face of the south-east wall of the living area during heavy rain. Repairs were completed to the roof flashing and additional overflow outlets were installed to the north-west wall of the dwelling. It was later noted that the south-east wall of the living area of the dwelling had rotated and separated from the ceiling lining with cacking observed to the internal and external walls. dwelling, On 31 January 2019 the complainant lodged a claim for cracking damage caused by water leaking from a storm water system. The insurer does not dispute that there is damage to the south eastern end of the home at least exacerbated by the storm water drainage faults identified by its engineer IL. The insurer says the remaining damage claimed is due to ongoing ground movement combined with gradual deterioration of the rammed earth walls prevents the insurer warranting the repairs. The panel accepts in these circumstances the complainant has established a valid claim within the terms of the policy. What is disputed is the extent of the claimable loss. Expert evidence shows significant damage from insured event The panel has reviewed the available evidence and is satisfied this clearly establishes the extent of damage caused by the insured event. The panel accepts not all damage was due to the insured event. The insurer’s engineers , IL and HC, came to similar conclusions on the cause of the damage to the property generally. Both say the damage to the south eastern wall began because of moisture causing foundation movement due to uncapped surface soil and long-term moisture effects on the foundations. However, both engineers also recognise there is a substantial contribution to this damage because of the leaking storm water system. A geotechnical report from SG supports this view. Determination | Case number: 878965 Page 3 of 12 SG found evidence of unusually wet soil local to the leak locations. The soil test carried out at a further distance from the building does not have the same problem. SG also identified unusual levels of moisture in soil recordings close to the northern side of the building. There is no indication of a leaking pipe of other source of water local to this leak. IL considered the abnormal moisture conditions in the founding soils along the south-eastern elevation of the dwelling have resulted in the rotation of the footings and the rammed earth wall above. When the south-eastern wall has rotated, the roof flashing has been damaged which has allowed moisture to enter the rammed earth wall during rainfall. Over time this has weakened and visibly degraded the wall. IL found evidence of patching of damaged roof flashings sighted to the north-west and north- east elevations of the dwelling, away from all reported stormwater drainage faults. This had been completed prior to the complainant purchasing the property. IL considered this proof of ongoing movement not related to the stormwater drainage faults at the property. HC in a geotechnical report dated 15 January 2021 considered the moisture content of the soil to be affected by several factors including possible leaking service trench and/or drain, aggie drain next to footing and tree root drying. HC did not consider the rectification works as set out in the scope of works could be commenced due to the abnormal moisture conditions. No evidence unknown defect a cause of the damage The complainant says the walls were intact and external render had evidence of patches, which is not unusual for an earth building. Constant maintenance is needed for this type of construction as it is organic which expands and contracts according to the weather. The complainant says she has lived in an earth structure for the last 30 plus years and is aware of the maintenance responsibilities as a homeowner. She would have never purchased the property if there were visible signs of major defects. The panel accepts the complainant was not aware of any defects. The policy however only provides cover for an unknown defect if damage is also caused by an insured event. The panel accepts that while the complainant has established damage caused by the leaking storm water system, the evidence establishes that this damage was limited to the area around the southern walls. The other damage was not caused by an insured event but more likely due to long term damage due to ground movement which is excluded from cover under the terms of the policy. In so far as the foundation movement was an unknown event and damaged the southern wall the insurer has accepted liability. As for the remaining damage as that is not due to an insured event, it is not covered under the terms of the policy. Safety issues prevent insurer for completing repairs The insurer is seeking to settle its liability with a cash payment in lieu of completing repairs as it says it cannot complete the claimable repair work due to the incomplete maintenance work and safety issues. The panel accepts the insurer is entitled to decline repairing damage where maintenance issues exist which means it cannot warrant the repair work or there are safety concerns. The insurer’s experts have supplied evidence showing the maintenance work which is not complete and is a barrier to warranting the repairs. Determination | Case number: 878965 Page 4 of 12 The insurer ’s plumber (MW) originally recommended repairs of the storm water system and work to bring a roof gutter up to code. The complainant completed the storm water pit and pipe repairs by 5 August 2019. The complainant acknowledges the insurer is unable to get a trade to complete the rectification works because of the instability of the affected wall and ongoing movement. However, the complainant says she cannot locate anyone prepared to repair the gutter in line with the insurer’s requirements. She supplied a sta tement from her preferred plumber (JN) declining the gutter work and HC’s later maintenance work recommendations. JN says he will not accept the job due to safety concerns he holds for anyone working on the property, and the property occupants during the repair. However, on balance, the panel is satisfied there is a significant safety issue preventing the repairs and maintenance work from going ahead. The insurer also holds concerns about the stability of the property if repair work proceeds as outlined in its correspondence with AFCA on 26 September 2022. The insurer relies on the movement being pre-existing to the current claim as grounds to limit its liability to only the area it says are damaged by the leak. The complainant says the house has continued to deteriorate while it remains unrepaired. Insurer to cash settle claim for sum insured As the insurer cannot repair the property the complainant seeks the sum insured of $356,892 plus temporary accommodation and additional benefits during the repair process. The insurer current offer of $222,663.79 includes:  $154,474.59 for building repairs ($134,325.73 is the repair quote, plus 15% contingency)  $50,689.20 for the maximum value payable under the temporary accommodation additional benefit (noting the insurer says the entitlement to temporary accommodation will be less than this, based on the repair timeframe estimates).  $15,000.00 for storage of undamaged contents (again, this is the policy limit which may not be reached during the repair)  $2,500.00 for environmental improvements. The panel is not satisfied the insurer can settle its liability with the payment it offered. This is because the insurer accepted the risk of insuring the complainant’s property for loss or damage, in line with the policy terms and conditions. There is no evidence suggesting the complainant has in any way prevented the insurer from understanding the risk it was insuring, being a rammed earth (adobe) building. Accordingly, the risk insured extends to repairs including the nature of the building to be repaired. Had the insurer elected to carry out repairs, it would not only bear the cost of repairs to the actual damage identified, but would also bear the risk of addressing the instability of the building during repairs, additional precautions which would be required to address safety issues, and the risk of the unstable building being further damaged during the repair process (for which it would be liable). The insurer says the pre-existing damage is the reason the property is an unsound repair prospect. However, this position is at odds with JN’s expert view which says the damaged wall is what needs to come down so the maintenance work recommended by HC can proceed. JN says that after a site inspection the areas of works to conduct the rectifications are too unsafe to facilitate without creating further damages. JN says the site area is unsafe and unstable (visibly) and while on-site small pieces of the walls inside and outside where dropping. JN considered the only safe way to conduct rectification works is when the wall is Determination | Case number: 878965 Page 5 of 12 down. JN expressed considerable concern for the safety of the trades if the repairs were to be attempted and refused to carry out the rectification work with the wall in place. The insure accepts liability for the wall HC appears to be of the same opinion and has not stated pre-existing damage is the reason the building cannot be repaired. Instead it appears to be a consequence of rebuilding the wall. He is also requested whoever offers the repair quote should be prepared to complete and then warrant the repair work. In so far as there are undamaged defective parts preventing repair work from being supported the panel notes the policy requires awareness on the part of the complainant of the structural or design fault which was not addressed prior to the loss or damage. The complainant denies any such awareness and confirms had she known of a defect when purchasing the property in 2018, she would not have proceeded with the purchase. The panel accepts this logic as it is consistent and reasonable. Further, it would be unfair for the insurer to limit its liability based on damage that has occurred since the complainant became aware of the defects. There is no evidence showing the complainant could have completed this repair work any sooner. She remains unable to find any trades who will assist her with repairing a building of this nature in its current state of damage. The insurer ’ s liability extends to the true cost of repairing the property, which includes repairing any damage occurring while the insured repair is being completed. Any cash settlement should reflect those additional risks and costs, as the insurer would be passing these risks to the complainant. Therefore, the panel remains satisfied the complainant is entitled to her claimable loss, including losses which occur trying to complete the repair work. This is likely because of the risk to be significantly higher than the quoted repairs. This claim has now been on foot close to four years. In the panel ’ s view given the circumstances of this claim it is fair the insurer pays the complainant the sum insured ($356,892) to cover the repair costs and likely contingencies. The policy also provides for temporary accommodation benefits. The insurer has offered to pay the temporary accommodation in full ($50,689.20). The panel considers this fair given the property is currently unsafe to live in and it is likely to take some time for the complainant to arrange for a suitably qualified repairer to complete the specialist repairs required. It is also fair the insurer pays $15,000 for the storage of contents as offered as per the terms of the policy and $2,500 for the environmental improvements. The panel has also considered whether interest should be paid on the cash settlement. Given the circumstances of this complainant and uncertainty over whether the repairs could be safely completed the panel is satisfied the insurer has not unreasonably withheld finalisation of the claim. Further in determining the cash settlement the panel recognises that in the unlikely event the complainant can complete the repairs this could result in a financial windfall. Given all the circumstances, the panel considers it is not appropriate to award interest on the cash settlement. Determination | Case number: 878965 Page 6 of 12 2.2 Is complainant entitled to non-financial loss compensation? Yes. The complainant has suffered an unusual degree of physical inconvenience because of the insurer’s claims handling. Non -financial loss compensation $2,000 is fair in the circumstances. An award of non-financial loss is warranted Under the AFCA Rules, we may award up to $5,400 compensation for non-financial loss. We will only award this type of compensation if you suffer an unusual degree of physical inconvenience, delay in resolving the claim, or interference with a complainant’s enjoyment of peace of mind. We recognise that making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim. Complainant entitled to compensation for non-financial loss The panel is satisfied an award of non-financial loss compensation is warranted in these circumstances. The panel recognises this was an exceptionally long claim process, and the strain the complainant endured due to the ongoing disruption in her life as the building deteriorated. The panel accepts this is an unusual claim. The insurer could not proceed with the repair work and has generally followed the expert evidence when deciding how to proceed with the claim. This led to multiple long drying periods and a difficult process of locating tradesmen experienced in this kind of work, which was a challenge both parties endured. The panel is not satisfied these are things necessarily within the insurer’s control or are themselves an error in claim handling. The complainant has been under great strain as she could not complete the maintenance repairs required and as this matter dragged out observed the deterioration in the property. She was placed in a position where she no longer had insurance. This situation has been ongoing as she has not able to secure alternative insurance of her damaged property and her uninsured risk now extends to her contents as well as her home building. This has caused an unusual degree of physical inconvenience and stress. In the circumstances while the panel is satisfied the complainant has been reasonably robust, the panel determines it is fair for the insurer to pay $2,000 compensation for non-financial loss. 2.3 Why is the outcome fair? This is a fair outcome as a cash settlement in lieu of repairs must be reflective of the true cost of repair. The available information supports a finding that there are real risks associated with the repair of the property such that it is likely to suffer significant further damage should repairs be attempted. The risks are associated with the removal of the accepted damaged area and are such that neither party has been able to secure trades to complete the repairs. As a result, the property has continued to deteriorate. The cash settlement for the sum insured represents a fair outcome in the circumstances. Further, it is fair the insurer compensates the complainant for the claim experience where avoidable errors made an already difficult claim journey more difficult. Determination | Case number: 878965 Page 7 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 878965 Page 8 of 12 3.2 Relevant policy information Insured events Escape of liquid We cover Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:  …  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  … Accidental damage at the home We cover When you have home insurance, we cover your home for accidental loss (e.g. losing something) and accidental damage (e.g. breaking or damaging something) at the insured address during the period of insurance. When you have contents insurance, we cover your contents for accidental loss (e.g. losing something) and accidental damage (e.g. breaking or damaging something) at the insured address during the period of insurance. Words with special meanings Accidental loss or damage means loss or damage that occurs without intent. General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  Storm’ (see page 22);  Flood’ (see page 20);  Earthquake and Tsunami’ (see page 23);  Explosion’ (see page 29). Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to:  tiles and their adhesive or grouting breaking down;  weathering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. Determination | Case number: 878965 Page 9 of 12 How we settle your claim We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:  repair damage to your home;  rebuild your home;  pay you what it would cost us to repair or rebuild your home;  pay you the sum insured for your home;  give you a voucher, store credit or stored value card for the amount it would cost us to repair or rebuild an item. If we rebuild (or pa y you what it would cost us to rebuild), we will do so on a ‘new for old’ basis. If we repair (or pay you what it would cost us to repair), we will at our option do so on a ‘new for old’ basis or to a similar condition to what your home was in before the l oss or damage occurred. If we choose to pay you what it would cost us to rebuild or repair your damaged home, you are not eligible for cover under additional feature ‘Other repair/rebuilding costs’, see page 31. Unless we tell you otherwise, we will deduct any amounts you owe us from any amount we owe you. Dealing with defects If a known defect is the cause of the damage We do not pay for loss or damage caused by a defect, structural fault or design fault at your home that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred. If an unknown defect is the cause of the damage If an incident covered by your policy damages your home and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of your home is also damaged by the same incident, we will fix this as well. We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at your home that you knew about (or should have reasonably known about). We will only pay you what it would have cost us to fix the damage from the incident covered by your policy or if we agree, you can pay us the extra amount it costs to rectify the structural or design fault at your home. If undamaged defective parts of your home will not support repairs If undamaged defective parts of your home you knew about (or should reasonably have known about) will not support repairing the damage caused by an incident covered by your policy, we will only pay what it would have cost us to repair the damage had your home not been defective. For known defects or faults Once you become aware of a defect, structural or design fault at the home, you must rectify it as soon as possible because there is no cover for loss or damage due to that defect. If you do Determination | Case number: 878965 Page 10 of 12 not rectify the defect or fault, you may not be covered or we might not offer a renewal of your policy. 3.3 Expert evidence summary Record Key points Insurer ’s plumber ( MW ) Report 7 March 2019  storm water pit found to be blocked  drainage lines to left and right of the pit clear and in good condition  storm water pit outlet completely blocked and likely broken  storm water charged line failed as not holding head wat er indicating a leak on the charged line  no other leaks detected  recent roof repairs to box gutter, but do not meet Australian standard due to corner turn at front right - hand side  recent sealing of capping and flashings around various sections of the roof  some capping and flashings not sealed  mud brick is sucking up wat er and causing it to break down. Insurer’s geotechnical expert ( SG ) Report 22 May 2019  soil moistures at tests sites one and three showing a general trend of wetting up with depth in comparison to test sites two and four  sites two and four show typical res ults below dept hs of 1000mm  site locations shown in the report with one and three being close to the location of the pipes highlight ed in MW’s report as a concern  there was an initial high reading at test site two which may be related to a localised leak or garden watering nearby  there is an anomaly at the 1000mm mark of test site three which is noticeably drier than the 700mm and 1500mm marks likely due to tree roots  soil moisture rea dings are potentially caused by leaking pipes and/or services and longer - term tree drying. Insurer’s engineer ( IL ) Report 2 4 May 2019  damage to south east end of the dwelling exac erbated by stormwat er drainage faults  initial damage can be attributed to uncapped perimeter soils, natural seasonal movement of foundation soil, and long - t erm foundation movement  the storm water leak has resulted in abnormal moisture conditions adjacent to the building footings  abnormal mois ture conditions have caused rotation of the footings of the south eastern wall, leading to cracks and further water ingress, which visibly degraded the wall over time  foundation movement s to the north west and north east walls are pre - existing and unrelate d to the leak near the sout h east wall  patching of the north east and nort h west walls was completed prior to purchasing the property according to the complainant’s partner Determination | Case number: 878965 Page 11 of 12 Record Key points  landscaping around the building perimeter includes permeable gravel toppings and in sufficient surface grading leading to water penetrating soil adjacent to the footings  influence of the storm water leak to south eastern wall damage is 70% versus 30% contribution from uncapped soils and natural or long - term foundation movement. Insurer’s a sse ssor ( H R ) Report 27 August 2020  complainant has completed drainage maintenance repairs to the broken storm water and charged lines at the south east wall  full scope of MW’s maintenance recommendations not completed  complainant advised she cannot get anyone to do the remaining maintenance work with the wall in its current condition  due to structural nature of the required repairs, H R referring back to the insurer to assign a more suitable repairer  a structural engineer and rammed earth repair specialist required for repair scope of works. Complainant’s plumber (JN) Email 29 September 2021  indicates he cannot complete the maintenance work requested safely  potential for further damage to the property while repairing it  only safe method of repairing maintenance work is when the sout h eastern wall has been removed  JN is not prepared to proceed with the offered work. Insurer’s engineer ( HC ) Report 15 January 2021  based on soil test of 3 December 2020, soil moisture has not stabilised  soil m oisture may be being affected by a possible service trench leak, aggie drain leak, or tree root drying  in our opinion the repair work cannot be completed at this stage  recommend testing all services for leaks, remove aggie drain and backfill trenc h with compacted clay, remove trees which may be influencing the footing soil, and construct paving around perimeter of the building to meet NCC requirements  review soil moisture stability again in 12 months. Insurer’s building co - ordinator ( BH ) Report 15 Febru ary 2021  policy response should include proportional liability for the damage caused by the storm water leaks versus the other foundation movement causes  recommend PB provide an alternative repair quote due to experience with rammed earth construction  engi neer to supply proximate percentages for resultant damage. Insurer’s engineer ( HC ) Report 12 November 2021  second inspection was to provide advice regarding demolition of part of the rammed earth wall to enable maintenance work  further deterioration noted as maintenance work is not completed by the owner  insured reported multiple rammed eart h repairers have declined reconstruction work due to poor quality of the current walls  our office is hesitant to prepare documents detailing the wall Determination | Case number: 878965 Page 12 of 12 Record Key points removal as it may not be reconstructed without significant further demolition taking place  a rammed earth cont ractor willing to carry out the works may not be able to be sourced  we recommend no demolition proceed until a rammed earth specialist provides an opinion on r e - building the wall along wit h willingness to carry out and warrant the work. Insurer’s building co - ordinator ( JB ) Report 7 January 2022  rammed earth specialist quote is an actionable quote with respect to the areas of liability  given concerns regarding maint enance and defective application of external walls, PB estimate can only be regarded as a liability estimate.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.